Valid PMP Dumps shared by ExamDiscuss.com for Helping Passing PMP Exam! ExamDiscuss.com now offer the newest PMP exam dumps, the ExamDiscuss.com PMP exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com PMP dumps with Test Engine here:

Access PMP Dumps Premium Version
(198 Q&As Dumps, 35%OFF Special Discount Code: freecram)

<< Prev Question Next Question >>

Question 288/3515

Going from Level 2 to Level 4 in the work breakdown structure will result in

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (3515q)
Question 1: Which of the following statements are FALSE regarding the cr...
Question 2: Which of the following is not a definition to determine a pr...
Question 3: Which of the following compression techniques increases risk...
Question 4: If a project manager is concerned with gathering, integratin...
Question 5: A new project manager is having difficulty creating a WBS wi...
Question 6: When there is uncertainty associated with one or more aspect...
Question 7: Project Procurement Management has the following processes:...
Question 8: You have been hired as a contract project manager for Grapev...
Question 9: Which of the following is NOT an input of the Contract Admin...
Question 10: All of the following statements are true regarding cost-reim...
Question 11: Project managers that are available to answer questions, pro...
Question 12: All of the following are reporting techniques used in the Co...
Question 13: Formal authority is often referred to as legitimate power. W...
Question 14: What are the schedule variance and the schedule performance ...
Question 15: The "To Complete Performance Index" (TCPI) is calculated by:...
Question 16: What is the job title of the person who is primarily respons...
Question 17: You are managing a large construction project that's been br...
Question 18: Which is not one of the triple constraint of a project?...
Question 19: You are a contract project manager for a wholesale flower di...
Question 20: You are in the process of monitoring the various project pro...
Question 21: A junior project manager at your company does not know how t...
Question 22: Which of the following describes an input to the direct and ...
Question 23: You are using the three-point estimating technique to estima...
Question 24: Which of the following process is involved with the completi...
Question 25: In which process is formal acceptance and handover of the fi...
Question 26: Being assigned as a project manager, you noticed during exec...
Question 27: A problem occurs on an activity with free float and the proj...
Question 28: Which of the following is not one of Crosby's Four Absolutes...
Question 29: What is the difference between expected monetary value and n...
Question 30: A histogram ordered by frequency of occurrence that shows ho...
Question 31: Which of the following is NOT a source of information about ...
Question 32: According to C. P. Alderfer, people's needs fall into three ...
Question 33: During project executing, a project team member informs the ...
Question 34: ____________ sometimes, called risk symptoms or warning sign...
Question 35: Which of the following statements are true regarding estimat...
Question 36: Evaluation criteria are an input to the Select Sellers proce...
Question 37: You are the project manager for Lucky Stars Candies. You've ...
Question 38: Which of the following are outputs of the Scope Change Contr...
Question 39: Which of the following Project Human Resource Management pro...
Question 40: A request, demand or assertion of a contract partner for con...
Question 41: You are a project manager for Dutch Harbor Consulting. Your ...
Question 42: You are the project manager for a scheduled version release ...
Question 43: When working in an environment that uses learning curves, th...
Question 44: Which of the following depreciation methods provides for acc...
Question 45: _____ of the extra costs of the project can often be attribu...
Question 46: With respect to risk management, which of the following are ...
Question 47: Participative Management:
Question 48: The VP of customer service has expressed concern over a proj...
Question 49: In a fixed price contract, the buyer decides to increase the...
Question 50: You have been hired by a contractor, who wants you to manage...
Question 51: Communication planning is most tightly linked with what proc...
Question 52: Please refer to the chart given below, which shows the time ...
Question 53: A quality control (QC) manager for a manufacturing firm is c...
Question 54: For effective communication, the message should be oriented ...
Question 55: What does a project manager need first and foremost to deter...
Question 56: Which of the following is the MAIN reason for including ince...
Question 57: Which is not included in General Management:...
Question 58: Your company develops large commercial and industry real est...
Question 59: The term that best describes the 'right' to manipulate or ch...
Question 60: If there is a change to the approved cost baseline, the proj...
Question 61: Which of the following is NOT part of a typical change contr...
1 commentQuestion 62: Which of the following are NOT part of the PMI professional ...
Question 63: The project manager has performed schedule network analysis,...
Question 64: You are managing a software project. You are partway through...
Question 65: You have a choice of accepting a fixed price contract for $1...
Question 66: You are in the process of numerically analyzing the effects ...
Question 67: A Responsibility Assigned Matrix (RAM) can be used for all o...
Question 68: Your project is close to completion, when you are informed b...
Question 69: Risk classified as unknown unknowns (i.e., those which canno...
Question 70: During execution of a project, the most common source of con...
Question 71: The tools and techniques of the Perform Quality Assurance pr...
Question 72: Advantages of the functional (hierarchical) form of organiza...
Question 73: You have been assigned to a project that will allow job seek...
Question 74: You are a project manager for the manufacture of children's ...
Question 75: Project report, project record, and project presentation are...
Question 76: Which of the following is considered a direct cost for produ...
Question 77: You are approached by the company where you have been workin...
Question 78: Taking the following table into account, where would correct...
Question 79: The use of quality management tools is used to provide...
Question 80: All of the following precedence relationships can be express...
Question 81: Interfacing with the customer after project go-ahead is the ...
Question 82: You are managing a project in a foreign country, where you r...
Question 83: Project termination responsibilities include all of the foll...
Question 84: You are a part of project software team responsible for deve...
Question 85: You are the project manger at a construction company. Your c...
Question 86: Which of the following would be the MOST appropriate thing t...
Question 87: In a project lifecycle, least number of conflicts occur over...
Question 88: Team development is based on the-...
Question 89: You are in process of exterminating which set of project act...
Question 90: Which of the following are tools and techniques of the Preli...
Question 91: Which of the following process involves measures project and...
Question 92: What is the difference between Verify Scope and quality cont...
Question 93: A WBS can be used for :
Question 94: Risks are accepted when:
Question 95: Which of the following is the total amount of time that a sc...
Question 96: Your company is making a strategy shift: form being focused ...
Question 97: The main reason to plan team building activities (e.g. regul...
Question 98: Your project has a virtual team. Half of your team members a...
Question 99: Which of the following is NOT an example of a deliverable?...
Question 100: At the outset of a project you should define the processes n...
Question 101: Which of the following statements are FALSE regarding weight...
Question 102: At the beginning of Project execution, you notice different ...
Question 103: Respect is...
Question 104: You are in the process of obtaining the necessary human reso...
Question 105: In which of the following is the cost of risk hidden by the ...
Question 106: Recommended corrective actions are an input to which process...
Question 107: Characteristics of a code of accounts are...
Question 108: In a weak matrix organization, functional managers are usual...
Question 109: What does letter of agreement include?...
Question 110: Which of the following networking methods allows us to show ...
Question 111: The Communications Management Plan should contain the follow...
Question 112: The applied level of change control is least dependent upon:...
Question 113: Your company has just received approval to purchase a compan...
Question 114: The financial closeout of a project dictates that:...
Question 115: Which point in time does a Payback period analysis identify?...
Question 116: All of the following statements are true regarding the criti...
Question 117: Sally is a project manager working on a project that will re...
Question 118: You are the project manger assigned to perform seismic retro...
Question 119: Which of the following documents initiates a project and aut...
Question 120: You have been assigned as a project leader and must first re...
Question 121: The one document that should always be used to help identify...
Question 122: Quality control involves monitoring specific project results...
Question 123: Which of the following best describes the Plan-Do-Check-Act ...
Question 124: You are in process of monitoring the various project process...
Question 125: A project manager who allows the team to make the majority o...
Question 126: Random cause or system variation is:...
Question 127: Which of the following are not considered as enterprise envi...
Question 128: You have been recently assigned to provide an accurate proje...
Question 129: Conflict management requires problem-solving. Which of the f...
Question 130: Which of the following statements concerning contract type i...
Question 131: Building a virtual team for a project will limit the usabili...
Question 132: You would like to measure the association between tow variab...
Question 133: You are working with potential sponsors to determine which p...
Question 134: The "zero defect" concept was proposed by:...
Question 135: The process of identifying and defining a product or service...
Question 136: You are the project manager for a construction company. Your...
Question 137: All of the following statements are true regarding the criti...
Question 138: What is the term that is used when referring to the adjustme...
Question 139: Which of the following is not a characteristic of a work pac...
Question 140: You are the project manager for ABC Organization. You have b...
Question 141: A common mistake in communications is to _____ of the receiv...
Question 142: Which of the following techniques do project manager used mo...
Question 143: Procurement audits review which of the following?...
Question 144: Where is the bulk of the project budget spent?...
Question 145: During the six month update on a 1 year, $50,000 project, th...
Question 146: The review for the specification completeness is performed d...
Question 147: You are the project manager for a large children's toys manu...
Question 148: Project Stakeholders are defined as:...
Question 149: You are the project manager at Day-Old donuts a rapidly grow...
Question 150: Which of the following is not an input to the cost control p...
Question 151: Suppose your company has acquired a high end server three ye...
Question 152: The risk management plan is a subset of the project manageme...
Question 153: The level of authority of the project manager:...
Question 154: A project is considered to be complete when...
Question 155: Which of the following is true regarding product scope descr...
Question 156: Your project team has identified several potential risks on ...
Question 157: Which of the following statements are FALSE?...
Question 158: Which is an input to resource planning?...
Question 159: You are performing actions such as reporting and comparing a...
Question 160: Which of the following processes is involved with identifyin...
Question 161: You've been hired as a project manager for a local community...
Question 162: Typical characteristics of a work package include:...
Question 163: Which of the following terms best describe the approach used...
Question 164: Who should always issue the project charter?...
Question 165: Hard logic in the preparation of a network refers to:...
Question 166: The project manager that allows and supports group discussio...
Question 167: You are in process of controlling changes to the project cos...
Question 168: Performance reports are an input to overall change control. ...
Question 169: A chart of accounts is use to:
Question 170: You are in the process project a project schedule for repain...
Question 171: You are in the process of contacting sellers to obtain bids ...
Question 172: The project team form of organization confers both advantage...
Question 173: You are reporting on project elements such as schedule statu...
Question 174: You're managing a construction project to install several hu...
Question 175: You are involved in monitoring specific project results to d...
Question 176: Your project was just completed. Because of some unfortunate...
Question 177: The cost of quality often refers to cost to produce a produc...
Question 178: In which of the following scope management processes are sub...
Question 179: Since risk is associated with most projects, the best course...
Question 180: At which stage, stakeholders have maximum influence on proje...
Question 181: It is argumentative whether project managers actually contro...
Question 182: A technical requirement has which of the following character...
Question 183: Which is controlling changes to the budget....
Question 184: Risk mitigation involves all but which of the following:...
Question 185: You are the project manager responsible for renovating a 70-...
Question 186: A project is considered to be complete when...
Question 187: The Estimate At Completion (EAC) can be used to forecast the...
Question 188: When the project does not obtain products and services from ...
Question 189: You have been asked to submit a proposal for a project that ...
Question 190: You are a project manager for a growing dairy farm. It offer...
Question 191: A collection of documents that will change over time as more...
Question 192: What does a project manager need to perform the Manage proje...
Question 193: In project-driven companies, costs are usually billed againe...
Question 194: You are in the process of establishing a total cost baseline...
Question 195: _____ is a narrative description of the work to be accomplis...
Question 196: A team may not be fully functional until each member...
Question 197: Which of the following are examples of project-based organiz...
Question 198: You are the project manager at a utility company. Due to the...
Question 199: Please refer to the chart given below: (Exhibit) What is the...
Question 200: Which type of contract requires that the buyer keep the tigh...
Question 201: Which of the MOST appropriate things to do during project in...
Question 202: You are one of ten full-time project managers in your organi...
Question 203: A scope change control system
Question 204: One of key activities for achieving customer satisfaction is...
Question 205: The Utility Theory _____ .
Question 206: Inputs to overall change control include:...
Question 207: In the past, most project managers have come from _____ fiel...
Question 208: Which statement describing attributes of the Project Manager...
Question 209: In a matrix organizational form, which factor(s) make it dif...
Question 210: In a flowchart, the diamond form is used to represent:...
Question 211: Human Resource Management is tightly linked to which other k...
Question 212: A scenario is presented in which current variances are seen ...
Question 213: Which of the following techniques accounts for path converge...
Question 214: Which of the following items would be the most important asp...
Question 215: You have been recently hired to be a project manager at a bi...
Question 216: Project Cost Management Plan is created as a part of:...
Question 217: Work packages are used to:
Question 218: At 40% through your project you have a BCWS of $68,000 and a...
Question 219: You are going to take over a new project as the project mana...
Question 220: The work breakdown structure (WBS) is an excellent tool for ...
Question 221: Mike is a project manager for an IT technology implementatio...
Question 222: The ___________ can be used to assess outlays and funding re...
Question 223: Project Risk Management is based on which of the following p...
Question 224: Which of the following best describes project funds that are...
Question 225: Which of the following are the part of WBS dictionary except...
Question 226: Which of the following are types of status reports?...
Question 227: You are managing a construction project. During your risk id...
Question 228: All of the following statements are true regarding configura...
Question 229: Which approach to creating a WBS is often used for projects ...
Question 230: You have been assigned to a project to build the largest...
Question 231: The "rolling wave" or "moving window" concept is used most f...
Question 232: What is the five whys method used for?...
Question 233: Which must be measured regularly to identify variances from ...
Question 234: The concept of making a giant leap forward followed by a per...
Question 235: In a team meeting, two of the managers start a discussion th...
Question 236: Which of the following is NOT necessary when developing a de...
Question 237: The contract management plan is an output of which process?...
Question 238: You are using the interviewing technique of the Quantitative...
Question 239: In which type of organization is team building likely to be ...
Question 240: You are in the process of making project staff assignments. ...
Question 241: Monte Carlo analysis is a form of what type of analysis?...
Question 242: The purpose of a dummy activity in an activity-on-arrow diag...
Question 243: Assume that you have a network where an activity on the crit...
Question 244: What are the tools and techniques for project plan developme...
Question 245: Which of the following is not a type of baseline from which ...
Question 246: All of the following statements are true regarding proposals...
Question 247: Which of the following are outputs of the information distri...
Question 248: Situations calling for a matrix organization include outside...
Question 249: Which of the following can be tracked using the WBS?...
Question 250: You are the project manager for a new construction project i...
Question 251: Which of the following processes is involved with allocating...
Question 252: Which process is not included in Project Cost Management?...
Question 253: As you complete each deliverable for your project, you check...
Question 254: In which of the following organizations is the project manag...
Question 255: The closing process scope includes:...
Question 256: Project management processes can be organized into:...
Question 257: Which is a valid response to negative risks?...
Question 258: You are a project manager for an engineering company. Your c...
Question 259: Cost estimating includes all of the following except:...
Question 260: A project team member tells you that she went to her project...
Question 261: Where does comparing actual to baseline schedules, examining...
Question 262: You are managing a project with 23 team members and six key ...
Question 263: Which is not an element of procurement management?...
Question 264: Determining and delivering the required levels of quality is...
Question 265: The scope management provides:
Question 266: "A Project Manager is at the project kick-off meeting. He co...
Question 267: You are the project manager for an outdoor concert event sch...
Question 268: Assuming a PERT weighted average computation, what is the pr...
Question 269: In which of the following contract types does the buyer have...
Question 270: How many ADDITIONAL lines of communication will be created w...
Question 271: The range of time allowed for an activity to be completed in...
Question 272: Which of the following contract types places the greatest ri...
Question 273: You have been asked to select between three projects. Projec...
Question 274: Which of the following statements are true regarding the cri...
Question 275: Contingency planning should include all but which of the fol...
Question 276: What should you avoid when you are organizing documents as L...
Question 277: In a matrix organization, which of the following is not a re...
Question 278: The reason that cost management is so difficult in project m...
Question 279: You are a project manager for an engineering company. Your c...
Question 280: If two events cannot both occur in a single trial, they are:...
Question 281: Contract Administration is the process of ensuring that the ...
Question 282: Communication management is best described as conducting or ...
Question 283: You are in the process of estimating the type and quantity o...
Question 284: ___________ are not necessarily used to establish the Cost b...
Question 285: Which of the following statements are true regrinding issue ...
Question 286: The project plan is used to do all of the following except:...
Question 287: What is important for Quality auditors?...
Question 288: Going from Level 2 to Level 4 in the work breakdown structur...
Question 289: You are in the process of estimating the number of work peri...
Question 290: Which of the following best describes what is a workaround?...
Question 291: Value engineering/Analysis is the systematic use of techniqu...
Question 292: During the Develop Schedule process the Project Manager may ...
Question 293: In a project, you are presented with following four options....
Question 294: Management reserves are used to handle which type of risk?...
Question 295: You are managing a project where you work with 7 other team ...
Question 296: You are in the process of developing an approximation of the...
Question 297: Life seems to be going very well for your close friend, a fe...
Question 298: A WBS provides a framework from which all of the following c...
Question 299: The Cost Performance Index is computed as:...
Question 300: You are the project manager for the software company that de...
Question 301: In an activity-on-node diagram, the nodes represent:...
Question 302: You are project manager of project and senior management tol...
Question 303: Which of the following are NOT considered formal types of pr...
Question 304: Which of the following is a "hygiene factor" under Herzberg'...
Question 305: In which of the following types of organizational structures...
Question 306: You are in the process of identifying and documenting the lo...
Question 307: Risk can be divided into two basic types; business risk and ...
Question 308: Which of the following would most likely increase the accura...
Question 309: The Communication Management Plan provides all of the follow...
Question 310: You are currently on a 3-week vocation in Australia. You've ...
Question 311: You are a project manager for Zippy Tees. Your selection com...
Question 312: You are project manager responsible for constructing a new s...
Question 313: You are negotiating with a seller. Time is of the essence bu...
Question 314: You are the project manager for Lucky Stars nightclubs. They...
Question 315: In the project environment, the individual ultimately respon...
Question 316: As a project manager you can assign any one of two team memb...
Question 317: According to the PMI, which of the following best describes ...
Question 318: As you determine the requirements, constraints and assumptio...
Question 319: You are currently analyzing the schedule for a project. You'...
Question 320: Your project is progressing as planned. The project team has...
Question 321: A scientist is informing techs. about a new product which is...
Question 322: You have summarized the project and note that 28,000 hours h...
Question 323: During execution of a project, you observe that the performa...
Question 324: Which one of the following is not an acquisition method?...
Question 325: All of the following aid in achieving consensus EXCEPT:...
Question 326: Which of the following types of limits is often not directly...
Question 327: Proper implementation of project management will guarantee t...
Question 328: The total project scope is:
Question 329: A project manager is assigned to a project which phase of th...
Question 330: All of the statements regarding decision tree analysis is tr...
Question 331: You are working on a project and discover that one of the bu...
Question 332: The profitability and technical data studies are provided in...
Question 333: You're managing a construction project to install several hu...
Question 334: Overlapping activities on a project, such as design and cons...
Question 335: Certain resources have been added to tasks on the critical p...
Question 336: As the Project Manager of an IT project, you are in the proc...
Question 337: Which task is ahead of schedule and under cost?...
Question 338: You are the project manger assigned to build the house. You ...
Question 339: Which of the following is not true about Project Plan Develo...
Question 340: Configuration management does all of the following except:...
Question 341: Which of the following is LEAST likely to improve the accura...
Question 342: You are in the process of identifying and documenting projec...
Question 343: During contract closure, a procurement audit includes all of...
Question 344: Which of the following statements BEST describes an Estimate...
Question 345: Bar charts are most appropriate for:...
Question 346: The project schedule is not used to determine...
Question 347: Documented work authorization provide:...
Question 348: You are managing a project with an EV of $15,000, PV of $12,...
Question 349: Your project will require use of a high pressure punch press...
Question 350: Which of the following is true regarding IRR?...
Question 351: What is the meaning of the acronym CSOW?...
Question 352: War room creation during project deployment phase is an exam...
Question 353: Which of the following should be done by the project manager...
Question 354: A team member approaches you with a change that could cut yo...
Question 355: Those areas that a project manager considers to be true, rea...
Question 356: Trend Analysis is best described as:...
Question 357: A contract originated bilaterally may be developed by _____ ...
Question 358: Which of the following statements are true regarding the pro...
Question 359: Define and sequence following different stages of the Team D...
Question 360: In which of the following contract types is the seller's pro...
Question 361: You are currently in the process of prioritizing risks by th...
Question 362: You are in the process of developing an approximation of the...
Question 363: Which is not an output of the Activity definition process?...
Question 364: You are in process of numerically analyzing the effects of i...
Question 365: Upon completion of 75% of the project, the original schedule...
Question 366: Which of the following document include a code of account id...
Question 367: Inputs to communication planning include...
Question 368: In negotiating with functional department managers, project ...
Question 369: On November 1, $1000 worth of work on task A was supposed to...
Question 370: Your project sponsor has requested a cost estimate for the p...
Question 371: Which of the following is not the feature of a project?...
Question 372: A technique that can be used to measure the total income of ...
Question 373: You are the project manager for the software company that de...
Question 374: You are in the build phase of the project. But it has run in...
Question 375: You are a project manager at construction company, assigned ...
Question 376: _____ is a formal invitation containing a scope of work whic...
Question 377: Under what circumstances is it better for a contractor to su...
Question 378: Three types of written media used in organizations are _____...
Question 379: Which of the following statements are FALSE regarding qualit...
Question 380: Your project team is already created the WBS, developed esti...
Question 381: You are the project manager at a software company developing...
Question 382: You are managing a software engineering project, when two te...
Question 383: The Project Integration Management Knowledge Area consists o...
Question 384: Your project will most likely be completed in 10 weeks. Wors...
Question 385: You are in the process of making information available to pr...
Question 386: Which of the following describes an input to the direct and ...
Question 387: Likely schedule durations for Estimate Activity Durations ar...
Question 388: Things that distort, distract, or muddle the communication p...
Question 389: What are the cost types in modern quality management?...
Question 390: You have just completed the progress planning process group ...
Question 391: Which of the following MUST NOT performed in project initiat...
Question 392: The Project Management Knowledge Areas ___________________ ....
Question 393: All of the following statements are true regarding conflict ...
Question 394: A structured tool, usually industry or activity specific, us...
Question 395: Post-mortem analysis of a project shows a CPI of 0.8 and an ...
Question 396: Which of the following is NOT true of obtaining project plan...
Question 397: Which of the following statements is false?...
Question 398: Back charges refers to:
Question 399: Project Procurement Management includes:...
Question 400: You've constructed the WBS for your recent project. You've r...
Question 401: You have been assigned to a project in which the objectives ...
Question 402: R &amp; D project managers in high-tech companies most often...
Question 403: You are a project manager for a company that sells online mu...
Question 404: You work for a large manufacturing plant. You're working on ...
Question 405: You are the project manger for Xylophone Phonics. It produce...
Question 406: All of the statements are FALSE regarding Resource Calendars...
Question 407: You are a project manager at an utility company. Due to the ...
Question 408: The sponsor is worried about the seller deriving extra profi...
Question 409: You are the project manager for the international contract m...
Question 410: All of the following statements are true regarding scatter d...
Question 411: Which of the following is not an input into Project Plan Dev...
Question 412: Life cycle costing is the total cost to the customer for the...
Question 413: Which of the following tools and techniques are commonly use...
Question 414: One of your friend is a project manager at a natural gas ene...
Question 415: Measuring the probability and consequences of risks is part ...
Question 416: All of the statements regarding control accounts and plannin...
Question 417: During Risk identification sessions, you and your team ident...
Question 418: _____ is a method of procurement where a contract results fr...
Question 419: Random variance in a process can be directly reduced by ____...
Question 420: Which of the following is or are a part of Solicitation proc...
Question 421: Which of the following statements are true regarding Quality...
Question 422: A risk management plan is a subset of the project management...
Question 423: Which of the following is not an Output of the Scope Initiat...
Question 424: Over the life cycle of the project, the quality of informati...
Question 425: You are in the process of tracking team member performance, ...
Question 426: You are considering outsourcing some of the work on your pro...
Question 427: Which statement describes best the term Sink node?...
Question 428: Which of the following is considered a method of accelerated...
Question 429: Your new product development project has resulted in a highl...
Question 430: Your work as a project manager at the computer chip manufact...
Question 431: Which of the following statements are true regarding the Par...
Question 432: Maintenance should:
Question 433: Process analysis is a function of ____________....
Question 434: Which of the following can be used to determine what work is...
Question 435: At the end of an internal project, you find several key stak...
Question 436: There are 17 people on a project. How many lines of communic...
Question 437: What is signified when a forward and backward pass indicates...
Question 438: Which of the following processes assesses the likelihood of ...
Question 439: Qualitative risk analysis requires accurate data as its inpu...
Question 440: Risks include the following types:...
Question 441: A summary WBS is usually developed in the...
Question 442: Which of the following processes involves allocating cost es...
Question 443: You are continually faced with tasks coming in late because ...
Question 444: Which of the following terms is used to refer to the adjustm...
Question 445: You are involved in monitoring specific project results to d...
Question 446: Which of the following statement about project phases and pr...
Question 447: Which of the following contract types has the highest risk t...
Question 448: All the following are tools for cost estimating except:...
Question 449: You are the project manger at XYZ Software Corp, a U.S softw...
Question 450: You are in the process of controlling changes to the project...
Question 451: Knowledge of best practices in a particular area is most lik...
Question 452: Which of the following processes has risk register as the pr...
Question 453: What is the benefit of a Weighting system over a Screening s...
Question 454: Which of the following conflict resolution techniques descri...
Question 455: You are in process of creating the detailed project scope st...
Question 456: Customer satisfaction should be measured at the end of the p...
Question 457: Which of the following statements are true regarding project...
Question 458: Which of the following tools/ techniques of the quality plan...
Question 459: When a majority of team members must agree before a decision...
Question 460: Which of the following is the MOST likely candidate for a th...
Question 461: Which of the following statements are TRUE regarding precisi...
Question 462: A project involves arranging for the closing of the company ...
Question 463: Projects are initiated in response of:...
Question 464: You are a project manager with several years of experience i...
Question 465: Dennis works 4 an international manufacturer of costumer ele...
Question 466: Which of the following could be an appropriate WBS code for ...
Question 467: A difference between a Statement of work and a Scope stateme...
Question 468: Which of the following tools are used to implementation of a...
Question 469: Overall change control is concerned with all of the followin...
Question 470: Life Cycle Costing:
Question 471: You are managing the development of a highly controversial p...
Question 472: To calculate the late start and late finish dates for a set ...
Question 473: Which of the following statements are true regarding quality...
Question 474: Measuring the probability and consequences of risks is part ...
Question 475: Which of the following options would you take to determine w...
Question 476: The risk register describes all the identified risks. Which ...
Question 477: Which of the following processes is NOT part of Project Huma...
Question 478: All of the following statements are true regarding risk even...
Question 479: Which of the following establishes the procedures to transfe...
Question 480: Which of the following is NOT a source selection tool or tec...
Question 481: During a project review meeting, you discover that your $250...
Question 482: You are in the process of monitoring the various project pro...
Question 483: Which of the following are indicative of duration estimates?...
Question 484: You work at RFID-PM Inc, a publicly traded company that deve...
Question 485: Keeping up with the growth was becoming a problem for a priv...
Question 486: An input to the scope planning process is:...
Question 487: You are working on a project that requires resources with ex...
Question 488: Which of the following processes allow an unsuccessful bidde...
Question 489: Which of the following is an output of Define Scope?...
Question 490: All of the following statements regarding Control Accounts a...
Question 491: All of the statements regarding control accounts and plannin...
Question 492: "The seller delivers a fixed price plus incentive fee projec...
Question 493: A tight matrix is:
Question 494: If a risk has a 20 percent chance of happening in a given mo...
Question 495: One of your friends is a manager at telecommunications compa...
Question 496: Which of the following actions is an example of risk respons...
Question 497: Three-Point Estimates includes _________....
Question 498: Your company has an agreement with the labor union that stat...
Question 499: Job descriptions are examples of ______communications....
Question 500: A clear definition of the user's needs serves as the direct ...
Question 501: Which of the following is the BEST candidate for a three-poi...
Question 502: Earned value should be used to estimate final project costs ...
Question 503: Quality management:
Question 504: Which of the following statements are true regarding Delphi ...
Question 505: All of the following are tools/ techniques of Perform Qualit...
Question 506: A process that is not part of Project Risk Management is:...
Question 507: At the beginning of the project, you hold a meeting with all...
Question 508: With respect to the cost of quality which of the following i...
Question 509: The sending or conveying of information from one place to an...
Question 510: You have been assigned to a project in which the objectives ...
Question 511: Inspection processes are considered _____....
Question 512: You are a project manager of ABC organization. You have been...
Question 513: Understanding cultural key similarities and differences is e...
Question 514: Communication is the key to the success of a project. As the...
Question 515: What does the term Best practice often refer to?...
Question 516: You've been hired as a manager for the adjustments departmen...
Question 517: Which statement describes best the purpose of brainstorming ...
Question 518: In organizing a project, a project manager must deal with co...
Question 519: Which of the following statements regarding WBS are FALSE?...
Question 520: You are the project manager fro the large children's toy man...
Question 521: All of the following statements regarding management reserve...
Question 522: During project executing, a previously unidentified risk has...
Question 523: Which of the following types of specifications gives measura...
Question 524: Which may be employed to shorten a schedule without changing...
Question 525: The fund available to a organization to invert in project is...
Question 526: You are currently finishing a project under contract to deve...
Question 527: Precedence diagramming method (PDM) uses which of the follow...
Question 528: Which of the following is not a tool or technique for overal...
Question 529: There are two projects from which you have to choose one. Pr...
Question 530: A work package is:
Question 531: The risk register is an input to all of the following proces...
Question 532: A project has the following Earned value data assessed: AC: ...
Question 533: Problem solving addresses potential problems on the project....
Question 534: You are in the process of controlling changes to the project...
Question 535: In which of the following types of contracts is it most impo...
Question 536: You are building the budget for your project. You don't have...
Question 537: Which of the following depicts a hierarchical tabulation of ...
Question 538: The practice of ceasing mass inspections and ending awards b...
Question 539: Your company provides answering services for several major c...
Question 540: Early activities are detailed and future activities are stil...
Question 541: Role of the sponsor is BEST described as:...
Question 542: Lessons learned are most often based upon project historical...
Question 543: Which of the following statement are correct regarding manag...
Question 544: You've been hired as a project manager for a local community...
Question 545: Which of the following is an output from the Contract Closeo...
Question 546: Which knowledge area does not provide input into cost budget...
Question 547: Which of the following statements are false regarding the ad...
Question 548: The overall intentions and direction of an organization with...
Question 549: Which conflict resolution technique do project managers use ...
Question 550: An electronic component had a reliability of 0.90. Two of th...
Question 551: Which of the following techniques uses a weighted average du...
Question 552: The LEAST effective form of communication for complex situat...
Question 553: Which of the following describes the optimal way of communic...
Question 554: You are a project manager for a documentary film company. In...
Question 555: In attempting to complete the project faster, the project ma...
Question 556: Configuration Management, Performance Measurement and Projec...
Question 557: As a project manager, you're responsible for maintaining and...
Question 558: Which of the following is the MOST valuable result of creati...
Question 559: You are the project manager for an information technology di...
Question 560: The major disadvantage of a bar chart is:...
Question 561: Legitimate power is:
Question 562: Which of the following statements are true regarding various...
Question 563: You are a project manager at day-old donuts, a rapidly growi...
Question 564: Your project run for a customer is coming to an end. The cus...
Question 565: Which statement is false? Progressive elaboration of project...
Question 566: You are a project manager at a biotech company, where you ar...
Question 567: The salvage value of an asset is:...
Question 568: The outcome that must be produced to complete a part of a pr...
Question 569: You are a project manager for Move It Now trucking company. ...
Question 570: You have been assigned to a project to build the largest...
Question 571: You are working on a construction project. You, your team, a...
Question 572: You are project manager at a large multinational company dev...
Question 573: The core planning processes include:...
Question 574: You are planning a project that uses the same team as a proj...
Question 575: In a contract, the point of total assumption refers to the p...
Question 576: The outputs from risk identification are usually contained i...
Question 577: All of the following statements are true regarding the cost ...
Question 578: The project charter is typically approved by the project spo...
Question 579: Keeping up with the growth was becoming a problem for a priv...
Question 580: As a Project Manager for a construction company, you are res...
Question 581: Which of the following describes the difference between the ...
Question 582: If the number of critical paths in the project increases, bu...
Question 583: Which is a technique often used for Quality assurance?...
Question 584: The procurement management plan describes how the procuremen...
Question 585: You are the project manager for a cable service provider. Yo...
Question 586: All of the following statements are true regarding the Human...
Question 587: The scope baseline/project charter is prepared by the:...
Question 588: When components in a system are arranged in parallel, system...
Question 589: In your software project, you have a programmer who constant...
Question 590: Scope management is:
Question 591: To calculate the expected value of an outcome:...
Question 592: You are the project manager for an information technology di...
Question 593: Your company has just presented its new five-year strategic ...
Question 594: Which of the following is not a consideration in selecting p...
Question 595: In an ideal situation resource leveling should be limited to...
Question 596: Adding 5 people to a 4 person team increases the communicati...
Question 597: Which of the following is NOT one of the most common sources...
Question 598: Two of your project team members approach you with a conflic...
Question 599: Project Cost Management includes all of the following except...
Question 600: Which of the following statements are FALSE regarding rollin...
Question 601: Risk monitoring and control process involves all of the foll...
Question 602: Which of the following statements regarding configuration ma...
Question 603: We assign human and non-human resources in the _____ phase o...
Question 604: What is true for Statistical sampling?...
Question 605: Which is a phased budget used to measure and monitor cost pe...
Question 606: With respect to earned value analysis, which of the followin...
Question 607: What are the BEST inputs to the Initiation process?...
Question 608: You need to convey some very complex, detailed information t...
Question 609: Instead of celebrating the end of the project, the stakehold...
Question 610: You are in the vendor management department of your company ...
Question 611: You recently took over the assignment for a project. The pro...
Question 612: You are a new project manager who has never managed a projec...
Question 613: Which of the following statements are false regarding sensit...
Question 614: Inputs to scope verification include the following...
Question 615: Which of the following are true regarding project risk manag...
Question 616: A work breakdown structure which has become part of a contra...
Question 617: Which of the following statements regarding networking is fa...
Question 618: You need to determine when to release resources from your pr...
Question 619: Which of the following is a method for quantifying qualitati...
Question 620: Constrained optimization models and benefit measurement meth...
Question 621: You are a project manager for a software manufacturing firm....
Question 622: Which of the following can be used to determine what work is...
Question 623: Your company manufactures small kitchen appliances. It is in...
Question 624: History has shown that project managers can be trained in a ...
Question 625: You are the project manager responsible for renovating a 70-...
Question 626: You gathered a lot of knowledge on project management in you...
Question 627: Which of the following best describes the tool/ technique us...
Question 628: The logical relationship that communicates a delay between t...
Question 629: How would you as the project manager address this project te...
Question 630: Cost Reimbursable contracts are equivalent to:...
Question 631: By which process may an unsuccessful supplier seek remedy fo...
Question 632: Which of the following models of conflict resolution allows ...
Question 633: Which of the following are tool/ technique of Perform Qualit...
Question 634: In which type of organization(s) is the project manager's ro...
Question 635: A team member from research and development tells you that h...
Question 636: Which is not a tool or technique for project plan execution:...
Question 637: Listening involves more than hearing sounds. The good listen...
Question 638: The process of evaluating overall project performance on a r...
Question 639: Which of the following are constraints that you might find d...
Question 640: Which of the following is NOT a valid reason to authorize a ...
Question 641: The project charter should be issued by...
Question 642: All of the following statements are true regarding risks exc...
Question 643: The "control points" in the work breakdown structure used fo...
Question 644: The specifications for a particular part are "10 +/-0.015". ...
Question 645: The "buy or make" decision is usually made during the:...
Question 646: As the most recent in a succession of project managers assig...
Question 647: Your company, Kick That Ball Sports, has appointed you proje...
Question 648: The primary communication skills you will use in working wit...
Question 649: Which is the BEST description of project scope?...
Question 650: Project Risk Management includes all of the following proces...
Question 651: Your project team has created a new way to process claim for...
Question 652: Which of the following techniques incorporates a form of ris...
Question 653: The first document produced on a project SHOULD be the:...
Question 654: Exhibit: (Exhibit) Please refer to the exhibit. Use the foll...
Question 655: Probability-impact matrix, risk data quality assessment, ris...
Question 656: Tools &amp; techniques for risk identification include...
Question 657: Each of the following describes an element of the scope defi...
Question 658: All direct or indirect training costs should generally be th...
Question 659: Which of the following is not a method of government procure...
Question 660: Communication always makes use of....
Question 661: After project is completed, a complete set of indexed projec...
Question 662: You are the project manager for BB Tops, a nationwide toy st...
Question 663: What is one of the most important skills a project manager c...
Question 664: You are the project manager for Lucky Stars nightclubs. They...
Question 665: A project manager wants to transmit a complex message to sev...
Question 666: Resource leveling _____.
Question 667: CIP is:
Question 668: The following types of costs are relevant to making a financ...
Question 669: You are the project manager for ABC Organization. You are co...
Question 670: You are using the three-point estimating technique to estima...
Question 671: All of the following statements regarding quality metrics ar...
Question 672: You are a project manager for Waterways Houseboats, Inc. You...
Question 673: Which of the following is TRUE about IRR?...
Question 674: A product life cycle is a series of phases whose name and nu...
Question 675: Which task is on schedule with a cost variance of $0?...
Question 676: Which of the following statements are FALSE regarding CPM me...
Question 677: You are the project manager for a construction company. You ...
Question 678: Receivers in the communication model filter their informatio...
Question 679: If your expected value is 110 and the standard deviation is ...
Question 680: Which of the following are inputs to the close project proce...
Question 681: Life cycle costing:
Question 682: Which of the following is not a project?...
Question 683: What are the performance measurements for the Schedule Contr...
Question 684: Earned value analysis is performance reporting tools used in...
Question 685: Which task is most over budget?...
Question 686: What is the total slack for the following project? Exhibit: ...
Question 687: Which of the following is not a tool or technique used durin...
Question 688: You are the project manger at a biotech company, where you a...
Question 689: Please refer to the diagram given below: (all units are in d...
Question 690: Which of the following techniques may NOT be used to a proje...
Question 691: Which is NOT an input to the Create WBS process?...
Question 692: Your project has experienced some changes to the agreed-upon...
Question 693: The following reports are normally developed during the proj...
Question 694: Scoring methods,Comparative methods and economic and cash fl...
Question 695: Which of the following can be used to display the assigned r...
Question 696: A document or tool which describes when and how human resour...
Question 697: A line manager who is asked to wear two hats and function as...
Question 698: There have been several rounds of layoffs at your company. N...
Question 699: For doing Quality Planning, you are going to use Design of E...
Question 700: What is the main output of the Scope Definition process?...
Question 701: Which of the following statements are FALSE regarding Bidder...
Question 702: Which of the following statements is true regarding schedule...
Question 703: A non-critical path activity is completed in half the time. ...
Question 704: The Conflict resolution method that should be used when ther...
Question 705: Which of the following is not true about project planning me...
Question 706: Which of the following are true regarding statistical perfor...
Question 707: Which of the following is CORRECT?...
Question 708: Which of the following items is required when developing a d...
Question 709: You have determined that a design error will interface with ...
Question 710: Which of the following represents the MOST important criteri...
Question 711: You are working on a construction project. You, your team, a...
Question 712: Tom is the project manager on a construction project. Midway...
Question 713: You are the project manager for a software company that deve...
Question 714: Which is not part of the Earned Value calculations?...
Question 715: You are the project manager for a cable service provider. Yo...
Question 716: All of the following knowledge area process do NOT have proc...
Question 717: One of your friends is a project manager at a computer secur...
Question 718: Two of the types of discretionary dependencies that typicall...
Question 719: An informal communication network on a project and within an...
Question 720: You have been recently been assigned to provide an accurate ...
Question 721: Which of the following best describes fast-tracking?...
Question 722: Project information can be shared by tam members and stakeho...
Question 723: Which of the following does not form part of Project Procure...
Question 724: Which of the following is not done in Initiation phase?...
Question 725: With respect to management planning, timing defines how ofte...
Question 726: The schedule risk is the _____ ....
Question 727: You are the project manager for a new website for the local ...
Question 728: Control chart theory is based on the differentiation of the ...
Question 729: Quality control charts show a characteristic of the product ...
Question 730: When the project team directs staff assignments, what is not...
Question 731: Project mangers often refer to a project's triple constraint...
Question 732: Where would you document a change that was approved when the...
Question 733: Forcing, as a means to manage conflict:...
Question 734: During the schedule development process the Project Manager ...
Question 735: Which of the following best describes the difference between...
Question 736: Which of the following statements are FALSE regarding recogn...
Question 737: In your project, you are trying to identify lessons learned ...
Question 738: Which of the following statements are true regarding proposa...
Question 739: Which of the following statements are true?...
Question 740: When are the most expensive defects most likely to be introd...
Question 741: Which of the following calculates the difference between the...
Question 742: Who has MOST power in PROJECTIZED organization?...
Question 743: Which of the following statements are true regarding risk re...
Question 744: Which of the statements regarding the WBS is FALSE?...
Question 745: You are currently in the marker for the new car. You are deb...
Question 746: Which of the following is not a tool or technique of the Per...
Question 747: The Work Breakdown Structure (WBS) is the basis for communic...
Question 748: A project Manager has to manage conflict in an organization....
Question 749: All the following statements relating to transferring of ris...
Question 750: Which of the following represents the reason why post-contra...
Question 751: Which of the following statements concerning a scope stateme...
Question 752: When a project incorporates an Organizational Breakdown Stru...
Question 753: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 754: Creating Work Breakdown Structures (WBS) is very helpful in ...
Question 755: Micheal is a self employed PMP certified project manager who...
Question 756: Which of the following is not a scope management process?...
Question 757: Consider the project integration management knowledge area. ...
Question 758: Which is not part of Performance Measurements?...
Question 759: You are the project manager for a software company that deve...
Question 760: Which of the following documents is not used as input for pr...
Question 761: What is one of the advantages of a functional organization?...
Question 762: Your company policy allows accepting gifts from customer wit...
Question 763: If you are project manager, After a change request has been ...
Question 764: Obtaining team commitment depends on:...
Question 765: Name the ethical code you'll be required to adhere to as a P...
Question 766: A team member notifies the project manager that the activiti...
Question 767: You are project manager for a project. This project was orig...
Question 768: The project charter is a document designed to tell _____ exa...
Question 769: The type of contract (payment mechanism) chosen for a projec...
Question 770: Cost of quality includes:
Question 771: Deflection involves the transfer of risk by:...
Question 772: What is the document that gives the PM the authority to appl...
Question 773: _____ best describes the goal of a project in its relationsh...
Question 774: You are developing the project scope statement for a new pro...
Question 775: Which of the following best describes the project integratio...
Question 776: Part of being a project manager involves dealing with confli...
Question 777: You have just completed the project planning process group a...
Question 778: Which of the following statements regarding configuration ma...
Question 779: According to Bruce Tuckmann, which are the stages of team de...
Question 780: Your lead engineer estimates that a work package will most l...
Question 781: A contingency plan is:
Question 782: A project manager is faced with two team members who have co...
Question 783: Which of the following is not a cost of non-conformance?...
Question 784: In a sender-receiver model, all the following are true excep...
Question 785: You are managing a software engineering project. Your team i...
Question 786: Which of the following are examples of indirect costs?...
Question 787: Which of the following is NOT a characteristic of message fi...
Question 788: The basic elements of communication include:...
Question 789: Which of the following is not true about the Project Charter...
Question 790: What is the purpose of a Preliminary scope statement?...
Question 791: You are running a project to develop the production process ...
Question 792: You are the project manager at a construction company. Your ...
Question 793: The Cost Performance Index (CPI) measures:...
Question 794: Which of the following statement regarding WBS are true?...
Question 795: The primary communication skills you will use in working wit...
Question 796: Continually measuring and monitoring the actual cost versus ...
Question 797: Assigning resources in an attempt to find the shortest proje...
Question 798: Which types of Organizational Charts can be best used to tra...
Question 799: Which is not an example of formal communication?...
Question 800: You are a project manager responsible for constructing a new...
Question 801: Which of the following best describes resource leveling?...
Question 802: Which of the following statements regarding Resource Breakdo...
Question 803: Integrate change control includes the following activities E...
Question 804: The Cost Performance Index (CPI) measures...
Question 805: As a Project Manager on replacing 2 miles of sewer pipe part...
Question 806: Inputs to scope definition include...
Question 807: A RAM is:
Question 808: The work that must be done in order to deliver a product wit...
Question 809: You are the project manger at a software company developing ...
Question 810: What are the Scope Definition process tools and techniques?...
Question 811: You are a project manager working in a foreign country. You ...
Question 812: Which of the following is not a technology factor that may a...
Question 813: Which of the following objectives is LEAST likely accomplish...
Question 814: A graphic display of resource usage hours is:...
Question 815: Which of the following best describes a form of progressive ...
Question 816: You have been recently assigned to provide an accurate proje...
Question 817: A cost-plus-incentive-fee (CPIF) contract has an estimated c...
Question 818: A project manager believes that the best way to manage is to...
Question 819: The project scope/charter baseline includes:...
Question 820: You are using three point estimating technique to estimate t...
Question 821: As project manager, you wish to impose a standard method by ...
Question 822: Crashing describes a technique to speed up a project by......
Question 823: Ishikawa diagrams are used in which of the following process...
Question 824: Information typically required to determine project communic...
Question 825: You are the Project Manager for a company doing research on ...
Question 826: How much time does the typical project manager spend communi...
Question 827: The project manager for a construction project discovers tha...
Question 828: CORRECT TEXT During Planning processes, you used Monte-Carlo...
Question 829: Using the chart, what is the lowest cost of crashing this pr...
Question 830: Michael works as a project manager at the construction compa...
Question 831: The SPI, which is used to estimate project completion date, ...
Question 832: Which of the following processes serve as inputs to each oth...
Question 833: You are a project manager responsible for constructing a new...
Question 834: Cost estimating:
Question 835: Which of the following quality improvement approaches is LEA...
Question 836: In planning your resources for a new building project you ar...
Question 837: During execution of your project plan, you discover that a t...
Question 838: Which of the following statements are FALSE?...
Question 839: Budgetary estimates are the output of the _____ phase(s) of ...
Question 840: The Monitor and Control Project Work process is performed to...
Question 841: The overall duration of the project schedule is not influenc...
Question 842: Which of the following is true regarding the project charter...
Question 843: You are the project manger at an advertising firm that speci...
Question 844: All of the following are considered schedule network analysi...
Question 845: The scope of a project can be expected to change if:...
Question 846: All of the following are categories of a milestone in a sche...
Question 847: All the following are tools and techniques for organization ...
Question 848: The three most common types of project cost estimates are:...
Question 849: A contingency plan is executed when:...
Question 850: Quality Improvement Programs are normally associated with wh...
Question 851: Inspections are also called each of the following except for...
Question 852: You are a project manager working on contract. You've perfor...
Question 853: The behavioral responsibilities of a project manager may als...
Question 854: Proposals are seller prepared documents that describe the se...
Question 855: General management encompasses:...
Question 856: The items at the lowest level of the WBS are called...
Question 857: All of the following are true regarding Communications Plann...
Question 858: All of the following statements are true regarding the Activ...
Question 859: Smoothing out resource requirements from period to period is...
Question 860: You are the project manager for the development of a new typ...
Question 861: When should the project manager be assigned?...
Question 862: You are the project manager at a financial services company....
Question 863: The degree to which written policies, procedures, rules, and...
Question 864: Team members want to work for a project manager that can pro...
Question 865: Management calls a meeting to explain to all employees the n...
Question 866: According to the PMI which of the following is considered as...
Question 867: Which of the following LEAST likely describes a weighting sy...
Question 868: Please refer to the exhibit. Which of the following describe...
Question 869: Which of the following results are Win/Win conflict resoluti...
Question 870: Which of the following is an output of Verify Scope?...
Question 871: Which of the following statements about fast-tracking is TRU...
Question 872: Which of the following are NOT outputs of the Information Di...
Question 873: Most project (and non-project) managers prefer _____ communi...
Question 874: Which of the following process is not included in project co...
Question 875: A computer tape which contains historical project informatio...
Question 876: Trend Analysis is performed using ______....
Question 877: You are in the middle of a major new facility construction p...
Question 878: Lessons learned are most often based upon project historical...
Question 879: Cost and schedule data are usually integrated because:...
Question 880: All of the following may hinder a person's ability to transm...
Question 881: In your project, you are creating a diagram that describes t...
Question 882: You are the project manager of a company that is building AT...
Question 883: At what stage in the project life cycle would costs be the l...
Question 884: You are the project manager for the international contract m...
Question 885: You are working on a project that was proceeding well until ...
Question 886: Risk mitigation includes all but which of the following:...
Question 887: The main difference between the two types (ADM and PDM) of t...
Question 888: In project management, Work authorization is normally not......
Question 889: Contract documentation is an input to the Contract Closure P...
Question 890: Risk exposure refers to _____ ....
Question 891: The Preliminary Scope Statement which is and output of the D...
Question 892: You are a project manager for Picture Shades, Inc. It manufa...
Question 893: You have been informed by the project sponsor that there has...
Question 894: 3 major processes in Project HRM...
Question 895: All the following are advantages of GERT (Graphical Evaluati...
Question 896: Steps in effective goal setting are:...
Question 897: Which of the following is NOT included in the project scope ...
Question 898: While doing risk response planning, you realize that there i...
Question 899: Which of the following statements are FALSE?...
Question 900: How should change management be planned for?...
Question 901: There are four general classes of products that the purchasi...
Question 902: The engineering department has just reported that a small pl...
Question 903: You are a project manager at day-old donuts, a rapidly growi...
Question 904: The project manager notices that project activities being co...
Question 905: High level project constraints are determined during the ___...
Question 906: Which of the following project would be BEST project to sele...
Question 907: A Work Breakdown Structure numbering system...
Question 908: You are the project manager at an auto manufacturer. Due to ...
Question 909: You are in the process of identifying and documenting projec...
Question 910: Which of the following is neither a tool nor a technique for...
Question 911: Which of the following is the correct order of actions that ...
Question 912: Which of the following best describes the calculations of la...
Question 913: Which of the following statements about fast-tracking is TRU...
Question 914: Rekha is a project manager on a large construction project. ...
Question 915: You are involved in monitoring specific project results to d...
Question 916: Which of the following would most likely not be an essential...
Question 917: Which of the following statements are true regarding the pro...
Question 918: All of the following are another terms of bidder conferences...
Question 919: What does a benefit-cost ratio of 3.22 indicate?...
Question 920: You are a project manager at a large accounting firm in Unit...
Question 921: Processes of Configuration management do in general not incl...
Question 922: Inputs to procurement planning include...
Question 923: All of the following are inputs to the Direct and /manage Ex...
Question 924: You are working on a project and discover that one of the bu...
Question 925: You are the project manager for the company that sells onlin...
Question 926: Cost control is concerned with:...
Question 927: The customer has decided that he wants blue walls instead of...
Question 928: A scope change is:
Question 929: Which of the following statements are true regarding the pro...
Question 930: Which of the following terms refers to the situation where t...
Question 931: Which of the following scheduling techniques focuses on mana...
Question 932: Obtaining formal project plan approval and sign-off is impor...
Question 933: Which of the following is a KEY output of the Verify Scope p...
Question 934: You have been hired as a contract project manger for Grapevi...
Question 935: Input into the Communications Management Plan includes the f...
Question 936: A planning phase for an engineering component generated 100 ...
Question 937: Which of the following are characteristics of a purchase ord...
Question 938: Contract documentation is an input to both the Close Project...
Question 939: Which of the following statements are FALSE regarding the re...
Question 940: Which knowledge area involves organizational theory as a too...
Question 941: Joe is a project manager on an industrial design project. He...
Question 942: Which of the following is NOT part of stakeholder's manageme...
Question 943: Pure Risk differs from Business Risks because Pure Risk's __...
Question 944: Which of the following is a formal invitation that requests ...
Question 945: The most common form of organizational communication is...
Question 946: All the following are examples of Constrained Optimization e...
Question 947: To determine what causes the majority of quality problems in...
Question 948: With triangular distribution, the low, likely and high value...
Question 949: When preparing the probability distribution of cost outcomes...
Question 950: Coordinating changes across knowledge areas is a function of...
Question 951: A manager works very closely with his subordinates to create...
Question 952: Which of the following is true?...
Question 953: Which of the following best describes the Achievement Theory...
Question 954: Which of the following statements are FALSE regarding expect...
Question 955: There are some costs like legal costs or insurance costs are...
Question 956: Which of the following can result in misinterpretation of th...
Question 957: Which of the following statements are true regarding GERT?...
Question 958: The unique identifiers assigned to each item of a WBS are of...
Question 959: Which of the following types of contracts allows the owner t...
Question 960: You are a project manager for Dakota Software Consulting Ser...
Question 961: Which of he following best describes the risks that still re...
Question 962: Change requests are made against the ____________?...
Question 963: The process of identifying which products or services can be...
Question 964: Which of the following statement related to Standards and Re...
Question 965: Fragment network area term used in reference with which of t...
Question 966: Risks that remain after avoidance, transfer and mitigation a...
Question 967: Which of the following describes the longest path through a ...
Question 968: Non-verbal communication includes:...
Question 969: You are defining evaluation criteria for your project. The p...
Question 970: A tool which links the project roles and responsibilities to...
Question 971: You are managing a project with AC = $25,100, ETC = $45,600,...
Question 972: Which contract type consists of - target costs &amp; profit,...
Question 973: You are in the process of controlling changes to the project...
Question 974: A communicator can present information using the following m...
Question 975: The project management executing processes include all of th...
Question 976: Which is not input to Define Activities:...
Question 977: Which of the following statements is true regarding PDM (pre...
Question 978: A deficiency in characteristics that render the quality of t...
Question 979: You are the project manager at a large automaker in Japan. Y...
Question 980: You are in the process of controlling changes to the project...
Question 981: You are managing a software project. The stakeholders have f...
Question 982: Risk Management Plan may include:...
Question 983: The review of key deliverables and project performance at th...
Question 984: A WBS dictionary is a document which......
Question 985: Which of the following statements are true regarding funding...
Question 986: The project manager must be concerned with building a closel...
Question 987: Which of the following statements are true regarding random ...
Question 988: An input to the scope change control process is:...
Question 989: You are currently in the closing process and are involved in...
Question 990: A project is defined in the PMBOK as:...
Question 991: A Work Breakdown Structure provides a framework from which a...
Question 992: You are in the process of monitoring the various project pro...
Question 993: Brandi is a project manager on a software project. About hal...
Question 994: Which of the following are NOT described in the PMI's Member...
Question 995: The best way to insure quality conformance is to _____....
Question 996: The "Cost of quality" project management concept includes __...
Question 997: You are being hired to manage a highway construction project...
Question 998: You are in the process of controlling changes to the project...
Question 999: Paraphrasing is most closely associated with which part of t...
Question 1000: You are the project manager for a cable service provider. Yo...
Question 1001: You are the project manager for BB Tops, a nationwide toy st...
Question 1002: Your project team is in the process of identifying project r...
Question 1003: With respect to risk management, which of the following stat...
Question 1004: You are a project manager for a software project. Your team ...
Question 1005: Percent complete is calculated by:...
Question 1006: The cost baseline is an output of what process?...
Question 1007: You need a batch of 100 identical valves which will be custo...
Question 1008: Which of the following statements are true regarding project...
Question 1009: Many companies self insure against some risk. Problems which...
Question 1010: You know that PV = 470, AC = 430, EV = 480, EAC = 500, and B...
Question 1011: Your spouse works for a vendor and the vendor bidding on a p...
Question 1012: A project underwent a major Scope change, which increased co...
Question 1013: In your last project status meeting, you had 15 team members...
Question 1014: Which of the following statements are true regarding proposa...
Question 1015: The critical path in a schedule network is the path that:...
Question 1016: Poor allocation of time and resources and inadequate quality...
Question 1017: Which of the following is generally not regarded as an eleme...
Question 1018: You are the project manager for an information technology di...
Question 1019: All of the following statements about acceptance sampling ar...
Question 1020: The outputs of Contract Administration are correspondence, c...
Question 1021: You have been recently hired to be a project manager at a bi...
Question 1022: When is passive risk acceptance an appropriate approach?...
Question 1023: You are a project manager in a matrix organization. All of t...
Question 1024: The planned cost for the total project at its inception is c...
Question 1025: Which of the following is NOT included in a cost of quality ...
Question 1026: A project manager discovers an urgent need for outsourced re...
Question 1027: Which of the following is displayed as an S curve?...
Question 1028: What are decision models?
Question 1029: You are in the process of making information available to pr...
Question 1030: The formal invitation to submit a price for specified goods/...
Question 1031: Which of the following statement are FALSE regarding the pro...
Question 1032: In your project, you have designated a group of people to mo...
Question 1033: The primary communication skills you will use in working wit...
Question 1034: Who can apply the project selection methods to decide whethe...
Question 1035: You are an information security project manager responsible ...
Question 1036: You are project manager of ABC company and you have to choos...
Question 1037: Which of the following is an input of scope change control?...
Question 1038: Which is the most important element of Project Management Pl...
Question 1039: Which of the following defines, the procedures by which the ...
Question 1040: Who is the stakeholder of the project?...
Question 1041: All of the following statements re true regarding contract n...
Question 1042: Common causes of variances are a result of all of the follow...
Question 1043: All of the following are true regarding configuration manage...
Question 1044: The process of Manage Stakeholder Expectations is part of wh...
Question 1045: 2 people are arguing about what needs to be done to complete...
Question 1046: A project element which lies between two events is called:...
Question 1047: The project Network Diagram is an input to what process?...
Question 1048: The work breakdown structure which is an output of scope def...
Question 1049: What are the 5 kinds of power?
Question 1050: Which is the best thing to do during the Source Selection pr...
Question 1051: You are the project manager within an information technology...
Question 1052: You have been assigned to a project to construct a 18-hole g...
Question 1053: which of the following best describes the request seller res...
Question 1054: Which of the following is true about procurement documents?...
Question 1055: A project has seven activities: A, B, C, D, E, F, and G. Act...
Question 1056: Before reporting a perceived violation of an established rul...
Question 1057: A unilateral contract under which the seller is paid a prese...
Question 1058: During closeout, many project managers tend to delay personn...
Question 1059: Inputs into Resource Planning include:...
Question 1060: Management reserve is needed on projects. According to the P...
Question 1061: You are the project manager for Insomniacs International. Si...
Question 1062: Which of the following processes uses the approved project s...
Question 1063: This measurement is the value of the work that has been comp...
Question 1064: Response development is sometimes referred to as...
Question 1065: Risk identification should be done...
Question 1066: A comparison of completion status to baseline is referred to...
Question 1067: A Schedule Management Plan is developed in which of the foll...
Question 1068: Which of the following statements are false regarding cost a...
Question 1069: Your project les need to be sent via overnight mail to your ...
Question 1070: One of the outputs of risk identification is...
Question 1071: Who is going to issue project charter?...
Question 1072: You are in the process of reviewing offers and choosing amon...
Question 1073: Which of the following documents generated by the create WBS...
Question 1074: In small companies, project managers and line managers are:...
Question 1075: Approved changes are implemented in which process?...
Question 1076: You are the project manager for a company that sells online ...
Question 1077: Change control system, variance analysis, replanning and con...
Question 1078: A proven effective means to insure quality conformance is to...
Question 1079: All of the following are outputs the closure project process...
Question 1080: All of the following are correct statements about a project ...
Question 1081: Which of the following relationships is used in Arrow Diagra...
Question 1082: In general, groups will ____ the average individual problem ...
Question 1083: You are in the process of defining activities that need to b...
Question 1084: Which of the following processes involves analyzing activity...
Question 1085: Which of the following statements are NOT true regarding cor...
Question 1086: You are using the three-point estimating technique to estima...
Question 1087: Cost forecasting calculations include:...
Question 1088: Which of the following is the correct order of the Monitorin...
Question 1089: Who has MOST of the power in strong matrix organization?...
Question 1090: Which of the following statements are FALSE regarding projec...
Question 1091: Which type of bilateral contract is used for high dollar, st...
Question 1092: You are project manager for a project with a multi-million v...
Question 1093: Quality assurance
Question 1094: All of the following are inputs to the quality process EXCEP...
Question 1095: All of the following are inputs to the Close Project process...
Question 1096: In a country with high level of violence in public, a local ...
Question 1097: All of the following are tools of Perform Quality Control EX...
Question 1098: Your goal as a project manager is to manage stakeholders to ...
Question 1099: You are the project manager assigned to construct a new 10-s...
Question 1100: Which of the following best describes cost incurred in the p...
Question 1101: Schedule model data, which is an input of the schedule devel...
Question 1102: In order to let the project sponsor know the percentage of c...
Question 1103: A project plan generally includes the following:...
Question 1104: Which performance measurement tells us how much more of the ...
Question 1105: You have identified an opportunity to potentially increase t...
Question 1106: To accommodate a new project in your department, you need to...
Question 1107: Quality management deals with all of the following except:...
Question 1108: The initial cost of a product and the product's operation an...
Question 1109: The amount of time that an activity can be delayed from its ...
Question 1110: Which of the following risks are generally considered unpred...
Question 1111: Which of the following tools and techniques of the Select Se...
Question 1112: Consider the project integration management knowledge area. ...
Question 1113: In reviewing your earned value reports you notice that your ...
Question 1114: Which of the following statements are true regarding bar cha...
Question 1115: Which technique would you be using if you analyze which sequ...
Question 1116: Which of the following are NOT tools/ techniques of the Plan...
Question 1117: A program is:
Question 1118: Work performance information is an input to Cost Control pro...
Question 1119: You know that BAC = 500, PV = 325, ACC = 275, CPI = .9, and ...
Question 1120: Which of the following are NOT outputs of the activity durat...
Question 1121: The following individuals are responsible for determining th...
Question 1122: All of the statements are true regarding Analogous Estimatio...
Question 1123: You are the project manger at a utility company. Due to the ...
Question 1124: Which of the following best describes secondary risks?...
Question 1125: An activity-on-node (AON) network diagram shows the followin...
Question 1126: You are in the process of painting your house. Since you do ...
Question 1127: The most common non-behavioral reason for projects being com...
Question 1128: When there is uncertainty associated with one or more aspect...
Question 1129: Which of the following control types has the highest risk to...
Question 1130: Which of the following statements are false regarding projec...
Question 1131: Which of the following is not an input to overall change con...
Question 1132: All of the following statements are true regarding the reque...
Question 1133: The principles of risk management should be followed only fo...
Question 1134: _____________ includes the process required to ensure that t...
Question 1135: You are evaluating several different motivational strategies...
Question 1136: Being the project manager in a high risk electronics project...
Question 1137: Management plans include all of the following except:...
Question 1138: Which of the following BEST describes the main purpose of th...
Question 1139: Project alternatives are examined during the _____ phase of ...
Question 1140: Create Procurement document is done in _______....
Question 1141: Which of the following project management areas contains the...
Question 1142: Managers who adopt a sound, but prudent managerial style are...
Question 1143: You are working in the Project Office of your organization. ...
Question 1144: The administrative closure procedure is an output of the clo...
Question 1145: The accounting head asks an assistant to cut the payroll che...
Question 1146: You are a project manager of Software Product Company. After...
Question 1147: You are in the process of estimating the number of work peri...
Question 1148: You are a contract project manager for a wholesale flower di...
Question 1149: Which of the following situations will cause schedule activi...
Question 1150: There are three outputs that are common to scope, schedule a...
Question 1151: You are currently performing the Select Sellers process. You...
Question 1152: You are working with XYZ organization and all the employees ...
Question 1153: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 1154: Perhaps the biggest problem facing the project manager durin...
Question 1155: You work at RFID-PM Inc, a publicly traded company that deve...
Question 1156: You have assembled your thoughts into a message. As you pass...
Question 1157: Which of the following is most closely associated with busin...
Question 1158: The duration of most activities will be significantly influe...
Question 1159: The duration of most activities will be significantly influe...
Question 1160: Which of the following is NOT a valid reason to authorize a ...
Question 1161: You are currently analyzing the schedule of a project. You h...
Question 1162: Using Force field analysis to monitor and control how attrib...
Question 1163: Earned value analysis is a performance reporting tool/ techn...
Question 1164: You are in the process of controlling changes to the project...
Question 1165: Which of the following statements are true regarding decisio...
Question 1166: What are extrinsic motivators?
Question 1167: You are the project manager for a railroad construction proj...
Question 1168: Roger works for a manufacturer of automotive engines. He has...
Question 1169: Activity Resource Requirements is an input to ____________:...
Question 1170: Which of the following BEST describes the procedures by whic...
Question 1171: You are a project manager for Laredo Pioneer's Traveling Rod...
Question 1172: The main objective of providing incentives in contracts is t...
Question 1173: Project Risk _____ .
Question 1174: You are in the process of identifying and documenting the pr...
Question 1175: Inputs to Administrative Closure include all of the followin...
Question 1176: Examples of team building activities include:...
Question 1177: Project team building is most difficult in which type of env...
Question 1178: Adjusting Leads and Lags is a technique for:...
Question 1179: As a project nears completion, you notice that the functiona...
Question 1180: If a project manager communicates a verbal message to a subo...
Question 1181: You are a project manager for Dutch Harbor Consulting. Your ...
Question 1182: Which of the following is not one of the five project manage...
Question 1183: You are a project manager of ABC company and working on gath...
Question 1184: According to the PMI, who should develop the project charter...
Question 1185: The comprehensive review of a contractor's technical perform...
Question 1186: A customer requires from you a minor scope change and expect...
Question 1187: Which of the following statements are false regarding reward...
Question 1188: Which of the following statements are TRUE regarding compara...
Question 1189: Which enterprise environmental factor defines how work is as...
Question 1190: Outputs from response development could include all except?...
Question 1191: Scope planning includes alternatives identification, which c...
Question 1192: Constructive team roles include:...
Question 1193: Which of the following shows roles and responsibilities on y...
Question 1194: Which of the following statements are NOT techniques used to...
Question 1195: Which of the following statements re true regarding Bidder C...
Question 1196: Which of the following inputs belongs to Resource Planning?...
Question 1197: Which of the following is the BEST example of a reward syste...
Question 1198: In the first attempt in resource leveling the project schedu...
Question 1199: You're managing an industrial design project. Your project i...
Question 1200: All of the following are types of strategies that one can us...
Question 1201: Which of the following is NOT an example of a type of schedu...
Question 1202: Your company has asked you to be the project manager for the...
Question 1203: You are a project manager working on contract with a company...
Question 1204: Assignable cause or special variation is:...
Question 1205: Which of the following statements are true regarding the dif...
Question 1206: Ensuring that all work is both authorized and funded by cont...
Question 1207: Critical input to scope initiation is:...
Question 1208: Failure costs are also known as which of the following?...
Question 1209: Product verification is usually performed in the closing pro...
Question 1210: The engineering department has raised a question about the e...
Question 1211: Keeping up with the growth was becoming a problem for a priv...
Question 1212: Who is responsible for decide project management process for...
Question 1213: You are a project manager for Pizza Direct, which is a retai...
Question 1214: The most effective means of determining the cost of a projec...
Question 1215: During what phase of project lifecycle is the level of risk ...
Question 1216: Which of the following statements are true regarding cost an...
Question 1217: Cost aggregation, reserve analysis, funding limit reconcilia...
Question 1218: Your team has prepared a CPM schedule for your review. You n...
Question 1219: During an informal discussion you had with another PMP, he m...
Question 1220: Make or buy decisions are usually made during the _____ phas...
Question 1221: During the planning phase of a project, you realize that mor...
Question 1222: A project manager tracks the work of team members using a ne...
Question 1223: All of the following statements are true except:...
Question 1224: Which of the following is NOT found in a project charter?...
Question 1225: In taking over a failing project you hold a status meeting a...
Question 1226: Which of the following statements are false?...
Question 1227: A regulation is a document that lays down provisions with wh...
Question 1228: You are currently in the process of prioritizing risks by th...
Question 1229: You are the project manger at a software company developing ...
Question 1230: You are in the process of estimating the number of work peri...
Question 1231: Considering alternate suppliers is a form of _____....
Question 1232: Theory Y managers believe which of the following?...
Question 1233: Which of the following is not a method for acquiring team me...
Question 1234: Your organization discusses running a project which will ent...
Question 1235: Which of the following is NOT a stakeholder?...
Question 1236: Your stakeholders have asked for an analysis of the cost ris...
Question 1237: You are the project manger at a leading manufacturer of cons...
Question 1238: You are the project manager for Design Your Web Site, Inc. Y...
Question 1239: You are the project manager at a manufacturer of electronic ...
Question 1240: The project manager has the greatest influence over quality ...
Question 1241: You are in the contract Closure process and are reviewing th...
Question 1242: In communication, which of the following is not a responsibi...
Question 1243: You are currently the project manager for a software develop...
Question 1244: The core planning processes include:...
Question 1245: The contingency allowances established to cover unforeseen c...
Question 1246: All of the following statements are true regarding the criti...
Question 1247: You know that the next status meeting will require some disc...
Question 1248: You are managing a software engineering project, when two te...
Question 1249: In a matrix organizational form, MBO may be difficult to imp...
Question 1250: During project execution, a line manager informs you that he...
Question 1251: Project cash reserves are often used for adjustment in escal...
Question 1252: All of the statements are false regarding variance analysis?...
Question 1253: As project manager, which of the following activities most d...
Question 1254: Your project management software always allocates scarce res...
Question 1255: Which of the following planning considerations is often over...
Question 1256: Each Organization measures project team performance in its o...
Question 1257: You are managing a project with a total budget of $450,000. ...
Question 1258: Which of the following best describes the conflict that aris...
Question 1259: An Activity has an Optimistic estimate of 10 days, pessimist...
Question 1260: The terms strong matrix, balanced matrix, and weak matrix wh...
Question 1261: You are in process of developing an approximation of the cos...
Question 1262: Your company manufactures CPU for high-end workstation compu...
Question 1263: Which of the following is not a project?...
Question 1264: The __________ is a document which describes how the project...
Question 1265: Which of the following best describes the expectancy theory ...
Question 1266: Which of the following is the BEST thing to do at a bidder c...
Question 1267: Amount at Stake is the _____ .
Question 1268: Negotiation, pre assignment, and acquisition are tools and t...
Question 1269: For the following group of numbers, 80, 10, 10, 50, 70, and ...
Question 1270: Which of the following statements are TRUE regarding the sco...
Question 1271: To identify which quality standards are relevant to a projec...
Question 1272: The most precise or accurate estimate for determining projec...
Question 1273: Which of the following scheduling techniques incorporates a ...
Question 1274: Which f the following processes involves determining and doc...
Question 1275: Contract close out contains:
Question 1276: Which of the following represents the MAIN function of the c...
Question 1277: You expect the types of variances that have occurred on the ...
Question 1278: Which of the following forecasts the most likely total proje...
Question 1279: Which of the following is not a measure of the profitability...
Question 1280: In your construction project, the CPI is 1.30 and SPI is 0.8...
Question 1281: Researching, organizing and recording pertinent information ...
Question 1282: The performance review interview is a vital component of any...
Question 1283: You have recently been named as the project manager of a new...
Question 1284: Which of the following are outputs of the Develop Project te...
Question 1285: Which of the following statements are FALSE regarding Projec...
Question 1286: All the following statements about float are correct except:...
Question 1287: Project managers spend what percentage of their time communi...
Question 1288: You are a project manager for Cinema Snicker Productions. Yo...
Question 1289: You are the project manager in the I.T department of major h...
Question 1290: Project execution is very much an integrative process whereb...
Question 1291: Which statement describes best the purpose of the Communicat...
Question 1292: Earned value analysis is a performance reporting tool/ techn...
Question 1293: You work as project manager at a beauty products company. On...
Question 1294: Project Integration Management
Question 1295: According to John R. Adams Ph.D., there are five sources of ...
Question 1296: Clearly defined group goals are important because they _____...
Question 1297: Which performance measurement tells you how much more of the...
Question 1298: The first step in building a PERT/CPM network is to:...
Question 1299: Quantitative assessment(s) of the likely costs of the resour...
Question 1300: A project schedule can be presented in various formats. All ...
Question 1301: You are currently the project manager for a software develop...
Question 1302: Resource leveling allocates scarce resources to critical pat...
Question 1303: Two of your project team members approach you with a conflic...
Question 1304: Product acceptance criteria should be laid down in which doc...
Question 1305: What is Benefit cost ratio (BCR)?...
Question 1306: You are the project manager at a large automaker in Japan. Y...
Question 1307: Amit is the manager of a software project. His client has ag...
Question 1308: You are managing a construction project that is currently be...
Question 1309: At the beginning of a project you are asked for an order of ...
Question 1310: 40. During which process is the Cost baseline developed?...
Question 1311: Michael works as a project manager at a construction company...
Question 1312: As you are executing your project you are constantly checkin...
Question 1313: A project manager disclosed some crucial information to a pr...
Question 1314: To determine whether or not the employee correctly understan...
Question 1315: Which is a technique for Define Activities?...
Question 1316: Executing the risk response plan in order to react to risk e...
Question 1317: You are in the process of establishing a total cost baseline...
Question 1318: The project charter:
Question 1319: The risk monitoring and control process involves all of the ...
Question 1320: Which of the following is not considered a cost of nonconfor...
Question 1321: A project manager is reporting the final status of the close...
Question 1322: Which of the following are part of the purchasing cycle:...
Question 1323: The monitor and control project work process is performed to...
Question 1324: You are in the process of controlling changes to the project...
Question 1325: You are the project manager for a large children's toys manu...
Question 1326: Which of the following is typically displayed as a S-shaped ...
Question 1327: You are the project manager for a company that sells online ...
Question 1328: Which of the following is not an input to cost budgeting?...
Question 1329: Which of the following is false regarding recognition and re...
Question 1330: A company is about to begin work on a large construction pro...
Question 1331: The act of conducting or supervising the exchange of informa...
Question 1332: Sensitivity analysis can be used in risk analysis to:...
Question 1333: Using visual aids during management/customer presentations w...
Question 1334: You are the project manager for a construction company that ...
Question 1335: Which of the following statement are false?...
Question 1336: You know that BAC = 500, PV = 325, ACC = 275, and EVC = 250 ...
Question 1337: The Pareto Principle is a technique used to determine which ...
Question 1338: You are the project manager responsible for developing a new...
Question 1339: Which is not an activity attribute:...
Question 1340: Valid reasons for considering termination of a project inclu...
Question 1341: The WBS usually:
Question 1342: What involves determining what quantities are to be used to ...
Question 1343: In project communications, the sender is responsible for:...
Question 1344: Which of the following is a common characteristic of most pr...
Question 1345: A project team member has been having a big disagreement wit...
Question 1346: As a PMP, you are required to comply with the PMP Code of Pr...
Question 1347: Collocation can mean:
Question 1348: A warranty may not be a remedy for products delivered unfit ...
Question 1349: A lessons learned is BEST completed by:...
Question 1350: A WBS provides a framework from which all of the following c...
Question 1351: All the following are examples of product documentation exce...
Question 1352: Your project has a virtual team. Half of your team members a...
Question 1353: A review of your project team member's most recent performan...
Question 1354: In Project Risk Management, Risk Response may include action...
Question 1355: All of the following are true regarding change control syste...
Question 1356: Following are various outputs. Which output is a consequence...
Question 1357: All of the following statements are true regarding the commu...
Question 1358: Which of the following statements are true regarding project...
Question 1359: Which of the following are not inputs to the develop prelimi...
Question 1360: Project Cost Management Plan is created as a part of:...
Question 1361: Given the following estimates: Optimistic 3 days, Pessimisti...
Question 1362: You are a project manager at an utility company. Due to the ...
Question 1363: A project is defined as:
Question 1364: Complete the following sentence: "The later a defect is foun...
Question 1365: You are the project manager for the manufacturer of children...
Question 1366: What document contains the following: type of contract to be...
Question 1367: Project management/project planning is most closely aligned ...
Question 1368: While project work is being done, conflicts can arise betwee...
Question 1369: A quality control manager decides to increase his daily samp...
Question 1370: All of the following are types of strategies that one can us...
Question 1371: Risk management methodology should be adhered to in:...
Question 1372: Which is not correct about initial phase of a project?...
Question 1373: Outputs from the Initiation process include:...
Question 1374: Risk management is defined as the art and science of _____ r...
Question 1375: Your organization shifting from weak matrix organization to ...
Question 1376: Management decision-making includes:...
Question 1377: A life cycle project manager tends to have the following cha...
Question 1378: Which is not a tool or technique for Source Selection?...
Question 1379: You are the project manager of a company that is building AT...
Question 1380: Which of the following tools and techniques can be used to c...
Question 1381: The term Baseline is used in both disciplines Project manage...
Question 1382: The core planning processes are:...
Question 1383: You are in the process of developing an approved project sch...
Question 1384: The inputs of the Performance Reporting process include all ...
Question 1385: The project manager's leadership style should be matched to ...
Question 1386: Which of the following are NOT described in the PMI's member...
Question 1387: According to PMI, application areas are categories of projec...
Question 1388: You have eight key stakeholders to communicate with on your ...
Question 1389: You are the project manager at Day-Old donuts, a rapidly gro...
Question 1390: The marketing department has just discovered that a competit...
Question 1391: Which of the following process involves determining project ...
Question 1392: Which of the following best describes the triple constraint?...
Question 1393: What is the order of the Procurement Management processes?...
Question 1394: All of the following are FALSE regarding bar charts EXCEPT:...
Question 1395: Which of the following processes involves developing necessa...
Question 1396: CORRECT TEXT All of the following statements are TRUE regard...
Question 1397: Monte Carlo analysis is
Question 1398: Which of the following communication media is least accepted...
Question 1399: You are a project manager for Giraffe Enterprises. You've re...
Question 1400: In your project, there have been several changes in the cost...
Question 1401: Contingency planning is a means to _____ risks to the projec...
Question 1402: Traits of a participative manager include:...
Question 1403: You are the project manager at a large accounting firm in th...
Question 1404: Which of the following would LEAST likely to be found as par...
Question 1405: You have a geographically dispersed team, from whom you woul...
Question 1406: Which of the following are the outputs of the activity resou...
Question 1407: Which of the following statements are true regarding the pro...
Question 1408: Your company is making a strategy shift: form being focused ...
Question 1409: The project charter either directly or by reference to other...
Question 1410: You're the project manager on a software project that is pla...
Question 1411: The major difference between PERT and CPM networks is:...
Question 1412: Your project is nearing completion when a previously undocum...
Question 1413: Which of the following statements is in agreement with McGre...
Question 1414: The sponsor has informed you that the resources for your pro...
Question 1415: You are the project manager in the I.T. department of a majo...
Question 1416: Historical records during close-out are useful to _____ and ...
Question 1417: Which of the following is part of the expectency theory of m...
Question 1418: Which of the following statements are true regarding quality...
Question 1419: You work as a senior project manager for a leading manufactu...
Question 1420: The customer has reviewed the deliverables of a project and ...
Question 1421: According to labor law, which of the following management ac...
Question 1422: In crashing the schedule, you would focus on:...
Question 1423: A Work Breakdown Structure:
Question 1424: Increasing resources on the critical path activities may not...
Question 1425: Financial compensation is the primary motivational tool for ...
Question 1426: Which of the following are outputs of the develop project te...
Question 1427: Which statement is TRUE about Present Value(PV)?...
Question 1428: All the following are inputs to Activity Duration Estimating...
Question 1429: The future value of an annual income flow of $1000 for 2 yea...
Question 1430: You are in the process of planning a project and found that ...
Question 1431: When a project is being performed under contract, the SOW is...
Question 1432: Which of the following statements are false regarding the cl...
Question 1433: Consider the Project Integration Management knowledge area. ...
Question 1434: Douglas McGregor's Theory Y advocates that the average worke...
Question 1435: Which of the following statements regarding quality audits a...
Question 1436: As the leader of a project team, the project manager may be ...
Question 1437: Which is not a type of project review meeting?...
Question 1438: Which of the following time robbers end up creating addition...
Question 1439: You have just awarded a contract to a outside vendor and dev...
Question 1440: What type of organization experiences the least amount of st...
Question 1441: Your company creates software products. It is introducing a ...
Question 1442: Which of the following is generally the MOST CORRECT use of ...
Question 1443: Project staff assignments are an output of which process?...
Question 1444: Unplanned responses to emerging risks that were earlier acce...
Question 1445: You are in the process of estimating the type and quality of...
Question 1446: Who is responsible for issuing the project charter?...
Question 1447: Which of the following are not tools/ techniques that can be...
Question 1448: Which equation correctly illustrates the cost variance of a ...
Question 1449: You work for a consulting company and your team has implemen...
Question 1450: In which of the following process is the qualified sellers l...
Question 1451: When all members must unanimously agree before a decision is...
Question 1452: At what stage in a project are Administrative closure activi...
Question 1453: According to the PMI, which of the following best describes ...
Question 1454: Which of the following process takes the activities that are...
Question 1455: Which of the following documents formally indicates that the...
Question 1456: You are the project manager for Fun Days Vacation Resorts. Y...
Question 1457: Which of the following statements are FALSE regarding analog...
Question 1458: Which of the following are not situations where pre assignme...
Question 1459: You are using the three-point estimating technique to estima...
Question 1460: Communications is best described as:...
Question 1461: During the planning phase of your current project, you prepa...
Question 1462: You are the project manager for the Heart of Texas casual cl...
Question 1463: You are in the process of directing the performance of the p...
Question 1464: Which of the following processes utilize rolling wave planni...
Question 1465: All of the following statements are true regarding the RBS e...
Question 1466: The purpose of configuration management is to:...
Question 1467: Which of the following statements are true regarding colloca...
Question 1468: Which of the following is most closely associated with pure ...
Question 1469: With respect to risk management planning, timing defines how...
Question 1470: Which of the following statements are true regarding the sco...
Question 1471: You are a project manager for Pizza Direct, which is a retai...
Question 1472: The applied level of change control is LEAST dependent upon:...
Question 1473: Which of the following is not an input into organizational p...
Question 1474: All of the following are constraints that can limit flexibil...
Question 1475: The business needs, strategic plan, and product scope descri...
Question 1476: You are in the process of identifying and documenting the pr...
Question 1477: Which of the following statements are FALSE regarding contra...
Question 1478: A Pareto chart helps focusing on......
Question 1479: Electronic Company has a reliability of 0.90. 2 of these com...
Question 1480: Which of the following process involves making needed inform...
Question 1481: Which of the following is NOT a tool/ technique of the Devel...
Question 1482: All of the following are outputs of the close project proces...
Question 1483: An acceptance control chart has limits that are based on the...
Question 1484: Developing a written scope statement as the basis for future...
Question 1485: You've just completed the WBS. Which of the following statem...
Question 1486: Which is ensuring all features and functions are included in...
Question 1487: All the techniques described below can be used to keep a mee...
Question 1488: What documents the characteristics of the product or service...
Question 1489: Which method of conflict resolution tends to increase confli...
Question 1490: Total project risk can be defined as:...
Question 1491: Change requests should be ______ ?...
Question 1492: A project manager is faced with two team members who have co...
Question 1493: Using the data shown: TARGET COST: 12,000, TARGET FEE: 1000,...
Question 1494: The document authorizing functional areas to charge against ...
Question 1495: Surveys have shown that the primary skill needed to be a pro...
Question 1496: In the initiation phase, project manager has been assigned t...
Question 1497: Arbitration is a _____ approach to conflict management in re...
Question 1498: You are a project manager at a biotech company where you are...
Question 1499: Reducing scope, adding resources and using familiar approach...
Question 1500: Please refer to this diagram: (Exhibit) Considering that the...
Question 1501: Rekha is a project manager on a large construction project. ...
Question 1502: Problems can occur in properly defining a project because:...
Question 1503: A particular Process produces parts with Standard Deviation ...
Question 1504: You are interviewing new project managers for your company. ...
Question 1505: Which of the following statements regarding Schedule Network...
Question 1506: The basic terminology for networks includes:...
Question 1507: The risk register describes all identified risks. Which of t...
Question 1508: You are in a meeting with someone who just ate a slice of ga...
Question 1509: Which of the following processes best describes the project ...
Question 1510: Some common formats of performance reports are:...
Question 1511: The major difference between project and line management is ...
Question 1512: As a project manager in a project organization you are const...
Question 1513: Which of the following is a defect?...
Question 1514: Which of the following describes Fast Tracking?...
Question 1515: The strong matrix versus a weak matrix....
Question 1516: Which of the following knowledge areas are part of Project C...
Question 1517: You are in the process of identifying and documenting the pr...
Question 1518: In assigning your new project to you, the program manager te...
Question 1519: You are a contract manager within an information technology ...
Question 1520: Which of the following statement are FALSE regarding the pro...
Question 1521: Your project was just completed, accepted, and closed. As is...
Question 1522: Which of the following best describes the complete set of in...
Question 1523: Scope Management:
Question 1524: An organization chart which shows the organizational units r...
Question 1525: Which of the following concepts are associated with the "Cos...
Question 1526: You are in process of controlling changes to the project sco...
Question 1527: Four people are responsible for establishing cost of quality...
Question 1528: Which is not a consideration in a make or buy decision?...
Question 1529: The WBS is an input to all of the processes EXCEPT:...
Question 1530: You are a project manager for a company that publishes child...
Question 1531: Cost of quality is:
Question 1532: You are running a project which was budgeted based on some R...
Question 1533: The definitive terms of a contract are written during which ...
Question 1534: The Scope Statement incorporates all of the following except...
Question 1535: Range estimating in determining cost risk probabilities requ...
Question 1536: The term resource planning refers to:...
Question 1537: You are using three point estimating technique to estimate t...
Question 1538: Which of the following is NOT a tool in Risk Identification?...
Question 1539: What are the strategies for dealing with positive risks?...
Question 1540: In which of the following organization(s) does the Functiona...
Question 1541: As a project manager, you must formalize acceptance of the p...
Question 1542: Sound, prudent, but often unsophisticated judgement is calle...
Question 1543: You are responsible for launch operations of different NASA ...
Question 1544: You are the project manager at a utility company. Due to the...
Question 1545: What limits the options of the project team?...
Question 1546: You are in the process of establishing a total cost baseline...
Question 1547: The project team has added some additional functionality whi...
Question 1548: Project life cycles are very useful for _____ and _____ ....
Question 1549: You have had your Scope Definition approved and are working ...
Question 1550: The theory that 85 percent of the cost of quality is a manag...
Question 1551: Which of the following statements are FALSE regarding the pr...
Question 1552: The earned value report BCWP at the end of the project...
Question 1553: Management styles associated with production environments, s...
Question 1554: Quantitative risk analysis involves all of the following exc...
Question 1555: You are a project manager for a growing dairy farm. It offer...
Question 1556: What tool have project managers come to use to identify all ...
Question 1557: Physical Work Actually accomplished is also called...
Question 1558: One of your friends is a manager at telecommunications compa...
Question 1559: The project charter is prepared in which scope management pr...
Question 1560: Subnetwork are a term used in reference with which of the fo...
Question 1561: Which of the following is least likely to be used in explain...
Question 1562: You are the project manager at a manufacturer of electronic ...
Question 1563: You are the project manager responsible for constructing new...
Question 1564: Your management announced that they want to put you on a Str...
Question 1565: Consider the project Integration Management knowledge area. ...
Question 1566: Life-Cycle Costing is:
Question 1567: Your top team member has performed extremely well, and you w...
Question 1568: A task-oriented family tree of activities is a:...
Question 1569: Dummy relationships or dummy activities can be used in which...
Question 1570: When items to be purchased for a project are specified by pe...
Question 1571: Which describes how cost variances will be managed?...
Question 1572: Which of the following best describes a win-lose conflict re...
Question 1573: Tools and techniques used during the Quality Planning proces...
Question 1574: Which of the following are NOT used to create the scope base...
Question 1575: You have been recently assigned to provide an accurate proje...
Question 1576: If a property depreciates by the same amount every year, it ...
Question 1577: Which of the following is an output from Cost Control?...
Question 1578: Which of the following describes the input to the direct and...
Question 1579: Fast tracking means to:
Question 1580: The most common method for pricing out non-burdened labor ho...
Question 1581: You are the project manager working on constructing a suspen...
Question 1582: As a project Manager, Problem solving is high in your list o...
Question 1583: All of following are types of strategies that one can use to...
Question 1584: During Human resource planning you identified that your team...
Question 1585: A project can best be defined as:...
Question 1586: Which statement is FALSE about project deliverable?...
Question 1587: Which of the following is equivalent to a lump sum contract:...
Question 1588: The scope statement should include:...
Question 1589: Procurement planning is the process of identifying which pro...
Question 1590: The three major causes of change on a project are-...
Question 1591: All of the following statements define the role of a meeting...
Question 1592: All of the following are true about Project Plan Execution e...
Question 1593: A line manager provides you with three estimates for his act...
Question 1594: A key barrier to team development is:...
Question 1595: These diagrams rank-order factors for corrective action by f...
Question 1596: The two closing procedures are called:...
Question 1597: As the project manager, you chair a weekly exchange of infor...
Question 1598: Which of the following is NOT an input to Perform Quality Co...
Question 1599: Which of the following statements most accurately describes ...
Question 1600: You have been assigned to a project to build a large 30-stor...
Question 1601: During which phase of the project lifecycle is the level of ...
Question 1602: Projects are typically authorized as a result of one or more...
Question 1603: You have been assigned to a project to build a large 30-stor...
Question 1604: Which of the following statements are true?...
Question 1605: As part of the quality audit, the scope statement is checked...
Question 1606: Outputs of Integrated Change Control include:...
Question 1607: CORRECT TEXT You are currently the project manager at a cons...
Question 1608: A type of organization in which the project manager has litt...
Question 1609: In your company, for making investment decisions, the senior...
Question 1610: The work breakdown structure (WBS) is first developed in whi...
Question 1611: What is the purpose of the WBS?...
Question 1612: You are in the process of establishing a total cost baseline...
Question 1613: You are the project manager for the manufacturer of children...
Question 1614: You are in the process of controlling changes to the project...
Question 1615: You are in the process of obtaining necessary human resource...
Question 1616: Which of the following statements are FALSE regarding expect...
Question 1617: The project charter, either directly, or by reference to oth...
Question 1618: On any project, quality should usually be of _____?...
Question 1619: Inputs to contract administration do not include:...
Question 1620: The normal risk of doing business that carries opportunities...
Question 1621: Achieving effective upward communications in an organization...
Question 1622: Scope verification is a part of:...
Question 1623: Two project members have been having some disagreement about...
Question 1624: What is the most important benefit of a 360 degree review?...
Question 1625: The _____ specification delineates specific measurable capab...
Question 1626: ___________ is/are an uncertain event that or condition that...
Question 1627: One of the most common pitfalls in effective communication i...
Question 1628: Which of the following is true regarding the project scope s...
Question 1629: Which of the following is not a Project Management knowledge...
Question 1630: This process uses tools like decomposition and rolling-wave ...
Question 1631: Which of the following describes an input to the direct and ...
Question 1632: You are in the process of analyzing activity sequence, durat...
Question 1633: The use of scarce resources must be decided upon with functi...
Question 1634: Cost management includes:
Question 1635: You have been recently been assigned to provide an accurate ...
Question 1636: Risk management allows the project manager and the project t...
Question 1637: All of the following statements are true regarding issue log...
Question 1638: In general, the best long-lasting approach to settling proje...
Question 1639: Which of the following are not used to create the scope base...
Question 1640: You're managing a project with a schedule performance index ...
Question 1641: You are currently working on a web development project to de...
Question 1642: A complex project will fit best in what type of organization...
Question 1643: Which of the following can you use to determine an individua...
Question 1644: You work for a large manufacturing plant. You are working on...
Question 1645: You are in the process of defining how to plan and execute t...
Question 1646: Which of the following statements are true regarding cost es...
Question 1647: Decomposition of project work involves all of the following ...
Question 1648: You are in the process of controlling changes to a project b...
Question 1649: Project initiation is all of the following except:...
Question 1650: Scope planning is:
Question 1651: Which of the following statements regarding the project char...
Question 1652: Which of the following are the essentials regarding a projec...
Question 1653: Which of the following statements are FALSE regarding qualit...
Question 1654: All of the following are true of Administrative Closure exce...
Question 1655: You are a project manager for Star Light Strings. Star Light...
Question 1656: CIP embodies which of the following principals?...
Question 1657: Which of the following does not contribute to increased Sche...
Question 1658: The senior executive of the company where you work requires ...
Question 1659: The centerline of a standard "Shewhart' control chart repres...
Question 1660: Which is NOT an example of cost of quality?...
Question 1661: The man-hours for project integration activities normally ap...
Question 1662: The scope baseline consists of:...
Question 1663: As a Project Manager you have just completed a 9-month proje...
Question 1664: As the Project Cost Engineer on a high rise development you ...
Question 1665: You've been hired by a large consulting firm to evaluate a s...
Question 1666: Parametric cost estimating involves...
Question 1667: A cost management plan is:
Question 1668: You are the project manager responsible for renovating a 70-...
Question 1669: As a Project Manager, you have to manage the project and lea...
Question 1670: All of the statements regarding rolling wave planning is TRU...
Question 1671: You are a project manager at a construction company who is w...
Question 1672: A project manager trying to communicate accurately to the te...
Question 1673: You have been recently hired to be a project manager at a bi...
Question 1674: The core function of the project manager is...
Question 1675: The process to change a contract clause is __________ the pr...
Question 1676: Deflection or transfer of a risk to another party is part of...
Question 1677: Schedule variance can be determined by:...
Question 1678: Who is responsible to provide project templates, methodologi...
Question 1679: You are in the process of controlling changes to project cos...
Question 1680: Fixed-price contracts place more risk on the _____ ....
Question 1681: The estimated cost to complete (ETC) is _____....
Question 1682: You could obtain measuring equipment with very high accuracy...
Question 1683: A good team leader must be concerned not only with _____ but...
Question 1684: Time management is the allocation of time in a project's lif...
Question 1685: Which of the following techniques may be used on a project t...
Question 1686: Which of the following establishes minimum requirements of p...
Question 1687: Which of the following statements are true regarding the com...
Question 1688: If you are calculating one early start and early finish for ...
Question 1689: You are in the process of estimating the number of work peri...
Question 1690: Feasibility studies occur in which life cycle phase (s)?...
Question 1691: Which of the following is NOT a type of communication?...
Question 1692: All of the following can be used to estimate contingency res...
Question 1693: The budget associated with scope changes that have been appr...
Question 1694: To compare actual project results to planned or expected val...
Question 1695: Which of the following statements concerning bottom-up estim...
Question 1696: The most common form of written project communication is...
Question 1697: As a project manager on a major construction project you spe...
Question 1698: Which statement describes best the meaning of Leadership?...
Question 1699: You scheduled a kick-off meeting in order to announce the st...
Question 1700: A Work Breakdown Structure can be used for all the following...
Question 1701: When planning, organizing, coordinating, and controlling a p...
Question 1702: Your client has terminated your project before it is complet...
Question 1703: The sender is responsible for:
Question 1704: Which organization is same as Functional organization?...
Question 1705: You are collecting information regarding project progress an...
Question 1706: You are managing a construction project using a fixed price ...
Question 1707: Which of the following statements are true regarding the cri...
Question 1708: Which of the following statements are false regarding the co...
Question 1709: A company has to make a choice between two projects, because...
Question 1710: Which of the following statements are false regarding the co...
Question 1711: By using Project Risk Management techniques, project manager...
Question 1712: You work for a large manufacturing plant. Your firm is think...
Question 1713: Please refer to this Decision Tree which shows the analysis ...
Question 1714: You have inherited a project that is in trouble. The team me...
Question 1715: Which of the following are source selection tools or techniq...
Question 1716: You are assigned as a project manager for an internal projec...
Question 1717: There have been too many disagreements within two team-membe...
Question 1718: Which performance measurement tells you what the projected t...
Question 1719: Your project multiple functions. If this decision is made, y...
Question 1720: Keeping up with the growth was becoming a problem for a priv...
Question 1721: Which of the following represents the pinnacle of Maslow's h...
Question 1722: Universal characteristics of effective project managers incl...
Question 1723: Which of the following is NOT a tool or technique of Risk Mo...
Question 1724: When components in a system are arranged in series, system r...
Question 1725: What is the standard deviation for the estimates in the abov...
Question 1726: Topics that deal with people include:...
Question 1727: The major process groups of project management are:...
Question 1728: You are in the process of tracking identified risks, monitor...
Question 1729: Which of the following describes an input to the direct and ...
Question 1730: The objective of duration compression includes all the follo...
Question 1731: The quality management plan documents how the project team w...
Question 1732: The process of assessing the probability and consequences of...
Question 1733: The process of monitoring specific project results to determ...
Question 1734: A project plan is:
Question 1735: You are a project manager at java ice cream factory. You are...
Question 1736: Which of the following is not an external-unpredictable risk...
Question 1737: Using the situation below and assuming continued efficiency ...
Question 1738: Which task has the greatest schedule variance?...
Question 1739: When should risk identification be performed? (select best a...
Question 1740: Which of the following process groups are in loop back relat...
Question 1741: Which of the following tools is used to document the lessons...
Question 1742: The BCWP is 65%, the BCWS is 70%. The project manager wants ...
Question 1743: Processes of configuration management commonly include all o...
Question 1744: In WBS diagramming, the work package is:...
Question 1745: The WBS is:
Question 1746: All of the following statements are true regarding the confi...
Question 1747: A project schedule can be presented in various formats. All ...
Question 1748: Which of the following BEST describes a mutually binding leg...
Question 1749: Under what knowledge area is the primary process area for ca...
Question 1750: You identified a technical risk in your project and assigned...
Question 1751: Your organization has the choice between several internal pr...
Question 1752: Which of the following utility functions reflects risk-avers...
Question 1753: You are a contract project manager within an information tec...
Question 1754: Confirmation that the project has met all customer requireme...
Question 1755: To determine the tangible and intangible costs and benefits ...
Question 1756: Which of the following is not a tool or technique for cost c...
Question 1757: The marketing department has just discovered that most buyer...
Question 1758: The outputs of the Close Project process include all of the ...
Question 1759: You are managing a design project. You find that bringing al...
Question 1760: Quality control is normally performed by the _____ ....
Question 1761: Your company manufactures memory chips for workstation compu...
Question 1762: While preparing your risk responses, you realize that you ha...
Question 1763: Management wants to be sure that the project is following de...
Question 1764: Scope definition is necessary to...
Question 1765: The most expensive phase of life cycle costing is:...
Question 1766: A project kick off meeting is usually conducted to:...
Question 1767: While implementing your project, a team member brings to you...
Question 1768: Which of the following can be used to measure overall projec...
Question 1769: As a software development manager in a boutique software sho...
Question 1770: The Statement of Work (SOW) is developed during the _____ cy...
Question 1771: All the following are tools and techniques for performance r...
Question 1772: You are managing a project to install a new postage software...
Question 1773: You work for a large manufacturing plant. You are working on...
Question 1774: Which of the following requires an expenditure of the resour...
Question 1775: Which of the following would you use in risk identification ...
Question 1776: The net present value of $110 one year from now at 10% is:...
Question 1777: Co-location can help with:
Question 1778: Which of the following is buyer-prepared formal request sent...
Question 1779: All the following statements are true regarding communicatio...
Question 1780: Risk management requires an understanding that _____ ....
Question 1781: You are presented the following schedule data regarding vari...
Question 1782: Forecasting human resource requirements necessitates making ...
Question 1783: Which of the following is NOT a characteristic of the Projec...
Question 1784: You are in process of identifying and documenting the projec...
Question 1785: Statistical cost estimating techniques (based upon history),...
Question 1786: All of the following are communication tools EXCEPT:...
Question 1787: Risk to the project can be categorized by all of the followi...
Question 1788: An output of scope definition is:...
Question 1789: Key Management skills include:
Question 1790: You are a project manager of ABC organization. Your project ...
Question 1791: Tools and techniques for scope planning include...
Question 1792: Which of the following is not an appropriate reason to provi...
Question 1793: Your company's quality assurance department has performed a ...
Question 1794: All of the following are generally true about a Project Char...
Question 1795: Which of the following represents the BEST way to organize p...
Question 1796: Which of the following are outputs from the Communications P...
Question 1797: If project time and cost are not as important as the number ...
Question 1798: You are an information security project manager responsible ...
Question 1799: Which of the following establishes the procedure to perform ...
Question 1800: Maslow ranked Human needs from the highest to lowest...
Question 1801: You are the project manager of a project .You have just comp...
Question 1802: The cost of choosing one project and giving up another proje...
Question 1803: A notice sent to a sub-contractor about the contract is an e...
Question 1804: The Estimate At Completion (EAC) can be used to forecast the...
Question 1805: Which of the following statements is true regarding the crit...
Question 1806: As a PMP, one of your responsibilities is to ensure integrit...
Question 1807: When you look at a control chart that measures defects in th...
Question 1808: A organization where power shared between project manager an...
Question 1809: Historical records from previous project are generally used ...
Question 1810: Which of the following risks should be classified as a force...
Question 1811: You are presented the following schedule data regarding vari...
Question 1812: Which of the following is NOT and output of manage stake hol...
Question 1813: You are a project manager at for an information technology d...
Question 1814: Scoring models, comparative approaches and benefit contribut...
Question 1815: The most difficult decision for the executive sponsors to ma...
Question 1816: Reserve Analysis is a technique for:...
Question 1817: Cost Estimating is most closely linked with which other proc...
Question 1818: You are the project manager at a large automaker in Japan. Y...
Question 1819: __________ involves using project characteristics in a mathe...
Question 1820: The Japanese resource management model exhibits:...
Question 1821: Which of the following tools can be used to help to analyze ...
Question 1822: Your company manufactures memory chips for workstation compu...
Question 1823: Your management has decided that all orders will be treated ...
Question 1824: A team member is showing up late to work and leaving early, ...
Question 1825: Risks and Triggers are outputs of:...
Question 1826: You are the project manger for Xylophone Phonics. This compa...
Question 1827: At which stage, project cost is maximum?...
Question 1828: Modern Quality Management means:...
Question 1829: You are currently the project manager at rapidly growing ret...
Question 1830: The performing organization is trying to decide whether to s...
Question 1831: Outputs from Organizational Planning include all of the foll...
Question 1832: Management has decided to "crash" a project in order to avoi...
Question 1833: One of the engineers on your team performs a presentation to...
Question 1834: According to the PMBOK Guide, the project manager is identif...
Question 1835: A quality management plan is created during which of the fol...
Question 1836: In taking over a failing project you hold a status meeting w...
Question 1837: Project managers need exceptionally good communication and n...
Question 1838: Which of the following statements are TRUE:...
Question 1839: Which of the following constitute Juran's "quality trilogy":...
Question 1840: You are the project manager for a construction company. Your...
Question 1841: As a Project Manager, you realize that it is very important ...
Question 1842: You are the project manager for a railroad construction proj...
Question 1843: A technique for resolving conflict in which the parties agre...
Question 1844: The core function of the PM is
Question 1845: Using the data below, the point of total assumption occurs a...
Question 1846: Charisma would be an example of _____ power....
Question 1847: The most common types of schedules are Gantt charts, milesto...
Question 1848: Mathematical models using linear, dynamic, integer, or algor...
Question 1849: Each of the following statements describes an element of the...
Question 1850: As the project manager, which of the following techniques wo...
Question 1851: Communication is the PRIME responsibility of a Project:...
Question 1852: You are using the three-point estimating technique to estima...
Question 1853: A project manager recently rewarded an individual with a pro...
Question 1854: Your upcoming project includes project team members from a f...
Question 1855: Your selection committee is debating between two projects. P...
Question 1856: Which of the following Scope Management process involves bre...
Question 1857: You're managing a software project. Your team has discovered...
Question 1858: Which of the following will have the greatest impact on a pr...
Question 1859: You are a project manager for Penguin Software. Your company...
Question 1860: All of the following are examples of quality metrics EXCEPT:...
Question 1861: You are one of four full-time project managers in an organiz...
Question 1862: Which of the following calculates how much additional budget...
Question 1863: What are the documents required to complete project initiati...
Question 1864: Which of the following process is involved in developing an ...
Question 1865: Which of the following statements are true regarding the pro...
Question 1866: Which of the following processes is considered the most effe...
Question 1867: The seller tells you that your activities have resulted in a...
Question 1868: You know that BAC = 375, PV = 300, AC = 200, and EVC = 250. ...
Question 1869: The Delphi Method is _____ .
Question 1870: You are developing the project charter for a new project. Wh...
Question 1871: Which of the following is not a process of project human res...
Question 1872: In general, attempts to smooth out period to period resource...
Question 1873: Business needs and legal requirements are example of:...
Question 1874: Utility Theory:
Question 1875: A WBS should be developed to cover...
Question 1876: Planning activities such that predetermined resource availab...
Question 1877: The determination of conformance with scope requirements is ...
Question 1878: A company is making a decision regarding which model of equi...
Question 1879: All the following are responsibilities of a certified PMP EX...
Question 1880: Projects are typically authorized as a result of one or more...
Question 1881: All of the following statements are true regarding a change ...
Question 1882: A Project charter is a document that......
Question 1883: Collect Requirements is:
Question 1884: Planning components are tools/ techniques of the Activity De...
Question 1885: During the execution of a project to build a complex defence...
Question 1886: During project execution, the customer authorizes and funds ...
Question 1887: An RFP is issued during which step in the procurement proces...
Question 1888: Project termination responsibilities include all of the foll...
Question 1889: Inputs to contract administration include...
Question 1890: Dennis works for an international manufacturer for consumer ...
Question 1891: The most common form of project communication is:...
Question 1892: Which of the following best describes the project human reso...
Question 1893: What is a risk owner?
Question 1894: In what way does free float (FF) differ from total float (TF...
Question 1895: Which of the following is referred to as payback period:...
Question 1896: A project team member submits a suggestion on how to improve...
Question 1897: You have been hired as a project manger for a local communit...
Question 1898: The document that describes the project's scope baseline is:...
Question 1899: You are the project manager for an information technology di...
Question 1900: One of your friends is a manager at telecommunications compa...
Question 1901: You have been recently hired to be a project manager at a so...
Question 1902: The risk register is initiated in the Risk Identification pr...
Question 1903: The quality team for the project consists of several groups....
Question 1904: All of the following are part of scope baseline EXCEPT:...
Question 1905: Which of the following best describes the amount of time one...
Question 1906: The _____ specification delineates specific end use capabili...
Question 1907: A project manager has made a change to the project. What sho...
Question 1908: All of the following are constraints that can limit flexibil...
Question 1909: You are a project manager on a construction project. You hav...
Question 1910: You are the project manager at a manufacturer of electronic ...
Question 1911: Please select the correct order for the five project managem...
Question 1912: Which of the following statements are FALSE regarding the co...
Question 1913: _____ is associated with a buyer's request for materials or ...
Question 1914: You are reviewing performance goals to figure out how much b...
Question 1915: A mandatory prerequisite for team building is:...
Question 1916: All the following are true about contract negotiation except...
Question 1917: What is the main difference between the project charter and ...
Question 1918: Which of the following statements are false regarding the pr...
Question 1919: Which of the following project selection methods is NOT a co...
Question 1920: The project manager is assigned in the?...
Question 1921: You are refining the product description for your company's ...
Question 1922: Which of the following are NOT inputs to the risk identifica...
Question 1923: _________ is normally not a method of RoI (Return on investm...
Question 1924: A bar chart shows the number and type of resources you need ...
Question 1925: All are the part of scope baseline except:...
Question 1926: A major assumption of all network scheduling methods is that...
Question 1927: Which is not part of the Earned Value calculations?...
Question 1928: Reserve Analysis technique NOT used during __________....
Question 1929: Project Cost Management Plan is created as a part of:...
Question 1930: All of the following are examples of virtual teams EXCEPT:...
Question 1931: The process of determining who needs what information, when ...
Question 1932: Which of the following describes the contents of a staffing ...
Question 1933: Techniques for Source Selection include all of the following...
Question 1934: The project schedule is used to determine all of the followi...
Question 1935: All the following statements related to Benefit Cost Ratio (...
Question 1936: You are the project manager at Day-Old donuts a rapidly grow...
Question 1937: You are a project manager for Fountain of Youth Spring Water...
Question 1938: Which statement is false for Constructive changes?...
Question 1939: Which of the following are outputs of the Scope Verification...
Question 1940: Which of the following are NOT inputs to the Develop Project...
Question 1941: In the project environment, the individual ultimately respon...
Question 1942: Inputs to contract closeout include...
Question 1943: Excessive flexibility in specifying requirements will _____ ...
Question 1944: You are the project manager responsible for developing a new...
Question 1945: Analogous Estimate Costs is _________....
Question 1946: You are in process of analyzing the effects of identified ri...
Question 1947: The concept that it is easier and less costly to do the work...
Question 1948: An important part of performing stakeholder analysis is docu...
Question 1949: Procurements audits are a tool/ technique of which of the fo...
Question 1950: You are in the process of developing an approximation of the...
Question 1951: Your customer wants your project, a process to dump "bad" eg...
Question 1952: You have just taken over a project as a project manager, whi...
Question 1953: The traditional organizational form has the disadvantage of:...
Question 1954: A leadership style in which the project manager shares probl...
Question 1955: You are currently in the process of prioritizing risks by th...
Question 1956: The most frequently used construct in Precedent Diagramming ...
Question 1957: Overall change control requires all of the following except:...
Question 1958: Using the PERT, the probability of completing a project at o...
Question 1959: Which concept of locating team members can help them best to...
Question 1960: Which of the following are tools to contract closure process...
Question 1961: You are the project manager within a large multi-national co...
Question 1962: You are a project manager for a software project. As you are...
Question 1963: The time necessary to complete a project is called the _____...
Question 1964: n schedule development, mathematical analysis often produces...
Question 1965: To-complete performance index (TCPI) is represented by which...
Question 1966: Contract administration integrates many of the other knowled...
Question 1967: As a project manager, you realize that handling Project Stak...
Question 1968: The Scope Statement is used in which process...
Question 1969: Which process is not included in Project Time Management?...
Question 1970: Fixed Price contracts place more risk on the:...
Question 1971: All of the following statements regarding bidder conferences...
Question 1972: A vendor has notified you that a shipment will be 3 weeks la...
Question 1973: The project manager must receive reports and briefings from ...
Question 1974: You have just completed the project planning process group a...
Question 1975: Given this portion of the network diagram to the right, what...
Question 1976: You are the project manager for an international contract ma...
Question 1977: What is the work breakdown structure typically used for?...
Question 1978: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 1979: In which of the following scope management processes is the ...
Question 1980: A recurring communication pattern within the project organiz...
Question 1981: Of the following, which conflict resolution strategy is like...
Question 1982: Which of the following will you as the project manager need ...
Question 1983: Which of the following NOT input to project initiation proce...
Question 1984: You are a project manager responsible for the construction o...
Question 1985: Which of the following statements are false regarding the Cl...
Question 1986: Product analysis uses which of the following techniques EXCE...
Question 1987: You are in the process of controlling changes to the project...
Question 1988: The critical path in a network is the path that:...
Question 1989: A Project with a total funding of $70,000 finished with a BA...
Question 1990: In which of the project processes should one determine wheth...
Question 1991: Which of the following is not an output of scope change cont...
Question 1992: The project charter is developed by:...
Question 1993: You are in the process of directing the performance of the p...
Question 1994: Which of the following would be the MOST appropriate thing t...
Question 1995: In the contract for your project, the time schedules and del...
Question 1996: Qualitative risk analysis requires accurate data as its inpu...
Question 1997: A project manager is working in a country where it is custom...
Question 1998: You are the project manager for an information technology di...
Question 1999: Weighting systems, screening systems, and independent estima...
Question 2000: Which is developing an approximation of the costs of the res...
Question 2001: Which risk analysis tool is used to model your risks on a co...
Question 2002: Supporting details for activity cost estimates should includ...
Question 2003: A line manager possesses information which the project team ...
Question 2004: You have been hired as a project manager for a small local b...
Question 2005: Which of the following theories are illustrated by the princ...
Question 2006: Which of the following tool / technique are of develop proje...
Question 2007: You are about 30% through a project. In reviewing the produc...
Question 2008: In a project, a Cost incentive contract has been awarded to ...
Question 2009: A network has been developed with resources from six differe...
Question 2010: Which is not a characterizing content of a document referred...
Question 2011: The Quality Risk _____ .
Question 2012: All of the following statements regarding Control Accounts a...
Question 2013: All of the following statements regarding Control Accounts a...
Question 2014: Mary is a project manager at a consulting company. The compa...
Question 2015: Consider the following situation: A scope change as requeste...
Question 2016: What is true for a project when a Phase gate approach is bei...
Question 2017: In your previous project, the project manager gave a lot of ...
Question 2018: Root Cause Analysis related to ________....
Question 2019: To ensure the effectiveness of corrective actions, correctiv...
Question 2020: A particular process has 2 independent sources of variation....
Question 2021: Which tool and technique integrates scope, cost and schedule...
Question 2022: All of the following statements about control charts are tru...
Question 2023: Which of the following process involves measures project and...
Question 2024: There has been a change to the scope of your project, which ...
Question 2025: Your project was just completed. Because of some unfortunate...
Question 2026: Which of the following is associated with a buyer's request ...
Question 2027: You are the project manager within an information technology...
Question 2028: You must produce 27 widgets. You can only produce 9 widgets ...
Question 2029: What is the preferred method of verifying scope?...
Question 2030: What should you take care of when you Monitor and control pr...
Question 2031: All of the following are objectives of a buyer-conducted per...
Question 2032: Human resource administration is the primary responsibility ...
Question 2033: What do you expect when you are submitting an Invitation to ...
Question 2034: You would like to develop a cost estimates for your project....
Question 2035: Selection criteria for project selection include:...
Question 2036: At appropriate times during your project, you issue task ord...
Question 2037: Which of the following statement are FALSE regarding the pro...
Question 2038: The organizational design of a project is critical to its su...
Question 2039: If the Earned Value is equal to Actual Cost, What does it me...
Question 2040: The party that needs the change resulting from the project, ...
Question 2041: You are a project manager at a project company developing wi...
Question 2042: Team development is undertaken to improve performance. Which...
Question 2043: Based on the chart, while completing the project, a team mem...
Question 2044: Please refer to the figure below: (Exhibit) If these three t...
Question 2045: You are project manager responsible for constructing a new s...
Question 2046: Which of the following is not a major step of decomposition?...
Question 2047: Optimistic 3 days, Pessimistic 9 days, and mostly likely 6 d...
Question 2048: Which of the following is NOT a cost estimation tool or tech...
Question 2049: Dave is the project manager for a construction project that ...
Question 2050: You are a project manager of ABC Company and your project is...
Question 2051: A Run chart is a useful tool to show...44...
Question 2052: You are the Project Manager responsible for developing a sof...
Question 2053: Two weeks ago the project manager was fired for not managing...
Question 2054: Cost management includes processes that are required to main...
Question 2055: A project was budgeted at $1,000,000. The project is meanwhi...
Question 2056: A project manager who, in a deference of opinion with the pr...
Question 2057: A negative cost variance and positive schedule variance mean...
Question 2058: Scheduling is the process by which decisions are made concer...
Question 2059: You are ready to enter a negotiating session with a group th...
Question 2060: The utility of network-based schedules:...
Question 2061: You are the project manager for an information technology di...
Question 2062: Your project sponsor has requested a cost estimate for the p...
Question 2063: You are the project manager at Construction Company, assigne...
Question 2064: Float is the amount of time an activity can be delayed witho...
Question 2065: Delegation may
Question 2066: Which of the following statements are FALSE regarding costre...
Question 2067: Which of the following is NOT an output of Monitor &amp; Con...
Question 2068: You are the project manger for Xylophone Phonics. It produce...
Question 2069: Which of the following statement are false regarding issue l...
Question 2070: Your project plan requires personnel to wear a Radiation Mon...
Question 2071: A project manager is planning the staffing levels that will ...
Question 2072: Providing information to stakeholders to inform them how res...
Question 2073: All of the following statements regarding Bidder conferences...
Question 2074: Which of the following statements are true regarding straigh...
Question 2075: Exhibit: Please refer to the exhibit. (Exhibit) You are a pr...
Question 2076: Which of the following fall(s) under the responsibilities of...
Question 2077: Which statement is FALSE about project manager?...
Question 2078: Each of the following statements is true regarding the risk ...
Question 2079: ____________ formalizes the acceptance of the project or pha...
Question 2080: Which of the following must not performed in the project ini...
Question 2081: How would you react as the project manager operating in a ma...
Question 2082: An Activity has an Optimistic estimate of 10 days, pessimist...
Question 2083: Which of the following is not a type of performance reportin...
Question 2084: The Project Manager has the responsibility of knowing what k...
Question 2085: All of the following are outputs of the close project proces...
Question 2086: Which of the following terms is used to describe the receipt...
Question 2087: You are the project manager for the manufacturer of children...
Question 2088: In a Weak Matrix organization, the role of a project manager...
Question 2089: Which of the following is a planning tool describing how the...
Question 2090: The zero defects concept
Question 2091: All of the following statements are true regarding decomposi...
Question 2092: Which of the following should be archived upon completion of...
Question 2093: A modification of a logical relationship that allows an acce...
Question 2094: You work for a furniture manufacturer. Your project is going...
Question 2095: Resource planning involves determining what ____________ res...
Question 2096: The concept of zero inventory is called:...
Question 2097: You are currently the project manager at a rapidly growing r...
Question 2098: Which of the following is configuration management activity ...
Question 2099: All of the following are true regarding the Quality Planning...
Question 2100: You are a project manager responsible for constructing a new...
Question 2101: A work breakdown structure is most useful for:...
Question 2102: The use of quality management tools is used to provide...
Question 2103: You are in process of identifying and documenting project ri...
Question 2104: You are a project manager at a real estate company that deve...
Question 2105: All of the following are benefits of meeting quality require...
Question 2106: Which of the following statements are FALSE regarding sensit...
Question 2107: You are in process of defining how to plan and execute the r...
Question 2108: A common way by which executives provide the project manager...
Question 2109: A Project with a total funding of $70,000 finished with a BA...
Question 2110: You are project manager and now in middle of creating RFP(Re...
Question 2111: One of your tasks as a project manager is to prepare a Scope...
Question 2112: The Java development of a project is outsourced to India. Th...
Question 2113: In optimal organization structure, the project manager is:...
Question 2114: Which quality management tool would be used to determine pot...
Question 2115: You are the project manager assigned to install the electric...
Question 2116: Which of the following can affect network durations?...
Question 2117: Management reserve is generally intended to be used to:...
Question 2118: Which of the following statements are FALSE?...
Question 2119: Variance analysis, trend analysis, and earned value techniqu...
Question 2120: Which of the following helps you identify the root cause of ...
Question 2121: All of the following are activities of the configuration man...
Question 2122: When choosing the most appropriate form of project organizat...
Question 2123: What is one of the problems with project management software...
Question 2124: A calendar that identifies when a project may be performed o...
Question 2125: Which project management process groups takes maximum time a...
Question 2126: Scope verification differs from quality control in that it i...
Question 2127: A team member is not performing well on the project because ...
Question 2128: There is a project with CPI = 0.81 and TCPI = 1.00001; this ...
Question 2129: A contractor is working on a fixed price contract that calls...
Question 2130: Risk event probability is defined as:...
Question 2131: Which of the following best describes this illustration? Exh...
Question 2132: Who should contribute to the development of the project plan...
Question 2133: Inspection of a complex project according to specifications ...
Question 2134: With respect to the earned value analysis, which of the foll...
Question 2135: You are managing a software engineering project, when two te...
Question 2136: Generally, when is the BEST time to create a procurement man...
Question 2137: You are in the process of defining the specific activities t...
Question 2138: Which of the activities have negative slack, given the table...
Question 2139: What should you as the project manager do in the event of re...
Question 2140: Core planning processes:
Question 2141: Which is not a technique for Sequence Activities?...
Question 2142: Which of the following is a configuration management activit...
Question 2143: Which is not output from Control Schedule:...
Question 2144: Which of the following statements describes the result of re...
Question 2145: Extensive use of ___ communication is MOST likely to aid in ...
Question 2146: Which of the following statements about decomposition is the...
Question 2147: All these statements about project charter are correct excep...
Question 2148: All of the statements regarding Planning Packages are true E...
Question 2149: A poorly defined staffing management plan will LEAST impact:...
Question 2150: A project manager uses a facilitator to gather opinions from...
Question 2151: Ouchi's Theory Z relates more to _____ whereas Theory X / Th...
Question 2152: Project termination responsibilities include all of the foll...
Question 2153: You are in the process of reviewing offers and choosing amon...
Question 2154: Standard deviation of project completion is _____ ....
Question 2155: Which of the following describes the assumptions made by the...
Question 2156: Implemented change request, implemented corrective actions a...
Question 2157: In which plan do you define the processes that will be used ...
Question 2158: Uncertainty refers to a situation where:...
Question 2159: Which of the following is not included in project scope stat...
Question 2160: You are in the implementation phase of a project. At this po...
Question 2161: During your assignment as project manager you add a new memb...
Question 2162: According to PMI, application areas are categories of projec...
Question 2163: How can a Process flow chart help in Quality management?...
Question 2164: All of the following are true regarding the Ishiwaka diagram...
Question 2165: Define Activities is typically performed by which of the fol...
Question 2166: All the following are true about Project Plan Execution exce...
Question 2167: A project manager should exhibit two types of leaderships. T...
Question 2168: Integrate Change Control includes the following activities E...
Question 2169: Which statement relating to Scope Verification and Quality c...
Question 2170: Which of the following is NOT one of the five project manage...
Question 2171: Which of the following statements are TRUE regarding the sco...
Question 2172: Project scope is:
Question 2173: Which of the following is NOT a function of a kick-off meeti...
Question 2174: As the project manager, you are preparing your methods for q...
Question 2175: When control charts are being used, outliers are......
Question 2176: You have been recently assigned to provide an accurate proje...
Question 2177: Receipt of bids or proposals and application of the evaluati...
Question 2178: According to the PMI, early termination of a contract is con...
Question 2179: What is not true for Change requests?...
Question 2180: You are managing an industrial design project for an importa...
Question 2181: You are a project manager for an agricultural supply company...
Question 2182: You are the project manager at a large accounting firm in th...
Question 2183: Which does not create changes to the Project Scope Statement...
Question 2184: The purpose of a quality audit includes all of the following...
Question 2185: Which of the following establishes the formal documentation ...
Question 2186: Parametric Estimating is done as a part of which process:...
Question 2187: Linear programming is an example of what type of project sel...
Question 2188: You are using three point estimating technique to estimate t...
Question 2189: You must produce 27 widgets. You can only produce 9 widgets ...
Question 2190: A fixed-price-plus-incentive-fee (FPI) contract has a target...
Question 2191: The tools and techniques of the Request Seller Responses pro...
Question 2192: Which of the following is not a characteristic of the Projec...
Question 2193: All of the following are tools/ techniques of the develop pr...
Question 2194: Coordinating a schedule, organizational policies, staffing p...
Question 2195: Present value measures
Question 2196: Which of the following methods will be MOST effective when d...
Question 2197: Which is not the tools and techniques used in Contract Admin...
Question 2198: According to PMI, application areas are categories of projec...
Question 2199: All of the following are elements of inputs of the Risk Iden...
Question 2200: Situational leadership as defined by Hersey and Blanchard co...
Question 2201: Tools and techniques of performance reporting include...
Question 2202: You are currently in the process of acquiring your project t...
Question 2203: A work package, scheduled for one year from today, will cost...
Question 2204: In your new company, you realize that some of the financial ...
Question 2205: Which of the following is NOT included in a schedule change ...
Question 2206: A project manager reported the following Earned value data: ...
Question 2207: A comprehensive definition of scope management would be:...
Question 2208: Configuration management activities included in the integrat...
Question 2209: You are running a project to engineer and implement a set of...
Question 2210: Which of the following types of power comes through the orga...
Question 2211: If you know expected value is 500 and the standard deviation...
Question 2212: Your project just completed, and one of your subcontractors ...
Question 2213: Which of the following statements are false regarding projec...
Question 2214: Which of the following statements are true regarding the pro...
Question 2215: A project manager and team from a firm that designs railroad...
Question 2216: With respect to value analysis which of the following is the...
Question 2217: A Work Berakdown Structure is most useful for:...
Question 2218: Which of the following factors are NOT included in cost cont...
Question 2219: Which of the following is not an output of the cost control ...
Question 2220: Quality function Deployment is a tool used to:...
Question 2221: Which of the following is true regarding NPV?...
Question 2222: Reserve analysis is a tool /technique in all of the followin...
Question 2223: You are the Chief Technology Officer of a major stock exchan...
Question 2224: Which of the following statements are FALSE regarding the ac...
Question 2225: CORRECT TEXT Monte Carlo simulation:...
Question 2226: As a leader, how should you deem Ethical conduct?...
Question 2227: Which of the following organizations has the best technical ...
Question 2228: Earned value is:
Question 2229: Parametric Modeling and Analogous Estimating are used in wha...
Question 2230: You are the project manger at a leading manufacturer of cons...
Question 2231: Phase exits, kill points and stage gates are used for what p...
Question 2232: The chances for successful completion of a multidisciplinary...
Question 2233: The tools and techniques used in the initiation process are:...
Question 2234: The compromise conflict resolution technique...
Question 2235: A contract where the buyer reimburses the seller for the cos...
Question 2236: You are project manager responsible for constructing a new s...
Question 2237: _______ is the most accurate Estimate Costs technique....
Question 2238: The risk register is initiated in the Risk Identification pr...
Question 2239: You are a contract project manager for a wholesale flower di...
Question 2240: A work authorization system can be used to:...
Question 2241: You are holding end-of-phase meetings with your team members...
Question 2242: Which of the following are valid ways to breakdown the work ...
Question 2243: Analogous estimating:
Question 2244: The scope statement provides
Question 2245: Which of the following factors has historically been the gre...
Question 2246: Which of the following is not an input to quality planning?...
Question 2247: All of the following statements are true EXCEPT:...
Question 2248: Reverse analysis is a tool/ technique in ll of the following...
Question 2249: Geert Hofstede's cultural dimension of Individualism refers ...
Question 2250: Which of the following is NOT a reason to measure variances ...
Question 2251: A company uses a management technique that employs quality a...
Question 2252: All of the following are considered schedule network analysi...
Question 2253: You are aware that an employee in your project may potential...
Question 2254: You are a project manager for a manufacturing firm that prod...
Question 2255: All of the following statements describe the activity list e...
Question 2256: You have collected the work performance information for your...
Question 2257: You are the project manager at a utility company. Due to the...
Question 2258: Which of the following choices indicates that a project has ...
Question 2259: You joined the company recently as a Project Manager. To fam...
Question 2260: What is the lowest level in a work breakdown structure?...
Question 2261: Which of the following is LEAST likely to improve the accura...
Question 2262: Scope verification is concerned with:...
Question 2263: You are in the process of controlling changes to project sch...
Question 2264: Which of the following compression techniques increases risk...
Question 2265: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 2266: In crashing a task, you would focus on:...
Question 2267: Project tradeoffs are usually made by comparing _____ and co...
Question 2268: An effective Project Manager does not share project _____ wi...
Question 2269: You are managing an accounting project when a new CFO is hir...
Question 2270: You are in charge of developing a new product for a bank. Yo...
Question 2271: Which of the following contracts has the MOST risk for the s...
Question 2272: A legally binding document offered unilaterally is a _____ ....
Question 2273: Which of the following is not true for a Responsibility Assi...
Question 2274: According to the PMI, which of the following are NOT true wi...
Question 2275: Characteristics of project phases are:...
Question 2276: You are in the process of translating project objectives int...
Question 2277: You are the project manager for Rivera Gourmet Adventure Vac...
Question 2278: Which of the following impacts the critical path?...
Question 2279: Which of the following best describes the conflict resolutio...
Question 2280: You are currently on a 3-week vocation in Australia. You've ...
Question 2281: Communication in both project and non-project-driven organiz...
Question 2282: You're holding a PMP training seminar for people in your com...
Question 2283: A staffing management plan includes all of the following exc...
Question 2284: Which of the following statements are FALSE regarding Herzbe...
Question 2285: Which of the following is an effective tool to observe trend...
Question 2286: Which of the following are included in the Acquisition phase...
Question 2287: Which of the following best describes risks that arise as a ...
Question 2288: The difference between a project and a program is that:...
Question 2289: The scope management provides:
Question 2290: Which of the following statements regarding WBS are true?...
Question 2291: Which of the following are Information Gathering Techniques ...
Question 2292: Risk mitigation is the process of _____ ....
Question 2293: In which of the following situations would the PERT method b...
Question 2294: You've been assigned as a project manager on a research and ...
Question 2295: Guidelines for estimating time durations include:...
Question 2296: Which of the following statements are FALSE regarding projec...
Question 2297: You are a project manager of ABC organization. There is two ...
Question 2298: What is the purpose of a decision tree?...
Question 2299: A poorly written detailed Project Scope Statement will impac...
Question 2300: Objectives can be described as all of the following except f...
Question 2301: All of the following statements regarding decision tree anal...
Question 2302: You are the project manager responsible for constructing new...
Question 2303: The highest degrees of project risk and uncertainty are asso...
Question 2304: The project management office is worried about the quality o...
Question 2305: You have a choice of accepting a fixed price contract for $1...
Question 2306: The functional organization is effective with a mature produ...
Question 2307: Keeping up with the growth was becoming a problem for a priv...
Question 2308: The primary source document for establishing the content of ...
Question 2309: Which of the following risk management processes are workaro...
Question 2310: The Critical Path Method of scheduling is:...
Question 2311: Which type of warranty is enacted if a service or product do...
Question 2312: The Change Control Board should be _______?...
Question 2313: The main objective of a Control Chart is to :...
Question 2314: All of the following situations will cause schedule activity...
Question 2315: Techniques for conducting product analysis include:...
Question 2316: You are the project manager and responsible for quality audi...
Question 2317: Which of the following is true about pure risk?...
Question 2318: Work Breakdown Structure is:
Question 2319: This process can directly influence the project schedule....
Question 2320: Which is the BEST definition of quality?...
Question 2321: You have completed the Information Distribution Process and ...
Question 2322: The purpose of lessons learned documentation, that is an out...
Question 2323: You are the project manager at a software company developing...
Question 2324: Operations and projects share many characteristics....
Question 2325: Procurements audits are a tool/ technique of which of the fo...
Question 2326: _____ is based on information gathered and analyzed about de...
Question 2327: As a result of a face-to-face meeting you recently had to di...
Question 2328: Project coordination is enhanced through progress reporting,...
Question 2329: You are managing a software project. You are partway through...
Question 2330: Using the data shown: TARGET COST: 12,000, TARGET FEE: 1000,...
Question 2331: Which of the following is used to maintain an index of contr...
Question 2332: Which of the following is included in activity duration esti...
Question 2333: Which of the following tool/ technique are unplanned respons...
Question 2334: You are the project manager of ABC organization. You have to...
Question 2335: Which of the following statements are FALSE regarding Expect...
Question 2336: A person's negotiating skills/temperament certainly are infl...
Question 2337: Product verification is usually performed in the closing pro...
Question 2338: Your company policy allow to gift exchange with customer wit...
Question 2339: The critical path is calculated by...
Question 2340: The initial document that formally recognizes the existence ...
Question 2341: If a project is being performed under contract, the product ...
Question 2342: The project manager has, as a prime responsibility, to assur...
Question 2343: Your project team consists of 12 people in the same building...
Question 2344: As a project is carried out and slack time is consumed on in...
Question 2345: Management usually determines the costs and schedule for a p...
Question 2346: Which of the following statements are FALSE regarding projec...
Question 2347: Which is not used to document team member roles and responsi...
Question 2348: You have been hired as a project manager for a small local b...
Question 2349: Power games, withholding information, and hidden agendas are...
Question 2350: Which of the following statements BEST describes a work auth...
Question 2351: Herzberg identified factors which, if present, will lead to ...
Question 2352: Which of the following process is involved in making needed ...
Question 2353: What is the main purpose of project initiation?...
Question 2354: The project management executing processes include all of th...
Question 2355: What is the purpose of the following diagram? Exhibit: (Exhi...
Question 2356: Where is work packages described?...
Question 2357: Which of the following statements are FALSE regarding Monte ...
Question 2358: Quality control charts show a characteristic of the product ...
Question 2359: During execution in a project to build a major road bridge, ...
Question 2360: Which of the following statements are true about the work br...
Question 2361: Trend Analysis is best described as:...
Question 2362: A project was assessed and the following Earned value data h...
Question 2363: As a PMP, you will be required to comply with the PMP Code o...
Question 2364: A period of time in work weeks which includes non-working da...
Question 2365: Your client informs that his company has a problem with the ...
Question 2366: Which of the following makes up the project scope baseline?...
Question 2367: Conflict resolution techniques that may be practiced on a pr...
Question 2368: Creation of project objectives:...
Question 2369: Which of the following best determines the amount of authori...
Question 2370: Which of the following is not provided by the framework of a...
Question 2371: You are just leaving a meeting, during which you have been a...
Question 2372: A program is characterized as:
Question 2373: Methods and techniques used to examine cost and technical da...
Question 2374: Decomposition is
Question 2375: You are a contract project manager working with the State of...
Question 2376: Resource Leveling is a technique for:...
Question 2377: You are a project manager for Dakota Software Consulting Ser...
Question 2378: In which of the following scope management processes is the ...
Question 2379: A document which describes how project scope will be managed...
Question 2380: You are a project manager for the Swirling Seas Cruises food...
Question 2381: You are currently in process of prioritizing risks by their ...
Question 2382: You are the project manager for a sewage treatment plant. Th...
Question 2383: Which of the following are outputs of the Risk Management Pl...
Question 2384: Which of the following is NOT a tool of the Scope Definition...
Question 2385: Maximum intensity of conflicts occur over:...
Question 2386: You have been recently hired to be a project manager at a bi...
Question 2387: Which of the following represents the base point of Maslow's...
Question 2388: The authority to accept or reject a requested change in a la...
Question 2389: Project trade-offs vary between...
Question 2390: Which of the following is NOT an output of the Manage Stakeh...
Question 2391: Which of the following statements are not true regarding cor...
Question 2392: What should be done by a project team in the event of a situ...
Question 2393: During which phase of the project life cycle is the amount a...
Question 2394: A project manager is asked to select a contract type for a n...
Question 2395: There are three projects: Project A has an investment of $ 3...
Question 2396: In most jurisdictions, a legally required order of formal st...
Question 2397: Five people are involved on a project that requires signific...
Question 2398: The actual configuration of a PERT/CPM network _____ the amo...
Question 2399: Which of the following statements regarding risk register is...
Question 2400: Quality is:
Question 2401: You are in the process of numerically analyzing the effects ...
Question 2402: Which of the following is not true for Resource Leveling:...
Question 2403: A program can best be described as:...
Question 2404: For a project to be successful, what is the primary requirem...
Question 2405: You are the project manager for Design Your Web Site, Inc. Y...
Question 2406: Which of the following are TRUE regarding Bidder conferences...
Question 2407: Which describe BEST for the stakeholders?...
Question 2408: A change has occurred on your project. You've documented the...
Question 2409: In which of the following project management process group c...
Question 2410: You are constructing a probability and impact matrix for you...
Question 2411: You are using the three-point estimating technique to estima...
Question 2412: The organization of the project is very important for succes...
Question 2413: An activity that consumes no time or resources and shows onl...
Question 2414: Your project team has completed the project work. All of the...
Question 2415: Which of the following are not inputs to the develop prelimi...
Question 2416: You are a project manager of ABC company and you are working...
Question 2417: Which of the following scheduling methods uses more of the r...
Question 2418: At least _____of the cost of quality are the direct responsi...
Question 2419: You've promised your team two days of paid time off plus a w...
Question 2420: Which of the following tools/techniques can be used to help ...
Question 2421: Which of the following statement about Project Planning Meth...
Question 2422: You finished your project for a customer to implement a busi...
Question 2423: Which of the following represents a hierarchically organized...
Question 2424: What is the difference between management reserves and conti...
Question 2425: For a given characteristic in a construction process, the st...
Question 2426: In an organization, project managers report directly to the ...
Question 2427: Formal written correspondence is mandated in which of the fo...
Question 2428: A Project Status Report would include all of the following e...
Question 2429: A Project Manager must have good understanding of the mechan...
Question 2430: Please select which of the following statements is TRUE rega...
Question 2431: You are in the process of identifying and documenting risk p...
Question 2432: You are in the process of obtaining the necessary human reso...
Question 2433: Your project terminated early due to budget cuts. You' like ...
Question 2434: The most common definition of project success is:...
Question 2435: In which process would you be most likely use variable [or a...
Question 2436: Which of the following are false regarding corrective action...
Question 2437: Which of the following statement are false regarding Delphi'...
Question 2438: Benchmarking is a common tool used for:...
Question 2439: You are in the process of completing and selling each contra...
Question 2440: The auditing function that provides feedback about the quali...
Question 2441: Statistically independent The contractual statement of work ...
Question 2442: In which of the following processes in the initial process g...
Question 2443: A _______ is a series of actions bringing about a result....
Question 2444: Assumptions analysis, checklist analysis, and risk diagrammi...
Question 2445: CORRECT TEXT All of the following statements are true regard...
Question 2446: In which project management process group; project charter i...
Question 2447: You are taking over a project from another project manger du...
Question 2448: A(n) _____ is defined as a specified accomplishment in a par...
Question 2449: A contract is legally binding and must comprise all but one ...
Question 2450: A risk response which involves eliminating a threat is calle...
Question 2451: Which of the following does NOT assess the value a project b...
Question 2452: The delphi Method is best suited for:...
Question 2453: You are in the process of reviewing offers and choosing amon...
Question 2454: Which is not a negotiation tactic?...
Question 2455: You monitored figures on cost and planned/earned value for e...
Question 2456: You are a project manager for a company that sells online mu...
Question 2457: You are the project manager on a construction project. As yo...
Question 2458: Which of the following types of cost are relevant to making ...
Question 2459: What are the five project management process groups, in orde...
Question 2460: You are managing a construction project to install wiring in...
Question 2461: You are a project manager responsible for constructing a new...
Question 2462: Which project selection methods are use only in certain type...
Question 2463: Reasons for changing the staffing management plan include al...
Question 2464: All of the following are sources of conflict EXCEPT:...
Question 2465: Which of the following are not tools/ techniques of Manage S...
Question 2466: A(n) _____ system is designed to ensure the timely availabil...
Question 2467: Which of the following is not a process of Project Communcat...
Question 2468: An example of coercive power would be:...
Question 2469: The amount of authority a project manager possesses can be r...
Question 2470: Which of the following s most likely to require a rebaselini...
Question 2471: Control Costs is concerned with:...
Question 2472: Risk diagramming techniques include all of the following EXC...
Question 2473: _____________ involve(s) coordinating people and other resou...
Question 2474: Risk event is the precise description of what might happen t...
Question 2475: Which of the following areas are addressed in risk identific...
Question 2476: You do not expect the types of variances that have occurred ...
Question 2477: A project manager on a construction project includes a line ...
Question 2478: You are a project manager for Pizza Direct, which is a retai...
Question 2479: Which theory(s) prescribes a form of participative managemen...
Question 2480: Which of the following best describes the following organiza...
Question 2481: During the opening rounds of contract negotiation, the other...
Question 2482: All of the following are true regarding the Qualitative Risk...
Question 2483: In which of the following contract types is it easier to cha...
Question 2484: You are in the process of identifying and documenting the lo...
Question 2485: Which of the following processes is in the Initiating proces...
Question 2486: The person in the organization that authorizes the commencem...
Question 2487: All of the following scheduling techniques account for resou...
Question 2488: A process has Critical path of 12 days &amp; Standard Deviat...
Question 2489: You are the project manager for an information technology di...
Question 2490: You are managing an internationally dispersed project team. ...
Question 2491: Which is generally the least accurate....
Question 2492: One way to shorten your project schedule is to assign three ...
Question 2493: You are the manager of a major project to develop a system o...
Question 2494: Inputs to overall change control include all of the followin...
Question 2495: You are in process of reviewing all change requests and cont...
Question 2496: What is best used to calculate the profit from an internal p...
Question 2497: Affinity diagrams are used to:
Question 2498: You've identified a risk event on your current project that ...
Question 2499: You are the project manager for a new software development p...
Question 2500: You have been recently assigned to provide an accurate proje...
Question 2501: A project manager can exchange information with the project ...
Question 2502: A project manager you are mentoring comes to you for help be...
Question 2503: From a buyer's standpoint, which of the following is true?...
Question 2504: The key purpose of project control is to:...
Question 2505: One of your friends is project manager in Telecommunication ...
Question 2506: Earned value measurement is an example of:...
Question 2507: You are a fabulous project manager, and your team thinks hig...
Question 2508: You are in the process of controlling changes to the project...
Question 2509: During which of the following phases is a project's scope st...
Question 2510: What are the inputs to the Develop Project Charter process?...
Question 2511: Stock options, assigned parking spaces and a company car are...
Question 2512: Which of the following statements are FALSE regarding sensit...
Question 2513: To make an informed decision about buying insurance, the pro...
Question 2514: What are the inputs to project Plan Execution?...
Question 2515: Variables quality data are:
Question 2516: Three-point estimates are based on determining three types o...
Question 2517: What impact does a matrix organization have on project team ...
Question 2518: The Time Management Process that involves identifying and do...
Question 2519: Which is not an activity included in the Integrated change c...
Question 2520: Obtaining information from prospective sellers on how projec...
Question 2521: A graphical display of accumulated costs and labor hours for...
Question 2522: You are the project manager for Heartthrobs by the Numbers D...
Question 2523: Japanese resource management models exhibit....
Question 2524: A negative result from an SV calculation means which of the ...
Question 2525: Your hardware vendor left you a voicemail saying that a snow...
Question 2526: One way contract closure differs from administrative closure...
Question 2527: Which of the following statements best describes the respons...
Question 2528: A set of manual files made available to all team members is ...
Question 2529: In the closing phase of your project, a number of administra...
Question 2530: You are responsible for ensuring that your seller's performa...
Question 2531: Risks that may affect the project can be identified and orga...
Question 2532: You are a project manager for a telecommunications firm. You...
Question 2533: Which type of process involves the agency holding discussion...
Question 2534: The ability to get an individual or group to perform a given...
Question 2535: A scope change control defines the procedures by which the p...
Question 2536: You are giving your team instructions on how to perform a ne...
Question 2537: When should the Project schedule be developed?...
Question 2538: What two main knowledge areas are not listed in the executio...
Question 2539: Which of the following statements are FALSE regarding config...
Question 2540: A project customer and a contractor agreed on regular Qualit...
Question 2541: Project Plan includes:
Question 2542: You are in the process of reviewing all change requests and ...
Question 2543: Making need information available to project stakeholders in...
Question 2544: People are motivated by the need for achievement, power, or ...
Question 2545: A project may be defined as _____...
Question 2546: You are the project manager for a custom home-building const...
Question 2547: What is the purpose of the project charter?...
Question 2548: Fast-tracked projects awarded and begun before all planning ...
Question 2549: Sources for data on activity durations and resource requirem...
Question 2550: Your project team is on its way to finish work on the projec...
Question 2551: A project manager is creating a risk response plan. However,...
Question 2552: Japanese quality control has improved dramatically in the la...
Question 2553: The terms of union contracts are considered ______________ i...
Question 2554: Milestones are best characterized by which description?...
Question 2555: Which of the following is not an input to the Quality Contro...
Question 2556: According to James P. Lewis, which of the following is not p...
Question 2557: You are project manager and now you are middle of comparing ...
Question 2558: The outcome that must be produced to complete a part of a pr...
Question 2559: You are the project manager for a project. While reviewing t...
Question 2560: The positive value of conflict is underestimated. Properly m...
Question 2561: At the close of your project, you measure the customer satis...
Question 2562: Which of the following processes involves analyzing activity...
Question 2563: All the following statements are true about Analogous Estima...
Question 2564: The identification, definition, and selection of the project...
Question 2565: What should project managers focus on when they perform the ...
Question 2566: Qualitative risk analysis requires accurate data as its inpu...
Question 2567: According to
Question 2568: You are the project manager responsible for developing a new...
Question 2569: What is the lowest level in a work breakdown structure?...
Question 2570: Your company has asked you to be the project manager for the...
Question 2571: When all customer requirements for the product of the projec...
Question 2572: Which of the following statements are true?...
Question 2573: Which of the following statements are true regarding the cri...
Question 2574: Your project sponsor has asked you to produce a Risk Managem...
Question 2575: Which of the following describes a group of elated schedule ...
Question 2576: When should a risk be avoided?
Question 2577: You are in the process of directing the performance of plann...
Question 2578: A facilitator should...
Question 2579: Joe is an excellent programmer. He was promoted to a role of...
Question 2580: Which of the following is not an example of project integrat...
Question 2581: Which of the following statements BEST describes what projec...
Question 2582: You are the Chief Technology Officer of a major stock exchan...
Question 2583: Which of the following statements depicts the key difference...
Question 2584: The way a project manager sends and receives information dep...
Question 2585: At what stage of a project does the development of a cohesiv...
Question 2586: You are the project manager for a company that sells online ...
Question 2587: Most quality problems:
Question 2588: You are in the process of directing the performance of the p...
Question 2589: During project implementation the client interprets a clause...
Question 2590: The project schedule is not used to determine...
Question 2591: You are the project manager for a top-secret software projec...
Question 2592: Which of these types of matrix structure gives the project m...
Question 2593: A company is considering an investment of $80,000 at the pre...
Question 2594: You've decided to try your hand at project management in the...
Question 2595: You are a project manager for Star Light Strings. Star Light...
Question 2596: You are the project manager for Changing Tides video games. ...
Question 2597: You are the project manager within and information technolog...
Question 2598: A project manager believes that modifying the scope of the p...
Question 2599: The use of the project reports:...
Question 2600: If you are the project manager for a new project. You have c...
Question 2601: In communications management, to assimilate through the mind...
Question 2602: Which of the following statements are FALSE regarding the CP...
Question 2603: You have been recently assigned to provide an accurate proje...
Question 2604: Contract documentation are an input to the contract closure ...
Question 2605: All of the following are components of Project Integration M...
Question 2606: You are a project manager working on a software development ...
Question 2607: Sunk costs are:
Question 2608: Inputs to quality planning include...
Question 2609: Which of the following is not a typical reason for authorizi...
Question 2610: You are the project manager at information technology divisi...
Question 2611: You are about to begin negotiations with people from another...
Question 2612: All of the following should be included in the initial staff...
Question 2613: The utility of a risk seeker is:...
Question 2614: A project manager has just been assigned to a new project an...
Question 2615: You are the project manager within and information technolog...
Question 2616: Which of the following statements are true regarding Managem...
Question 2617: For every situation, several methods usually exist for effec...
Question 2618: Which of the following processes involves ensuring that risk...
Question 2619: Which of the following is NOT typically found in a project c...
Question 2620: Activity attributes identify multiple attributes associated ...
Question 2621: You are managing a project to develop nutritional soda for t...
Question 2622: Which of the following best describes the process of identif...
Question 2623: You are the project manager for the Late Night Smooth Jazz C...
Question 2624: Which of the following best describes decomposition?...
Question 2625: You are the project manager for a large construction project...
Question 2626: The quality objectives are approved in the conceptual stage ...
Question 2627: Which percent of the total project labor hours are typically...
Question 2628: Which statement relating to Core Processes and Facilitating ...
Question 2629: Which of the following Cost Management processes are concern...
Question 2630: Scheduling systems such as PERT, ADM, and PDM are project ma...
Question 2631: Identification of Mandatory Dependencies is done during whic...
Question 2632: Which devises and maintains a worktable scheme to accomplish...
Question 2633: What is the relative priority of project Cost, Schedule and ...
Question 2634: The main player in project communication is the...
Question 2635: The cost of a quality program should be budgeted at _____ of...
Question 2636: You are a project manager for Giraffe Enterprises. You've re...
Question 2637: Contracts may be called
Question 2638: Management By Objectives assumes that the team:...
Question 2639: Which of the following statements most accurately describes ...
Question 2640: Being the project manager in a software project which is cur...
Question 2641: Which equation correctly illustrates the cost variance of a ...
Question 2642: Which of the following is not an input into solicitation pla...
Question 2643: According to the PMBOK Guide, the project statement of work ...
Question 2644: A _____ estimate prepared from layouts, sketches and flowshe...
Question 2645: Without a _______ the project cannot start....
Question 2646: All the following are conflict resolution modes except:...
Question 2647: You are a project manager for Bluebird Technologies. Bluebir...
Question 2648: What is necessary to check whether the scope of the project ...
Question 2649: When your objective is to get a lasting win-win solution to ...
Question 2650: In project communications, the sender is responsible for:...
Question 2651: You are in the process of defining the specific activities t...
Question 2652: Which of the following statements regarding project charter ...
Question 2653: Product Reviews, Audits and walk-throughs are performed as p...
Question 2654: The most rapid Estimate Costs technique is:...
Question 2655: Which question is not appropriate for a weighting system to ...
Question 2656: Please refer to the diagram below: (Exhibit) Task1 -&gt; Tas...
Question 2657: What are the four parts of the communications model?...
Question 2658: Which process group includes processes used to formally term...
Question 2659: If a project has an 80% chance of having the scope defined b...
Question 2660: Contract file and formal acceptance and closure are outputs ...
Question 2661: What is the purpose of dummy actvity in an activityon-arrow ...
Question 2662: Your customer ask for a small change in the project, which w...
Question 2663: Hertzberg proposed that the satisfaction and dis-satisfactio...
Question 2664: Which of the following statements are TRUE regarding various...
Question 2665: Which of the following brings together a set of tools and te...
Question 2666: All of the following statements are true regarding ground ru...
Question 2667: Key stakeholders on every project do not include...
Question 2668: What are you likely to see as a project progresses in a sche...
Question 2669: What are correspondence, contract changes, and payment reque...
Question 2670: A WBS can be used foe all of the following EXCEPT:...
Question 2671: The members of your project team have been assigned to your ...
Question 2672: Company expenses such as auditing costs, supervision, office...
Question 2673: Inspections are a tool of perform quality process. They may ...
Question 2674: You are the project manager in the I.T department of the loc...
Question 2675: Which of the following project communication management proc...
Question 2676: While creating the agenda for a status meeting with the team...
Question 2677: Which of the following statements about the cost of quality ...
Question 2678: Which of the following is best for handling cross functional...
Question 2679: Which of the following best describes the following organiza...
Question 2680: An individual who is still working on the satisfaction of ph...
Question 2681: You are the project manager within an information technology...
Question 2682: You have been promoted to Manager, Continuous Process Improv...
Question 2683: Which of the following can the project manager use as a mean...
Question 2684: Good project objectives must be:...
Question 2685: You are the project manager at the Historie Shoppe, a rapidl...
Question 2686: Which of the following best describes the following organiza...
Question 2687: The risk management plan is a subset of the project manageme...
Question 2688: Quality audits when preformed correctly will provide the fol...
Question 2689: Which is not part of the purchasing cycle?...
Question 2690: Who has MOST of the power in projectized organization?...
Question 2691: To manage risks in your project, and communicate with stakeh...
1 commentQuestion 2692: You are the Chief Technology Officer of a major stock exchan...
Question 2693: Your project depends on a key deliverable from a vendor you'...
Question 2694: Which of the following are not common Barriers to project te...
Question 2695: After a status meeting, one of your team members, John, pull...
Question 2696: The detailed project scope statement includes all of the fol...
Question 2697: Which of the following is NOT included in the quality manage...
Question 2698: The proposal manager of your company approached you recently...
Question 2699: The standard types of communication include all but...
Question 2700: All the following statements relating to Cost Management Pla...
Question 2701: You are the project manager fro the large children's toy man...
Question 2702: Which of the following statements are true regarding the Exp...
Question 2703: The concept of the ______________ states that changes relate...
Question 2704: Projects can be authorized for all the following reasons exc...
Question 2705: You have been hired as a contract project manager for Grapev...
Question 2706: You r the project manager at a large accounting firm in the ...
Question 2707: A completion of a local government study resides on your cri...
Question 2708: You are the project manager within an information technology...
Question 2709: Which of the following is the MOST valuable result of creati...
Question 2710: Management reserves are normally defined as a % of the total...
Question 2711: Which is generally not regarded as one of the three categori...
Question 2712: It is useful to conduct project risk assessment according to...
Question 2713: Including the customer in the process of project planning is...
Question 2714: Reserve Analysis technique NOT used during __________....
Question 2715: Which of the following are not situations where pre-assignme...
Question 2716: Which of the following are NOT outputs of the Activity Durat...
Question 2717: Which of the following best describes a conflict resolution ...
Question 2718: 100 % inspection of output is:
Question 2719: Which of the following is true about the WBS...
Question 2720: You are the project manager at information technology divisi...
Question 2721: You are project manager at a construction company who is wor...
Question 2722: You are the project manger at a utility company. Due to the ...
Question 2723: Schedule model data, which is an output of the schedule deve...
Question 2724: Which of the following processes is involved with identifyin...
Question 2725: A key to successful Management by Objectives (MBO) is...
Question 2726: You've identified a risk event on your current project that ...
Question 2727: The project management execution processes include all of th...
Question 2728: Decision models used in project initiation include:...
Question 2729: You are a project manager of ABC company. You have created t...
Question 2730: Which of the following is referred to as sunk cost:...
Question 2731: You are in the process of identifying and documenting the pr...
Question 2732: The erection of foundation formwork before the placement of ...
Question 2733: A project management professional can compare earned value p...
Question 2734: Which is not a point used for Three-point estimation?...
Question 2735: You are a project manager of ABC company. You are currently ...
Question 2736: You are the project manager at a large construction company....
Question 2737: Your team has identified the risks on the project and determ...
Question 2738: Your company, Kick That Ball Sports, has appointed you proje...
Question 2739: Line of balance charts are used most frequently in:...
Question 2740: In the arrow diagramming method (ADM), _____ do not consume ...
Question 2741: At what point in the project is there the most risk of proje...
Question 2742: What happens if the level of conformance directly increases ...
Question 2743: You are responsible for the communication controls for the G...
Question 2744: You are in the process of monitoring the various project pro...
Question 2745: Activity definition inputs include all except:...
Question 2746: You are a project manager working on gathering requirements ...
Question 2747: All of the following statements are true regarding the cost ...
Question 2748: Fixed-price and incentive-type contracts place responsibilit...
Question 2749: The inputs to Cost Budgeting includes all of the following e...
Question 2750: Cost Budgeting is defined as:
Question 2751: Which of the following statement regarding competitive metho...
Question 2752: One of your friends is a project manager at a computer secur...
Question 2753: You are the project manager at a company developing an onlin...
Question 2754: Which of the following is or are a part of Solicitation proc...
Question 2755: Some of the functions of this process include describing the...
Question 2756: Reserve Analysis involves:
Question 2757: Project management provides organizations with a methodology...
Question 2758: Design of experiments is an analytical technique which helps...
Question 2759: A cost-plus-percentage-cost (CPPC) contract has an estimated...
Question 2760: Which of the following factors has the most impact on the co...
Question 2761: A program is defined in the PMBOK as:...
Question 2762: The most important criteria in selecting project selection m...
Question 2763: You are the project manager responsible for developing a new...
Question 2764: Which statement describes best handling of assumptions durin...
Question 2765: You receive 25 new computers from the seller, but were expec...
Question 2766: What is not a major benefit of co-locating team members from...
Question 2767: Which of the following BEST describes the contents of a WBS ...
Question 2768: Which of the following statements are true regarding the SPI...
Question 2769: Qualitative risk analysis requires accurate data as its inpu...
Question 2770: What is commonly the purpose of the Manage stakeholders proc...
Question 2771: Which of the following is NOT part of the Contract Closure p...
Question 2772: The primary function of the Closing processes is to perform ...
Question 2773: In dealing with the client/customer, the project manager sho...
Question 2774: Free float is the amount of time that an activity may be del...
Question 2775: You are in the process of creating a project plan for the la...
Question 2776: Activity A has a duration of 3 days and begins on the mornin...
Question 2777: Dennis works for an international manufacturer of consumer e...
Question 2778: You are a project manager at java ice cream factory. You are...
Question 2779: There is project with CPI of 0.81 and TCPI=1.00001 this proj...
Question 2780: A Pareto diagram can be best described as:...
Question 2781: You are in the process of directing the performance of plann...
Question 2782: Your nonprofit organization is preparing to host its first a...
Question 2783: All of the following can be used to reduce the amount of con...
Question 2784: A project manager for a small construction company has a pro...
Question 2785: Which of the following statements are TRUE regarding the dif...
Question 2786: Projects frequently do not meet customer expectations from w...
Question 2787: Which of the following statements are FALSE regarding the Re...
Question 2788: Reaching an understanding of concessions is accomplished in ...
Question 2789: A process characteristic has a true mean of 150 and a true s...
Question 2790: A network diagram that uses nodes to represent activities an...
Question 2791: Project managers must know:
Question 2792: Your project is coming to an end, and you are in the process...
Question 2793: All of the following are outputs of the Risk Monitoring and ...
Question 2794: Which ensures that project objectives are met by monitoring ...
Question 2795: What is the foundation for team development?...
Question 2796: You are the project manager for Heartthrobs by the Numbers D...
Question 2797: Which of the following best describes progressive elaboratio...
Question 2798: Over the life cycle of the project, the quality of informati...
Question 2799: Under the terms of 2/10 net 30, the buyer may:...
Question 2800: Planning components are tools of activity definition process...
Question 2801: Filling vacant positions by recruiting within the organizati...
Question 2802: You are preparing project performance appraisals and have de...
Question 2803: How much time does the typical project manager spend communi...
Question 2804: You have just been given a new project and are creating the ...
Question 2805: Response Planning is the responsibility of the functional ar...
Question 2806: An example of a project is:
Question 2807: You are the project manager working on a research project fo...
Question 2808: When referring to inputs for schedule development, responsib...
Question 2809: What does one call the person responsible for the funding fo...
Question 2810: An output of the scope change control process is:...
Question 2811: Which of the following describes the cost of quality associa...
Question 2812: The project manager should be assigned ___________ as an out...
Question 2813: The major reason why a project manager would use written ins...
Question 2814: Using "I" or "My' instead of "most people" or "our group" __...
Question 2815: You are a contract project manager working with the State of...
Question 2816: Which of the following might require rebaselining of the cos...
Question 2817: Which of the following is not an input into procurement plan...
Question 2818: Which of the following is an input to the information distri...
Question 2819: Product verification is usually performed in closing process...
Question 2820: Which of the following contracts has the MOST risk for the b...
Question 2821: Which of the following statements are not true?...
Question 2822: Which of the following statements are true regarding the pro...
Question 2823: Middle (functional) managers have the greatest influence in ...
Question 2824: Your client, with which you have good relations, wants you t...
Question 2825: The risk management plan us a major component of...
Question 2826: Which of the following is NOT an indirect cost?...
Question 2827: In which of the following documents will you find specific p...
Question 2828: Which of the following is least likely to be a source of con...
Question 2829: You are a project manager for the manufacture of children's ...
Question 2830: Which of the following estimates would MOST accurately refle...
Question 2831: Inputs to Team Development include all except...
Question 2832: You are a project manager at a real estate company that deve...
Question 2833: Risk diagramming techniques include all of the following exc...
Question 2834: You've been hired as manager to design and construct a new c...
Question 2835: You are a project manager at a historic Shoppe, a rapidly gr...
Question 2836: Team motivation, problem resolution, and space verification ...
Question 2837: As part of your project team's quality control procedures, y...
Question 2838: Which of the following is NOT a tool or technique of Qualita...
Question 2839: All of the following statements are TRUE regarding ground ru...
Question 2840: Your current project has over 200 specs, 350 engineering dra...
Question 2841: Which of the following options is irrelevant to the resource...
Question 2842: A risk impact scale that uses rank-ordered values as very lo...
Question 2843: You are a project manager at a real estate company that deve...
Question 2844: An ad hoc group that discusses variances to the baselines, a...
Question 2845: If the message is very complex, the best method that can be ...
Question 2846: The formalization of management's attitude toward risk is ca...
Question 2847: You are a project manager for an international marketing fir...
Question 2848: Which process recognizes that a project or phase should begi...
Question 2849: You took over a customer project for your company. From the ...
Question 2850: Approved corrective actions are an input to which process?...
Question 2851: The time phased budget that is used to measure and monitor c...
Question 2852: You are the Project Manager for a construction project. Your...
Question 2853: The process of interpreting a message is:...
Question 2854: Your project schedule has slipped by 2 weeks, and you have t...
Question 2855: The project stakeholders should be actively involved with th...
Question 2856: A work breakdown structure is a:...
Question 2857: Which of the following are inputs to the Source Selection Pr...
Question 2858: Which of the following project quality management process is...
Question 2859: The Estimate At Completion (EAC) can be used to forecast the...
Question 2860: In which stage of the negotiation meeting are points of conc...
Question 2861: Your project is in the final test stage, the user acceptance...
Question 2862: While reviewing project performance, the project manager det...
Question 2863: What percentage of sales is estimated to be the cost of non-...
Question 2864: Subject matter experts are resources that can provide very v...
Question 2865: Historical record from previous project are generally used f...
Question 2866: Which of the following is true regarding schedule variances?...
Question 2867: Which of the following statements concerning acceptance samp...
Question 2868: Who has more control in a strong matrix organization?...
Question 2869: Which conflict resolution technique is most effective?...
Question 2870: You are the project manager at a large accounting firm in th...
Question 2871: As part of your project plan you must develop an effective m...
Question 2872: Your team has identified a risk with some of the chemicals y...
Question 2873: Which organization, the project manager has total control of...
Question 2874: You are the project manager at a utility company. Due to the...
Question 2875: A project manager in a predominantly hierarchical organizati...
Question 2876: Which of the following best characterizes Six Sigma?...
Question 2877: Using the PMBOK definition of contingency reserve, which of ...
Question 2878: A variance envelope has been established on a project. The e...
Question 2879: You are working on a project that will upgrade the phone sys...
Question 2880: In a matrix organization, the team members are responsible t...
Question 2881: Integrated change control includes the following activities ...
Question 2882: Which of the following is illustrated by a resource histogra...
Question 2883: Please refer to the exhibit. You have been recently assigned...
Question 2884: What is not among the tools and techniques of Organizational...
Question 2885: During your project meeting, a problem was discussed, and a ...
Question 2886: There are likely to be team loyalty issues in a matrixed env...
Question 2887: The computation for Cost Performance Index is:...
Question 2888: Which of the following statement is FALSE about progressive ...
Question 2889: Which of the following tools and techniques are commonly use...
Question 2890: What is the primary motivational tool of quality Theory X?...
Question 2891: When comparing the cost of competing projects, which of the ...
Question 2892: You are the project manager responsible for developing a new...
Question 2893: In order to achieve long-term quality improvements, manageme...
Question 2894: A fixed-price-plus-incentive-fee (FPI) contract has a target...
Question 2895: Which of the following is NOT one of the triple constraints?...
Question 2896: You are the project manager at a manufacturer of electronic ...
Question 2897: You have been assigned to a project in which the objectives ...
Question 2898: All of the following are outputs of the scope definition pro...
Question 2899: You are the project manager at a large automaker in Japan. Y...
Question 2900: Which of the following are not the direct result of managing...
Question 2901: Which of the following are least found to as a part of proje...
Question 2902: A parametric modeling technique will be accurate in predicti...
Question 2903: All of the following are true of Pareto diagrams except...
Question 2904: Risks that cannot be identified or evaluated _____ ....
Question 2905: You are the project manager for a software development proje...
Question 2906: Which is not a goal in both Project management and Quality m...
Question 2907: ___________ coordinates people and other resources to carry ...
Question 2908: All of the following are he benefits of using WBS except:...
Question 2909: Over half of conflicts on projects are caused by:...
Question 2910: Which document is developed along the risk management proces...
Question 2911: Which of the following is NOT a part of the preliminary scop...
Question 2912: You are a project manager responsible for constructing a new...
Question 2913: Which of the following is indicative of negative float?...
Question 2914: Resource leveling will often affect the project by making it...
Question 2915: Which conflict resolution style emphasizes agreement rather ...
Question 2916: All of the following are environmental factors that should b...
Question 2917: Which of the following is an input to Cost Estimating?...
Question 2918: Of the following, who has the ultimate responsibility for me...
Question 2919: Using the information provided, if a project manager require...
Question 2920: Every status meeting should have time allotted for Risk Moni...
Question 2921: In which process do you create the Risk Breakdown Structure?...
Question 2922: Project life cycles provide a better means of measurement of...
Question 2923: Which of the following statements are false regarding contra...
Question 2924: Screening of risk events for potential risk is known as ____...
Question 2925: ___________ must be measured regularly to identify variance ...
Question 2926: Which technique would you apply to control the project sched...
Question 2927: You are conducting a status meeting and monitoring your risk...
Question 2928: For communication to occur, there must be:...
Question 2929: The project manager and project sponsor are discussing the p...
Question 2930: According to Herzbergs theory, all the following are motivat...
Question 2931: Keeping up with the growth was becoming a problem for a priv...
Question 2932: What is not true for project deliverables?...
Question 2933: Which of the following is true concerning evaluation criteri...
Question 2934: Your project involves the research and development of a new ...
Question 2935: Project Stakeholder are:
Question 2936: A work authorization system is:...
Question 2937: Which is not a part of the project cost baseline but is incl...
Question 2938: Which of the following is an output of Define Scope?...
Question 2939: You are a project manager for Laurel's Theater Productions. ...
Question 2940: As a project manager on a software development project you a...
Question 2941: Approval to proceed is normally made at the end of the _____...
Question 2942: You are in process of completing and settling each contract ...
Question 2943: You are the project manager for a construction company that ...
Question 2944: Activity cost estimates and its supporting details are outpu...
Question 2945: Communication plays a major role in:...
Question 2946: Projects may be chartered by all of the following bodies, ex...
Question 2947: Consider the following situation: The customer was given a m...
Question 2948: Communication Planning involves determining the information ...
Question 2949: Performing the administrative closure process includes all o...
Question 2950: With respects to the cost of quality, which of the following...
Question 2951: Change requests can occur due to:...
Question 2952: Employee unions would most likely satisfy which level in Mas...
Question 2953: All of the following statements are true regarding the ADM m...
Question 2954: You are a project manager for Cinema Snicker Productions. Yo...
Question 2955: Tom is a project manager on an industrial design project. He...
Question 2956: Activities with zero time duration are referred to as:...
Question 2957: Which of the following statements are TRUE regarding various...
Question 2958: Which of the following are NOT benefits of meeting quality r...
Question 2959: You are in process of developing an approved project schedul...
Question 2960: Administrative closure procedure for a project phase does no...
Question 2961: Standard of purchased material:...
Question 2962: Which of the following is NOT included in activity duration ...
Question 2963: When should a project manager be assigned to a project?...
Question 2964: Which of the following statements is true regarding Close Pr...
Question 2965: Which of the following is an output of Direct and Manage Pro...
Question 2966: During a post-mortem meeting, discussions come up who has to...
Question 2967: As project manager, you prepare written input to the perform...
Question 2968: Which of the following statements is MOST true regarding Act...
Question 2969: You are a project manager working on a new software product ...
Question 2970: You are a project manager for the manufacture of children's ...
Question 2971: In which of the following circumstances is it BEST to make u...
Question 2972: You are the project manger of a software project. Two develo...
Question 2973: During what Time Management Process are the specific activit...
Question 2974: Which of the following is NOT considered an organizational p...
Question 2975: Which of the following are technical staffs particularly res...
Question 2976: You have just completed Qualitative Risk Analysis of the pro...
Question 2977: You are using a Pareto chart to examine the defects that hav...
Question 2978: The CFO wants to know how the project is going. You put toge...
Question 2979: What is one of the KEY objectives during contract negotiatio...
Question 2980: You are the project manager for a top-secret software projec...
Question 2981: Which of the following types of contracts requires the great...
Question 2982: The swiftest and most effective communications take place am...
Question 2983: You are a project manager at a biotech company, where you ar...
Question 2984: Which of the following is not an organizational policy consi...
Question 2985: Your hardware vendor left you a voicemail saying that a snow...
Question 2986: You have been hired by a contractor, who wants you to manage...
Question 2987: All of the following are tools and techniques of the Contrac...
Question 2988: The difference between the BCWS and the BCWP is referred to ...
Question 2989: Which of the following describes the assumptions made by the...
Question 2990: You are considering whether to buy or make a software produc...
Question 2991: You are the project manager for developing a next-generation...
Question 2992: Which of the following is formalized document that authorize...
Question 2993: Which of the following are NOT parts of the PMI professional...
Question 2994: Your friend Robert has recently achieved his PMP certificati...
Question 2995: Which of the following statements are FALSE regarding Projec...
Question 2996: Which of the following questions is a functional Manager mos...
Question 2997: Project Managers have least power in which organization stru...
Question 2998: The activity list should include descriptions of activities....
Question 2999: Which of the following is NOT an output of the Close Project...
Question 3000: Which method of conflict resolution tends to be the most eff...
Question 3001: What would be the cost performance index if BCWP =350, ACWP ...
Question 3002: Managerial Reserves are:
Question 3003: A WBS is an input to all of the processes EXCEPT:...
Question 3004: You are currently in the process of analyzing activity seque...
Question 3005: You have been hired as a project manager for a local bank. B...
Question 3006: A team that is just forming needs:...
Question 3007: You are the project manager of a company that is building AT...
Question 3008: What is typical for high-context cultures?...
Question 3009: You are a project manager for a company that sells online mu...
Question 3010: What is critical path?
Question 3011: A management control that rarely changes, and then only in r...
Question 3012: _____ is a receipt issued by a carrier for merchandise to be...
Question 3013: Your company manufactures small kitchen appliances. It is in...
Question 3014: You are running a major project with four sub-projects. Each...
Question 3015: Quality may be defined as:
Question 3016: Which of the following BEST describes when you perform the M...
Question 3017: All of the other alternatives apply Which of the following s...
Question 3018: CORRECT TEXT You have been recently hired to be a project ma...
Question 3019: You are approximately 30% through your project and the spons...
Question 3020: Which of the following statements are true regarding project...
Question 3021: Project files, project software, and shared folders are exam...
Question 3022: A work authorization system is a _________________ for sanct...
Question 3023: Which of the following best describes Maslow's theory of mot...
Question 3024: An Activity has an Optimistic estimate of 1.0 days, pessimis...
Question 3025: The methods and techniques for determining the economic cost...
Question 3026: Which of the following are true regarding the critical path ...
Question 3027: Final risk quantification considers total risk impacts and _...
Question 3028: One of your friends is a manager at telecommunications compa...
Question 3029: Quality and _____ are directly related....
Question 3030: Which of the following is not an input to Team Development?...
Question 3031: Parametric estimates are based on variables such as:...
Question 3032: You are a project manager for a company that sells online mu...
Question 3033: Make payment to seller is done in _______ ....
Question 3034: All the following statements related to Just In Time Manufac...
Question 3035: Which of the following contracts should you use for projects...
Question 3036: You are in the process of controlling changes to the project...
Question 3037: The VP of sales division approaches you and requests that yo...
Question 3038: You are project manager responsible for constructing a new s...
Question 3039: CORRECT TEXT All of the following statements are true regard...
Question 3040: When a project is initiated, one of the first deliverables f...
Question 3041: Which cost is not recoverable?
Question 3042: Project selection criteria cover management concerns such as...
Question 3043: For the following group of numbers: 80, 10, 10, 50, 70 and 9...
Question 3044: Please refer to this Decision Tree which shows the analysis ...
Question 3045: All the following statements about Cost Baseline are correct...
Question 3046: You are in the process of directing the performance of a pla...
Question 3047: Which of the following actions are irrelevant when the criti...
Question 3048: Which of the following are usually illustrated by bar charts...
Question 3049: Project cost management must consider the effect of project ...
Question 3050: The key ingredient to a successful quality management progra...
Question 3051: Which of the following is not considered a constraint in Org...
Question 3052: Which of the following organizational forms would be likely ...
Question 3053: You are the program manager for a new commercial jet. A new ...
Question 3054: All of the following statements are true regarding Ishikawa ...
Question 3055: Which of the following organization holds the project manage...
Question 3056: The most common communication problem during negotiations is...
Question 3057: You are the project manager at an utility company. Due to th...
Question 3058: Before you begin the cost budgeting process for building a n...
Question 3059: Which of the following is the LEAST effective way to influen...
Question 3060: Inputs to cost estimating include the following...
Question 3061: Feasibility studies evaluate alternatives in terms of...
Question 3062: In preparing for a team meeting you want to let the team kno...
Question 3063: Network schedules are prepared during the _____ phase and up...
Question 3064: Technique used to evaluate the degree to which the data abou...
Question 3065: You are the Chief Technology officer of a major Stock Exchan...
Question 3066: In the phase sequence defined by project life cycles, a phas...
Question 3067: Which is not an example of a correctly handled Contract clos...
Question 3068: You have just prepared an RFP for release. Your project invo...
Question 3069: You are managing an internal project where a vice president ...
Question 3070: The following diagram depicts a cumulative likelihood distri...
Question 3071: During execution of your project you observed that a team me...
Question 3072: Which of the following statements describes quality control?...
Question 3073: Which of the following is not true for a Responsibility Assi...
Question 3074: In communications management, to assimilate through the mind...
Question 3075: In the PDM, common constraints include:...
Question 3076: What is the purpose of the Project Plan?...
Question 3077: A company attorney, newly hired by the company, walks into t...
Question 3078: You are managing a software project. During a walkthrough of...
Question 3079: The project Manager determines that 100% inspection is requi...
Question 3080: What is often referred to as the Original duration of an act...
Question 3081: There are two major types of reserves used on projects. The ...
Question 3082: Which is not a part of the project cost baseline but is incl...
Question 3083: Which of the following are not tools/techniques of the devel...
Question 3084: The widget production project is well underway. The requirem...
Question 3085: Which of the following statements are true regarding the pro...
Question 3086: You are the project manager for a software company that deve...
Question 3087: Since you are in the preliminary stages of your project, you...
Question 3088: You are the project manager for the Heart of Texas casual cl...
Question 3089: With triangular distribution, the low, likely and high value...
Question 3090: You are in the process of estimating the type of and quantit...
Question 3091: Which is true about a work breakdown structure?...
Question 3092: The ability of a product to be used for different purposes a...
Question 3093: You are an information security project manager responsible ...
Question 3094: A project manager is running into problems with the team. Pe...
Question 3095: Your new product development project has resulted in a highl...
Question 3096: A Gantt chart is useful in determining...
Question 3097: An advertiser who uses a movie or sports star to endorse a p...
Question 3098: When should the project expeditor form of organization be us...
Question 3099: Information retrieval systems, information distribution meth...
Question 3100: The Delphi Method is well-suited for:...
Question 3101: Non-conformance penalties are a form of _____....
Question 3102: There are hard causes of conflict (e.g. conflicting schedule...
Question 3103: Which of the following activities can be considered as part ...
Question 3104: Project risk is characterized by three factors. What are the...
Question 3105: Which of the following facets of a project are usually affec...
Question 3106: Cost of quality includes:
Question 3107: Residual and secondary risks are outputs from...
Question 3108: Which of the following describes the Executing process group...
Question 3109: The role of the _____ can be invaluable in problem solving....
Question 3110: Which of the following methods is least likely to be used fo...
Question 3111: An element in the WBS was estimated to require 1 month for c...
Question 3112: ADM is an activity-on-arrow method. In this method, a dummy ...
Question 3113: A single source seller is ____________....
Question 3114: To the extent possible, final contract language should refle...
Question 3115: Quality audits are a tool/technique of which of the followin...
Question 3116: Who is responsible to publish project charter?...
Question 3117: Most schedule simulations are based on some form of which of...
Question 3118: Which of the following is the cost-effective rule for shorte...
Question 3119: The extent of project management techniques to be used on a ...
Question 3120: Your company is constructing a dam and your project (which i...
Question 3121: A project manager has finished the project. He knows that th...
Question 3122: Which of the following types of contracts is equivalent to a...
Question 3123: While obtaining responses from prospective sellers, you ment...
Question 3124: Which of the following statements is true regarding brainsto...
Question 3125: Which of the following are not tools/ techniques of the acti...
Question 3126: The project life-cycle can be described as:...
Question 3127: Your team has recommended a change to the scope verification...
Question 3128: Which organization has set the de facto standards for projec...
Question 3129: The primary consideration of product management is to know t...
Question 3130: When a project manager is running over the budgeted costs, t...
Question 3131: Which of the following describes how the various risk manage...
Question 3132: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 3133: The state of being totally answerable for the satisfactory c...
Question 3134: You are in the process of reviewing all change requests and ...
Question 3135: Which of the following is based on an individual identificat...
Question 3136: Your friend is a project manager at a real estate company th...
Question 3137: Which of the following statements are FALSE regarding rollin...
Question 3138: Which of the following statements are FALSE regarding propos...
Question 3139: All of the following are true regarding stakeholder analysis...
Question 3140: A project manager discovers that a project problem has occur...
Question 3141: If the acceptance sampling attribute for a production lot is...
Question 3142: Management by Objectives (MBO)
Question 3143: Selective perception is _____ of new conflicting information...
Question 3144: Which of the following statements are true regarding the ris...
Question 3145: You are a project manager who has recently held a project te...
Question 3146: Which of the following statements are true regarding project...
Question 3147: Which of the following consists of tools and techniques used...
Question 3148: Resource reallocation from non critical to critical activiti...
Question 3149: Your team members have just completed training on specialize...
Question 3150: Exhibit: Please refer to the exhibit. (Exhibit) What is the ...
Question 3151: A project has experienced significant delays due to equipmen...
Question 3152: When should a Time and material contract with a contractor b...
Question 3153: Scope definition is important to the success of the project ...
Question 3154: Which is the Estimate Costs technique used most frequently i...
Question 3155: Inputs to risk management include...
Question 3156: You are the project manager within an information technology...
Question 3157: You have been asked to submit a proposal for a project that ...
Question 3158: Configuration (baseline) control monitors performance agains...
Question 3159: Which of the following tools/ technique of the quality plann...
Question 3160: You are the controller on your project. Your project manager...
Question 3161: When is the BEST time to have project kickoff meetings?...
Question 3162: Which of the following statements are false regarding the re...
Question 3163: A project manager is creating a report of the final status o...
Question 3164: What is the primary purpose of a milestone chart?...
Question 3165: During project team formation and during the early phases of...
Question 3166: Which of the following best describes the schedule developme...
Question 3167: Your sponsor announce to you and your team that his/her door...
Question 3168: Who are the audience of project charter?...
Question 3169: The sum of the products and services to be provided as a pro...
Question 3170: Project cost control includes all of the following EXCEPT:...
Question 3171: You are in the process project a project schedule for repain...
Question 3172: In Configuration management, which of the following is neces...
Question 3173: Which of the following are the part of WBS dictionary except...
Question 3174: You are the part of construction project team responsible fo...
Question 3175: Which is not included in Performance improvements:...
Question 3176: Which of the following statements are false regarding RACI c...
Question 3177: The five major cost categories of quality are _____ ....
Question 3178: You assigned staff members to activities, estimated work and...
Question 3179: Which of the following statements regarding WBS is false?...
Question 3180: Your management applies the 10 percent solution: It has requ...
Question 3181: An example of risk mitigation is:...
Question 3182: One of your friends is a project manager at a computer secur...
Question 3183: According to Herzberg, which of the following is a motivatio...
Question 3184: Attributes quality data are:
Question 3185: You are in the process of developing an approximation of the...
Question 3186: When subordinates know pertinent information that is not kno...
Question 3187: You are having lunch with one of your colleagues. He tells y...
Question 3188: Management Contingency Reserve is identified in which proces...
Question 3189: Constraints do not include:
Question 3190: It is a generally acceptable practice that if one of your cl...
Question 3191: You are working on a project that is similar in scope to a p...
Question 3192: Which of the following formulas is used to calculate the CPI...
Question 3193: The most effective team motivator is:...
Question 3194: Which of the following is not an activity of configuration m...
Question 3195: Which of the following best describes the following organiza...
Question 3196: Budgeted contingencies can be determined by:...
Question 3197: You are the project manager at the Java Ice Cream Factory. Y...
Question 3198: The project scope management plan is an output of which of t...
Question 3199: All the following statements relating to communication manag...
Question 3200: The information-gathering techniques used in the Risk Identi...
Question 3201: What is not a reason for companies to organize Lessons learn...
Question 3202: Thomas is a project manager at a biotech company. He is an e...
Question 3203: You have just completed the project planning process group, ...
Question 3204: You are a project manager for Move It Now trucking company. ...
Question 3205: Quality attributes
Question 3206: All of the following are different dimensions of communicati...
Question 3207: The capacity to get an individual or group to perform a give...
Question 3208: The receiver filters messages based on all but the following...
Question 3209: When should Lessons learned be organized?...
Question 3210: What is typical for Critical chain project management?...
Question 3211: During project execution you found out that work is often no...
Question 3212: You are in the process of directing the performance of the p...
Question 3213: Which of the following best describes why one would use a re...
Question 3214: You are the project manager for the international contract m...
Question 3215: A summary activity describes a group of related schedule act...
Question 3216: Most project management leadership theories focus on all of ...
Question 3217: Product analysis is a / technique of which of the following ...
Question 3218: The _____________ task relationship is defined by the activi...
Question 3219: Your project team has already created the WBS, developed est...
Question 3220: Which of the following are not the direct results of managin...
Question 3221: You are the project manager at a large accounting firm in th...
Question 3222: The purpose of the review of deliverables and project perfor...
Question 3223: The contract management plan is an output of which process?...
Question 3224: Which influence reflects an informal organization?...
Question 3225: The administrative closure procedure that is an output of th...
Question 3226: An employee approaches you and asks to tell you something in...
Question 3227: Contract documentation is an input to the Contract Closure p...
Question 3228: Your project selection committee used a weighted scoring mod...
Question 3229: A work breakdown structure:
Question 3230: Which of the following is an element of procurement manageme...
Question 3231: A scope management plan describes:...
Question 3232: Which of the following is the most complex type of project s...
Question 3233: When performing scope control, which of the following option...
Question 3234: The Preliminary Scope Statement which is and output of the D...
Question 3235: Project risk is characterized by three factors: _____....
Question 3236: Which of the following describes tool/ technique where expen...
Question 3237: A make or buy analysis is used as:...
Question 3238: You are the project manager at Day-Old donuts a rapidly grow...
Question 3239: The budgeted cost of the work performed (BCWP) for a task th...
Question 3240: You are about to close a project which comprises of the deve...
Question 3241: You are the project manager on an information technology pro...
Question 3242: Which of the following types of power is the most effective ...
Question 3243: During which stage of Risk planning are risks prioritized ba...
Question 3244: On a precedence diagram, the arrow between two boxes is call...
Question 3245: The party that needs the change resulting from the project, ...
Question 3246: You are using the three points estimating techniques to esti...
Question 3247: One document which contain the business need of the project,...
Question 3248: Which of the following statements are NOT true?...
Question 3249: Estimated at Completion is determined by:...
Question 3250: The process of choosing/documenting the best approach to ach...
Question 3251: Contract Negotiation is carried out as part of :...
Question 3252: The process of developing a written scope statement as the b...
Question 3253: Standard "Shewhart" control charts assume that the distribut...
Question 3254: Which of the following statements are true regarding the pro...
Question 3255: A significant difference between independent estimates and p...
Question 3256: Your team is split between two buildings on either side of t...
Question 3257: Completion of the _____________ scope is measured against th...
Question 3258: All of the following are outputs of the Integrated Change Co...
Question 3259: In a fishbone diagram, the effect you are concerned about is...
Question 3260: Which of the following is NOT an essential regarding a proje...
Question 3261: Who has the cost risk in a fixed price (FP) contract?...
Question 3262: By which means is a contractor able to control cost overruns...
Question 3263: Which of the following is an output of Verify Scope?...
Question 3264: A factor that limits the project team's options, such as a p...
Question 3265: Team Development is a very critical component of Human Resou...
Question 3266: A poorly defined staffing management plan will LEAST directl...
Question 3267: Post mortem Earned value analysis of a project which is goin...
Question 3268: You are the Project Manager for an aircraft manufacturing co...
Question 3269: Which of the following statements re true regarding Herzberg...
Question 3270: A particular process has two independent sources of variatio...
Question 3271: Which of the following is the configuration management activ...
Question 3272: You're managing a project that is currently executing. You'r...
Question 3273: If a project needs to be terminated early, then you will hav...
Question 3274: What is Team Development?
Question 3275: Which organization is same as Functional organization?...
Question 3276: As a project manager of a construction company, you always p...
Question 3277: You are managing a project to build a new wing onto a local ...
Question 3278: What is least important when it comes to archiving project r...
Question 3279: During which project management process are risk and stakeho...
Question 3280: Project cost control includes all of the following EXCECPT:...
Question 3281: Which of the following helps a project manager determine pos...
Question 3282: You are managing a construction project to install new door ...
Question 3283: If a project manager is using observation and conversation t...
Question 3284: Your project's primary constraint is quality. To make certai...
Question 3285: The project manager, when communicating with an action-orien...
Question 3286: Top three cases on conflict on the project and project sched...
Question 3287: In performing an impact analysis, the most effective tool to...
Question 3288: Which of the following best describes the amount of time one...
Question 3289: During the course of a project you have motivated team membe...
Question 3290: You are a project manager of ABC organization. You are estim...
Question 3291: You are the project manager for the information technology d...
Question 3292: The Japanese Quality Control (QC) Circle movement motivated ...
Question 3293: Which of the following statement are true regarding the CPI ...
Question 3294: Which of the following best describes progressive elaboratio...
Question 3295: Which of the following diagramming methods can only use fini...
Question 3296: As a project manager, you must demonstrate transparency in.....
Question 3297: You are the project manger at a leading manufacturer of cons...
Question 3298: All of the following statements about the project charter ar...
Question 3299: Which of the following is considered during the Procurement ...
Question 3300: Your project exceeded costs in the past caused by an underes...
Question 3301: The purpose of project Risk Management is to:...
Question 3302: Reserve analysis is a tool/ technique in all of the followin...
Question 3303: Formal acceptance by the client or sponsor of the project sh...
Question 3304: Scope reporting is the timely determination, _____, and ____...
Question 3305: Which of the following describes the longest path through a ...
Question 3306: There are four methods of government procurement. Which is n...
Question 3307: Manual filing systems, electronic text databases, and projec...
Question 3308: The three major types of communication are:...
Question 3309: Tools and techniques of procurement planning include...
Question 3310: What is the lowest level in a WBS called?...
Question 3311: In WBS diagramming, the work package is:...
Question 3312: Which of the following statements are true regarding the Ris...
Question 3313: Which of the following statements are true regarding Project...
Question 3314: The Contract management plan differs from the Procurement ma...
Question 3315: Which of the following statement(s) about project customer a...
Question 3316: You are the project manager for Changing Tides video games. ...
Question 3317: All of the following are common uses for a "War Room" except...
Question 3318: In your project, a team member suggested the addition of a f...
Question 3319: The use of quality circles:
Question 3320: You are a PM at a pharmaceutical company. You are the projec...
Question 3321: Risk Event Status is defined as _____ ....
Question 3322: You have accepted a position at a company where you will man...
Question 3323: Which of the following is the amount of time that a schedule...
Question 3324: Work authorization forms are needed in order to:...
Question 3325: You are the project manger at a biotech company, where you a...
Question 3326: A management point in a Work breakdown structure (WBS), whic...
Question 3327: The lowest dollar amount 'at stake' is associated with the f...
Question 3328: Which factors have the strongest influence on customer satis...
Question 3329: All of the following are typical concerns of matrixed team m...
Question 3330: What is the purpose of the responsibility assignment matrix ...
Question 3331: You have been recently been assigned to provide an accurate ...
Question 3332: Effective communication is critical for project success. Sco...
Question 3333: All of the following can be used to estimate the contingency...
Question 3334: Which is another term for top down estimating....
Question 3335: You've been hired by a large consulting firm to lead an acco...
Question 3336: You are a project manager developing a project plan for the ...
Question 3337: All the following refer to power derived by the position of ...
Question 3338: Which of the following statements regarding Resource Breakdo...
Question 3339: You're managing a construction project to install several hu...
Question 3340: Understanding of _________________ characteristics of people...
Question 3341: In a Lump-sum contract, the profit is:...
Question 3342: What are triple constraints of a project?...
Question 3343: Your company has just received approval to purchase a compan...
Question 3344: Which of the following is an estimating technique that uses ...
Question 3345: You have accumulated project information throughout the proj...
Question 3346: _________ is the formal procedure for sanctioning project wo...
Question 3347: The CPM calculates the earliest start date, earliest finish ...
Question 3348: Flextime and compressed workweeks are two popular alternativ...
Question 3349: You are establishing a PMO for National Animal Celebrity Man...
Question 3350: In schedule development, you create a distribution of probab...
Question 3351: You have been recently assigned to provide an accurate proje...
Question 3352: You are the project manager for an upcoming outdoor concert ...
Question 3353: A resource pool description provides:...
Question 3354: You are a project manager for Bluebird Technologies. Bluebir...
Question 3355: Which of the following processes involves determining what r...
Question 3356: Which of the following formulas is used to calculate the SPI...
Question 3357: In which of the following contract type will the buyer assum...
Question 3358: The Pareto Principle is a technique used by quality managers...
Question 3359: The cost of corrective action taken by the purchaser and cha...
Question 3360: Reserve Analysis a technique not used in:...
Question 3361: A series of consecutive points on the same side of the avera...
Question 3362: The management theory that all people can direct their own e...
Question 3363: All of the following statements are true of the project Clos...
Question 3364: Outputs from the initiation process are:...
Question 3365: At XYZ Inc., the hourly wage for semi-skilled workers is $14...
Question 3366: Paul is a project manager for an industrial design project. ...
Question 3367: Inputs to Integrated Change Control include:...
Question 3368: A budget estimate should give the manager cost data accurate...
Question 3369: The process that is not a part of time management is:...
Question 3370: The major project scope management processes include:...
Question 3371: Which of the following represents the BEST process to accomp...
Question 3372: In order to anticipate your management's approval of the amo...
Question 3373: You are a project manager for Dutch Harbor Consulting. Your ...
Question 3374: The scope baseline once established and approved, is used:...
Question 3375: You are in the process of monitoring the various project pro...
Question 3376: Management by objectives assumes that the team...
Question 3377: You are in the process of estimating the type and quantity o...
Question 3378: How does a project management team stay in touch with the wo...
Question 3379: Total Project Risk:
Question 3380: The independence of two events in which the occurrence of on...
Question 3381: Which of the following are included in cost control? (Choose...
Question 3382: Product documentation is input to what process...
Question 3383: The majority of product defects could be prevented in most p...
Question 3384: You are the chief technology officer of a major stock exchan...
Question 3385: In preparing a good project definition, experienced project ...
Question 3386: Which of the following best describes residual risks?...
Question 3387: The customer has negotiated a cost plus incentive fee contra...
Question 3388: Which phase of the project life cycle typically has the high...
Question 3389: Resource Breakdown Structure is an example of:...
Question 3390: You are the project manager for the Late Night Smooth Jazz C...
Question 3391: You are a project manager for a telecommunications firm. You...
Question 3392: The Project Life Cycle:
Question 3393: The type of power most infrequently used by the PM is...
Question 3394: The Communications management plan is a document, which incl...
Question 3395: Which of the following conflict resolution techniques descri...
Question 3396: The ability to achieve cost savings is inversely proportiona...
Question 3397: There is two projects to choose the best one. Project X has ...
Question 3398: Which of the following is often overlooked in achieving effe...
Question 3399: A project is considered successful when...
Question 3400: This process applies evaluation criteria to the bids and pro...
Question 3401: Which of the following statements concerning compromise as a...
Question 3402: Which involves estimating the cost of individual work items:...
Question 3403: A person is writing a document identifying the business need...
Question 3404: You are the project manager. Which of the following would be...
Question 3405: The work that must be done in order to deliver a product wit...
Question 3406: Expectancy theory as applied to project management implies t...
Question 3407: Which of the following statements relating to Assumptions is...
Question 3408: You are in the process of identifying and documenting the pr...
Question 3409: When working in a matrix environment, all of the following a...
Question 3410: One of your project team members has made a technological br...
Question 3411: Which logical relationship does the PDM use most often?...
Question 3412: What is the difference between scope verification and qualit...
Question 3413: In your construction project, the CPI is 0.85 and SPI is 1.....
Question 3414: A new project management software tool has come onto the mar...
Question 3415: Outputs of procurement planning include...
Question 3416: Inputs to Staff Acquisition include all of the following exc...
Question 3417: The technique most commonly used to determine the profitabil...
Question 3418: Which of the following Project Scope Management processes in...
Question 3419: Group brainstorming encourages all of the following except:...
Question 3420: A contractor estimates that a project has a 0.5 probability ...
Question 3421: Project managers have the highest level of authority and the...
Question 3422: The document that authorizes the release of organizational r...
Question 3423: The belief that management's high levels of trust, confidenc...
Question 3424: What is wrong in this diagram? Exhibit: (Exhibit)...
Question 3425: Which of the following represents an example of developing a...
Question 3426: You are the project manager for a manufacturer of children's...
Question 3427: Which of the following are not the direct result of managing...
Question 3428: In your construction project, you decide to make a small cha...
Question 3429: Together with your team, you applied three-point estimation ...
Question 3430: You are in the process of identifying and documenting the lo...
Question 3431: Complete final contract performance reporting and verify pro...
Question 3432: Satisfaction of the functional requirements of a product is ...
Question 3433: Which of the following is CORRECT about quality improvements...
Question 3434: Frequent stimuli for a project include the following, except...
Question 3435: Which of the following approaches is likely to lead to the M...
Question 3436: The risk of accepting a lot of poor quality, in acceptance s...
Question 3437: Which of the following illustrate a chart with upper /lower ...
Question 3438: Which of the following describes a hierarchically organized ...
Question 3439: Which of the following statements are TRUE?...
Question 3440: Which of the following is a tool or technique used in integr...
Question 3441: The Project Manager's ability to influence others using powe...
Question 3442: Which of the following diagrams is most useful in impact ana...
Question 3443: You are working on a project that was proceeding well until ...
Question 3444: Staffing requirements do not define:...
Question 3445: All of the following are tools and techniques of the Perform...
Question 3446: You are a project manager responsible for constructing a new...
Question 3447: A tool that analyzes the inputs to a process to identify the...
Question 3448: You are the project manger at a leading manufacturer of cons...
Question 3449: Which of the following is not part of the acquisition proces...
Question 3450: During what part of Procurement Management process does proc...
Question 3451: Which technique has been applied to develop the following di...
Question 3452: As a project manager, you know that the most important activ...
Question 3453: Supporting details for activity cost estimates should includ...
Question 3454: Cost Plus Percentage of Cost contracts are more desirable fo...
Question 3455: All of the following statements are true regarding the procu...
Question 3456: Which of the following are true regarding project scope mana...
Question 3457: Which of the following is not true regarding project charter...
Question 3458: All of the following are part of cost baseline EXCEPT:...
Question 3459: What is the factor which will help a project manager gain th...
Question 3460: The project schedule is not used to determine:...
Question 3461: Which of the following is closet to Deming's definition of Q...
Question 3462: Which of the following statements are false regarding RACI c...
Question 3463: All the following are needed to create the WBS EXCEPT:...
Question 3464: Which of the following is not a tool or technique of project...
Question 3465: Risk event is the description of what may happen to the ____...
Question 3466: A tool and technique of quality control that keeps errors fr...
Question 3467: You created a Baseline of your System configuration and adde...
Question 3468: 80% of the problems are found in 20% of the work is a concep...
Question 3469: Which of the following is not part of contract administratio...
Question 3470: Information about the project must be distributed to all sta...
Question 3471: Management of a certain building was receiving complaints ab...
Question 3472: As a control tool, the bar chart (Gantt) methods is most ben...
Question 3473: Which tools or techniques are not used in Sequence Activitie...
Question 3474: The degree to which a company accepts and utilizes project m...
Question 3475: You in the project executing process group, and would like t...
Question 3476: Projects are typically authorized as a result of any of the ...
Question 3477: Which of the following is closest to Juran's definition of Q...
Question 3478: The Risk of NOT meeting project quality objectives:...
Question 3479: Job continuity would be an example of _____ in Maslow's hier...
Question 3480: Two sources of variation in the length of hex bolts exist. P...
Question 3481: Which of the following BEST describes the records management...
Question 3482: Preparing the Financial plan for your project will require:...
Question 3483: Which is a valid response to positive risks?...
Question 3484: Which of the following is the distinguishing characteristic ...
Question 3485: The person sending a message is NOT influenced by which of t...
Question 3486: The sequential steps that define the process for successfull...
Question 3487: You are the project manager at a utility company. Due to the...
Question 3488: Investment in project development prevention is most often b...
Question 3489: Techniques that can improve communication include:...
Question 3490: Parametric cost estimating involves:...
Question 3491: Of the following, which usually exhibits the slowest rate of...
Question 3492: The primary communication skills you will use in working wit...
Question 3493: Which of the following processes are performed in the Closin...
Question 3494: In which organizational form do project managers usually get...
Question 3495: In acceptance sampling, if the sample size is kept the same ...
Question 3496: Which of the following are included as part of a scope state...
Question 3497: In which of the following cost estimating techniques are sta...
Question 3498: Which process group is responsible for authorizes the projec...
Question 3499: Which is not one of the five classifications of work found i...
Question 3500: The risk monitoring and control process involves all of the ...
Question 3501: Which of the following concepts refers to a response to a ri...
Question 3502: You are in the process project a project schedule for repain...
Question 3503: Which of the following is true?...
Question 3504: A project manager has increased project costs by US $100,000...
Question 3505: Integrity in the project management field is accomplished th...
Question 3506: Which of the following are NOT tools/ techniques of the Acti...
Question 3507: All of the following should be included in the initial staff...
Question 3508: Monte Carlo analysis can help predict the impact of risks on...
Question 3509: Under which of the following circumstances would project man...
Question 3510: The project manager should be assigned during what phase...
Question 3511: Which of the following represents a consequence to the proje...
Question 3512: All of the following statements regarding the risk breakdown...
Question 3513: Reverse analysis is a tool/ technique in all of the followin...
Question 3514: The customer's expectations for quality are shown on a contr...
Question 3515: Consider the information below, in which activities A, B, an...