The man-hours for project integration activities normally appear at which WBS level?
Correct Answer: B
As I understood from referring most materials, the 1st of WBS is the Project or the program as a whole. The last level of WBS (usually the 4th) is the work package level. Irrespective of what is there in which level, the cost of integration will definitely be greater in the Work Package level than the cost of integrating the higher level components. As the level of decomposition increases, the costs of integrating each of the pieces will definitely increase. At least this is how I understood.