<< Prev Question Next Question >>

Question 616/3515

A work breakdown structure which has become part of a contract is often referred to as...

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (3515q)
Question 1: Which of the following statements are FALSE regarding the cr...
Question 2: Which of the following is not a definition to determine a pr...
Question 3: Which of the following compression techniques increases risk...
Question 4: If a project manager is concerned with gathering, integratin...
Question 5: A new project manager is having difficulty creating a WBS wi...
Question 6: When there is uncertainty associated with one or more aspect...
Question 7: Project Procurement Management has the following processes:...
Question 8: You have been hired as a contract project manager for Grapev...
Question 9: Which of the following is NOT an input of the Contract Admin...
Question 10: All of the following statements are true regarding cost-reim...
Question 11: Project managers that are available to answer questions, pro...
Question 12: All of the following are reporting techniques used in the Co...
Question 13: Formal authority is often referred to as legitimate power. W...
Question 14: What are the schedule variance and the schedule performance ...
Question 15: The "To Complete Performance Index" (TCPI) is calculated by:...
Question 16: What is the job title of the person who is primarily respons...
Question 17: You are managing a large construction project that's been br...
Question 18: Which is not one of the triple constraint of a project?...
Question 19: You are a contract project manager for a wholesale flower di...
Question 20: You are in the process of monitoring the various project pro...
Question 21: A junior project manager at your company does not know how t...
Question 22: Which of the following describes an input to the direct and ...
Question 23: You are using the three-point estimating technique to estima...
Question 24: Which of the following process is involved with the completi...
Question 25: In which process is formal acceptance and handover of the fi...
Question 26: Being assigned as a project manager, you noticed during exec...
Question 27: A problem occurs on an activity with free float and the proj...
Question 28: Which of the following is not one of Crosby's Four Absolutes...
Question 29: What is the difference between expected monetary value and n...
Question 30: A histogram ordered by frequency of occurrence that shows ho...
Question 31: Which of the following is NOT a source of information about ...
Question 32: According to C. P. Alderfer, people's needs fall into three ...
Question 33: During project executing, a project team member informs the ...
Question 34: ____________ sometimes, called risk symptoms or warning sign...
Question 35: Which of the following statements are true regarding estimat...
Question 36: Evaluation criteria are an input to the Select Sellers proce...
Question 37: You are the project manager for Lucky Stars Candies. You've ...
Question 38: Which of the following are outputs of the Scope Change Contr...
Question 39: Which of the following Project Human Resource Management pro...
Question 40: A request, demand or assertion of a contract partner for con...
Question 41: You are a project manager for Dutch Harbor Consulting. Your ...
Question 42: You are the project manager for a scheduled version release ...
Question 43: When working in an environment that uses learning curves, th...
Question 44: Which of the following depreciation methods provides for acc...
Question 45: _____ of the extra costs of the project can often be attribu...
Question 46: With respect to risk management, which of the following are ...
Question 47: Participative Management:
Question 48: The VP of customer service has expressed concern over a proj...
Question 49: In a fixed price contract, the buyer decides to increase the...
Question 50: You have been hired by a contractor, who wants you to manage...
Question 51: Communication planning is most tightly linked with what proc...
Question 52: Please refer to the chart given below, which shows the time ...
Question 53: A quality control (QC) manager for a manufacturing firm is c...
Question 54: For effective communication, the message should be oriented ...
Question 55: What does a project manager need first and foremost to deter...
Question 56: Which of the following is the MAIN reason for including ince...
Question 57: Which is not included in General Management:...
Question 58: Your company develops large commercial and industry real est...
Question 59: The term that best describes the 'right' to manipulate or ch...
Question 60: If there is a change to the approved cost baseline, the proj...
Question 61: Which of the following is NOT part of a typical change contr...
1 commentQuestion 62: Which of the following are NOT part of the PMI professional ...
Question 63: The project manager has performed schedule network analysis,...
Question 64: You are managing a software project. You are partway through...
Question 65: You have a choice of accepting a fixed price contract for $1...
Question 66: You are in the process of numerically analyzing the effects ...
Question 67: A Responsibility Assigned Matrix (RAM) can be used for all o...
Question 68: Your project is close to completion, when you are informed b...
Question 69: Risk classified as unknown unknowns (i.e., those which canno...
Question 70: During execution of a project, the most common source of con...
Question 71: The tools and techniques of the Perform Quality Assurance pr...
Question 72: Advantages of the functional (hierarchical) form of organiza...
Question 73: You have been assigned to a project that will allow job seek...
Question 74: You are a project manager for the manufacture of children's ...
Question 75: Project report, project record, and project presentation are...
Question 76: Which of the following is considered a direct cost for produ...
Question 77: You are approached by the company where you have been workin...
Question 78: Taking the following table into account, where would correct...
Question 79: The use of quality management tools is used to provide...
Question 80: All of the following precedence relationships can be express...
Question 81: Interfacing with the customer after project go-ahead is the ...
Question 82: You are managing a project in a foreign country, where you r...
Question 83: Project termination responsibilities include all of the foll...
Question 84: You are a part of project software team responsible for deve...
Question 85: You are the project manger at a construction company. Your c...
Question 86: Which of the following would be the MOST appropriate thing t...
Question 87: In a project lifecycle, least number of conflicts occur over...
Question 88: Team development is based on the-...
Question 89: You are in process of exterminating which set of project act...
Question 90: Which of the following are tools and techniques of the Preli...
Question 91: Which of the following process involves measures project and...
Question 92: What is the difference between Verify Scope and quality cont...
Question 93: A WBS can be used for :
Question 94: Risks are accepted when:
Question 95: Which of the following is the total amount of time that a sc...
Question 96: Your company is making a strategy shift: form being focused ...
Question 97: The main reason to plan team building activities (e.g. regul...
Question 98: Your project has a virtual team. Half of your team members a...
Question 99: Which of the following is NOT an example of a deliverable?...
Question 100: At the outset of a project you should define the processes n...
Question 101: Which of the following statements are FALSE regarding weight...
Question 102: At the beginning of Project execution, you notice different ...
Question 103: Respect is...
Question 104: You are in the process of obtaining the necessary human reso...
Question 105: In which of the following is the cost of risk hidden by the ...
Question 106: Recommended corrective actions are an input to which process...
Question 107: Characteristics of a code of accounts are...
Question 108: In a weak matrix organization, functional managers are usual...
Question 109: What does letter of agreement include?...
Question 110: Which of the following networking methods allows us to show ...
Question 111: The Communications Management Plan should contain the follow...
Question 112: The applied level of change control is least dependent upon:...
Question 113: Your company has just received approval to purchase a compan...
Question 114: The financial closeout of a project dictates that:...
Question 115: Which point in time does a Payback period analysis identify?...
Question 116: All of the following statements are true regarding the criti...
Question 117: Sally is a project manager working on a project that will re...
Question 118: You are the project manger assigned to perform seismic retro...
Question 119: Which of the following documents initiates a project and aut...
Question 120: You have been assigned as a project leader and must first re...
Question 121: The one document that should always be used to help identify...
Question 122: Quality control involves monitoring specific project results...
Question 123: Which of the following best describes the Plan-Do-Check-Act ...
Question 124: You are in process of monitoring the various project process...
Question 125: A project manager who allows the team to make the majority o...
Question 126: Random cause or system variation is:...
Question 127: Which of the following are not considered as enterprise envi...
Question 128: You have been recently assigned to provide an accurate proje...
Question 129: Conflict management requires problem-solving. Which of the f...
Question 130: Which of the following statements concerning contract type i...
Question 131: Building a virtual team for a project will limit the usabili...
Question 132: You would like to measure the association between tow variab...
Question 133: You are working with potential sponsors to determine which p...
Question 134: The "zero defect" concept was proposed by:...
Question 135: The process of identifying and defining a product or service...
Question 136: You are the project manager for a construction company. Your...
Question 137: All of the following statements are true regarding the criti...
Question 138: What is the term that is used when referring to the adjustme...
Question 139: Which of the following is not a characteristic of a work pac...
Question 140: You are the project manager for ABC Organization. You have b...
Question 141: A common mistake in communications is to _____ of the receiv...
Question 142: Which of the following techniques do project manager used mo...
Question 143: Procurement audits review which of the following?...
Question 144: Where is the bulk of the project budget spent?...
Question 145: During the six month update on a 1 year, $50,000 project, th...
Question 146: The review for the specification completeness is performed d...
Question 147: You are the project manager for a large children's toys manu...
Question 148: Project Stakeholders are defined as:...
Question 149: You are the project manager at Day-Old donuts a rapidly grow...
Question 150: Which of the following is not an input to the cost control p...
Question 151: Suppose your company has acquired a high end server three ye...
Question 152: The risk management plan is a subset of the project manageme...
Question 153: The level of authority of the project manager:...
Question 154: A project is considered to be complete when...
Question 155: Which of the following is true regarding product scope descr...
Question 156: Your project team has identified several potential risks on ...
Question 157: Which of the following statements are FALSE?...
Question 158: Which is an input to resource planning?...
Question 159: You are performing actions such as reporting and comparing a...
Question 160: Which of the following processes is involved with identifyin...
Question 161: You've been hired as a project manager for a local community...
Question 162: Typical characteristics of a work package include:...
Question 163: Which of the following terms best describe the approach used...
Question 164: Who should always issue the project charter?...
Question 165: Hard logic in the preparation of a network refers to:...
Question 166: The project manager that allows and supports group discussio...
Question 167: You are in process of controlling changes to the project cos...
Question 168: Performance reports are an input to overall change control. ...
Question 169: A chart of accounts is use to:
Question 170: You are in the process project a project schedule for repain...
Question 171: You are in the process of contacting sellers to obtain bids ...
Question 172: The project team form of organization confers both advantage...
Question 173: You are reporting on project elements such as schedule statu...
Question 174: You're managing a construction project to install several hu...
Question 175: You are involved in monitoring specific project results to d...
Question 176: Your project was just completed. Because of some unfortunate...
Question 177: The cost of quality often refers to cost to produce a produc...
Question 178: In which of the following scope management processes are sub...
Question 179: Since risk is associated with most projects, the best course...
Question 180: At which stage, stakeholders have maximum influence on proje...
Question 181: It is argumentative whether project managers actually contro...
Question 182: A technical requirement has which of the following character...
Question 183: Which is controlling changes to the budget....
Question 184: Risk mitigation involves all but which of the following:...
Question 185: You are the project manager responsible for renovating a 70-...
Question 186: A project is considered to be complete when...
Question 187: The Estimate At Completion (EAC) can be used to forecast the...
Question 188: When the project does not obtain products and services from ...
Question 189: You have been asked to submit a proposal for a project that ...
Question 190: You are a project manager for a growing dairy farm. It offer...
Question 191: A collection of documents that will change over time as more...
Question 192: What does a project manager need to perform the Manage proje...
Question 193: In project-driven companies, costs are usually billed againe...
Question 194: You are in the process of establishing a total cost baseline...
Question 195: _____ is a narrative description of the work to be accomplis...
Question 196: A team may not be fully functional until each member...
Question 197: Which of the following are examples of project-based organiz...
Question 198: You are the project manager at a utility company. Due to the...
Question 199: Please refer to the chart given below: (Exhibit) What is the...
Question 200: Which type of contract requires that the buyer keep the tigh...
Question 201: Which of the MOST appropriate things to do during project in...
Question 202: You are one of ten full-time project managers in your organi...
Question 203: A scope change control system
Question 204: One of key activities for achieving customer satisfaction is...
Question 205: The Utility Theory _____ .
Question 206: Inputs to overall change control include:...
Question 207: In the past, most project managers have come from _____ fiel...
Question 208: Which statement describing attributes of the Project Manager...
Question 209: In a matrix organizational form, which factor(s) make it dif...
Question 210: In a flowchart, the diamond form is used to represent:...
Question 211: Human Resource Management is tightly linked to which other k...
Question 212: A scenario is presented in which current variances are seen ...
Question 213: Which of the following techniques accounts for path converge...
Question 214: Which of the following items would be the most important asp...
Question 215: You have been recently hired to be a project manager at a bi...
Question 216: Project Cost Management Plan is created as a part of:...
Question 217: Work packages are used to:
Question 218: At 40% through your project you have a BCWS of $68,000 and a...
Question 219: You are going to take over a new project as the project mana...
Question 220: The work breakdown structure (WBS) is an excellent tool for ...
Question 221: Mike is a project manager for an IT technology implementatio...
Question 222: The ___________ can be used to assess outlays and funding re...
Question 223: Project Risk Management is based on which of the following p...
Question 224: Which of the following best describes project funds that are...
Question 225: Which of the following are the part of WBS dictionary except...
Question 226: Which of the following are types of status reports?...
Question 227: You are managing a construction project. During your risk id...
Question 228: All of the following statements are true regarding configura...
Question 229: Which approach to creating a WBS is often used for projects ...
Question 230: You have been assigned to a project to build the largest...
Question 231: The "rolling wave" or "moving window" concept is used most f...
Question 232: What is the five whys method used for?...
Question 233: Which must be measured regularly to identify variances from ...
Question 234: The concept of making a giant leap forward followed by a per...
Question 235: In a team meeting, two of the managers start a discussion th...
Question 236: Which of the following is NOT necessary when developing a de...
Question 237: The contract management plan is an output of which process?...
Question 238: You are using the interviewing technique of the Quantitative...
Question 239: In which type of organization is team building likely to be ...
Question 240: You are in the process of making project staff assignments. ...
Question 241: Monte Carlo analysis is a form of what type of analysis?...
Question 242: The purpose of a dummy activity in an activity-on-arrow diag...
Question 243: Assume that you have a network where an activity on the crit...
Question 244: What are the tools and techniques for project plan developme...
Question 245: Which of the following is not a type of baseline from which ...
Question 246: All of the following statements are true regarding proposals...
Question 247: Which of the following are outputs of the information distri...
Question 248: Situations calling for a matrix organization include outside...
Question 249: Which of the following can be tracked using the WBS?...
Question 250: You are the project manager for a new construction project i...
Question 251: Which of the following processes is involved with allocating...
Question 252: Which process is not included in Project Cost Management?...
Question 253: As you complete each deliverable for your project, you check...
Question 254: In which of the following organizations is the project manag...
Question 255: The closing process scope includes:...
Question 256: Project management processes can be organized into:...
Question 257: Which is a valid response to negative risks?...
Question 258: You are a project manager for an engineering company. Your c...
Question 259: Cost estimating includes all of the following except:...
Question 260: A project team member tells you that she went to her project...
Question 261: Where does comparing actual to baseline schedules, examining...
Question 262: You are managing a project with 23 team members and six key ...
Question 263: Which is not an element of procurement management?...
Question 264: Determining and delivering the required levels of quality is...
Question 265: The scope management provides:
Question 266: "A Project Manager is at the project kick-off meeting. He co...
Question 267: You are the project manager for an outdoor concert event sch...
Question 268: Assuming a PERT weighted average computation, what is the pr...
Question 269: In which of the following contract types does the buyer have...
Question 270: How many ADDITIONAL lines of communication will be created w...
Question 271: The range of time allowed for an activity to be completed in...
Question 272: Which of the following contract types places the greatest ri...
Question 273: You have been asked to select between three projects. Projec...
Question 274: Which of the following statements are true regarding the cri...
Question 275: Contingency planning should include all but which of the fol...
Question 276: What should you avoid when you are organizing documents as L...
Question 277: In a matrix organization, which of the following is not a re...
Question 278: The reason that cost management is so difficult in project m...
Question 279: You are a project manager for an engineering company. Your c...
Question 280: If two events cannot both occur in a single trial, they are:...
Question 281: Contract Administration is the process of ensuring that the ...
Question 282: Communication management is best described as conducting or ...
Question 283: You are in the process of estimating the type and quantity o...
Question 284: ___________ are not necessarily used to establish the Cost b...
Question 285: Which of the following statements are true regrinding issue ...
Question 286: The project plan is used to do all of the following except:...
Question 287: What is important for Quality auditors?...
Question 288: Going from Level 2 to Level 4 in the work breakdown structur...
Question 289: You are in the process of estimating the number of work peri...
Question 290: Which of the following best describes what is a workaround?...
Question 291: Value engineering/Analysis is the systematic use of techniqu...
Question 292: During the Develop Schedule process the Project Manager may ...
Question 293: In a project, you are presented with following four options....
Question 294: Management reserves are used to handle which type of risk?...
Question 295: You are managing a project where you work with 7 other team ...
Question 296: You are in the process of developing an approximation of the...
Question 297: Life seems to be going very well for your close friend, a fe...
Question 298: A WBS provides a framework from which all of the following c...
Question 299: The Cost Performance Index is computed as:...
Question 300: You are the project manager for the software company that de...
Question 301: In an activity-on-node diagram, the nodes represent:...
Question 302: You are project manager of project and senior management tol...
Question 303: Which of the following are NOT considered formal types of pr...
Question 304: Which of the following is a "hygiene factor" under Herzberg'...
Question 305: In which of the following types of organizational structures...
Question 306: You are in the process of identifying and documenting the lo...
Question 307: Risk can be divided into two basic types; business risk and ...
Question 308: Which of the following would most likely increase the accura...
Question 309: The Communication Management Plan provides all of the follow...
Question 310: You are currently on a 3-week vocation in Australia. You've ...
Question 311: You are a project manager for Zippy Tees. Your selection com...
Question 312: You are project manager responsible for constructing a new s...
Question 313: You are negotiating with a seller. Time is of the essence bu...
Question 314: You are the project manager for Lucky Stars nightclubs. They...
Question 315: In the project environment, the individual ultimately respon...
Question 316: As a project manager you can assign any one of two team memb...
Question 317: According to the PMI, which of the following best describes ...
Question 318: As you determine the requirements, constraints and assumptio...
Question 319: You are currently analyzing the schedule for a project. You'...
Question 320: Your project is progressing as planned. The project team has...
Question 321: A scientist is informing techs. about a new product which is...
Question 322: You have summarized the project and note that 28,000 hours h...
Question 323: During execution of a project, you observe that the performa...
Question 324: Which one of the following is not an acquisition method?...
Question 325: All of the following aid in achieving consensus EXCEPT:...
Question 326: Which of the following types of limits is often not directly...
Question 327: Proper implementation of project management will guarantee t...
Question 328: The total project scope is:
Question 329: A project manager is assigned to a project which phase of th...
Question 330: All of the statements regarding decision tree analysis is tr...
Question 331: You are working on a project and discover that one of the bu...
Question 332: The profitability and technical data studies are provided in...
Question 333: You're managing a construction project to install several hu...
Question 334: Overlapping activities on a project, such as design and cons...
Question 335: Certain resources have been added to tasks on the critical p...
Question 336: As the Project Manager of an IT project, you are in the proc...
Question 337: Which task is ahead of schedule and under cost?...
Question 338: You are the project manger assigned to build the house. You ...
Question 339: Which of the following is not true about Project Plan Develo...
Question 340: Configuration management does all of the following except:...
Question 341: Which of the following is LEAST likely to improve the accura...
Question 342: You are in the process of identifying and documenting projec...
Question 343: During contract closure, a procurement audit includes all of...
Question 344: Which of the following statements BEST describes an Estimate...
Question 345: Bar charts are most appropriate for:...
Question 346: The project schedule is not used to determine...
Question 347: Documented work authorization provide:...
Question 348: You are managing a project with an EV of $15,000, PV of $12,...
Question 349: Your project will require use of a high pressure punch press...
Question 350: Which of the following is true regarding IRR?...
Question 351: What is the meaning of the acronym CSOW?...
Question 352: War room creation during project deployment phase is an exam...
Question 353: Which of the following should be done by the project manager...
Question 354: A team member approaches you with a change that could cut yo...
Question 355: Those areas that a project manager considers to be true, rea...
Question 356: Trend Analysis is best described as:...
Question 357: A contract originated bilaterally may be developed by _____ ...
Question 358: Which of the following statements are true regarding the pro...
Question 359: Define and sequence following different stages of the Team D...
Question 360: In which of the following contract types is the seller's pro...
Question 361: You are currently in the process of prioritizing risks by th...
Question 362: You are in the process of developing an approximation of the...
Question 363: Which is not an output of the Activity definition process?...
Question 364: You are in process of numerically analyzing the effects of i...
Question 365: Upon completion of 75% of the project, the original schedule...
Question 366: Which of the following document include a code of account id...
Question 367: Inputs to communication planning include...
Question 368: In negotiating with functional department managers, project ...
Question 369: On November 1, $1000 worth of work on task A was supposed to...
Question 370: Your project sponsor has requested a cost estimate for the p...
Question 371: Which of the following is not the feature of a project?...
Question 372: A technique that can be used to measure the total income of ...
Question 373: You are the project manager for the software company that de...
Question 374: You are in the build phase of the project. But it has run in...
Question 375: You are a project manager at construction company, assigned ...
Question 376: _____ is a formal invitation containing a scope of work whic...
Question 377: Under what circumstances is it better for a contractor to su...
Question 378: Three types of written media used in organizations are _____...
Question 379: Which of the following statements are FALSE regarding qualit...
Question 380: Your project team is already created the WBS, developed esti...
Question 381: You are the project manager at a software company developing...
Question 382: You are managing a software engineering project, when two te...
Question 383: The Project Integration Management Knowledge Area consists o...
Question 384: Your project will most likely be completed in 10 weeks. Wors...
Question 385: You are in the process of making information available to pr...
Question 386: Which of the following describes an input to the direct and ...
Question 387: Likely schedule durations for Estimate Activity Durations ar...
Question 388: Things that distort, distract, or muddle the communication p...
Question 389: What are the cost types in modern quality management?...
Question 390: You have just completed the progress planning process group ...
Question 391: Which of the following MUST NOT performed in project initiat...
Question 392: The Project Management Knowledge Areas ___________________ ....
Question 393: All of the following statements are true regarding conflict ...
Question 394: A structured tool, usually industry or activity specific, us...
Question 395: Post-mortem analysis of a project shows a CPI of 0.8 and an ...
Question 396: Which of the following is NOT true of obtaining project plan...
Question 397: Which of the following statements is false?...
Question 398: Back charges refers to:
Question 399: Project Procurement Management includes:...
Question 400: You've constructed the WBS for your recent project. You've r...
Question 401: You have been assigned to a project in which the objectives ...
Question 402: R &amp; D project managers in high-tech companies most often...
Question 403: You are a project manager for a company that sells online mu...
Question 404: You work for a large manufacturing plant. You're working on ...
Question 405: You are the project manger for Xylophone Phonics. It produce...
Question 406: All of the statements are FALSE regarding Resource Calendars...
Question 407: You are a project manager at an utility company. Due to the ...
Question 408: The sponsor is worried about the seller deriving extra profi...
Question 409: You are the project manager for the international contract m...
Question 410: All of the following statements are true regarding scatter d...
Question 411: Which of the following is not an input into Project Plan Dev...
Question 412: Life cycle costing is the total cost to the customer for the...
Question 413: Which of the following tools and techniques are commonly use...
Question 414: One of your friend is a project manager at a natural gas ene...
Question 415: Measuring the probability and consequences of risks is part ...
Question 416: All of the statements regarding control accounts and plannin...
Question 417: During Risk identification sessions, you and your team ident...
Question 418: _____ is a method of procurement where a contract results fr...
Question 419: Random variance in a process can be directly reduced by ____...
Question 420: Which of the following is or are a part of Solicitation proc...
Question 421: Which of the following statements are true regarding Quality...
Question 422: A risk management plan is a subset of the project management...
Question 423: Which of the following is not an Output of the Scope Initiat...
Question 424: Over the life cycle of the project, the quality of informati...
Question 425: You are in the process of tracking team member performance, ...
Question 426: You are considering outsourcing some of the work on your pro...
Question 427: Which statement describes best the term Sink node?...
Question 428: Which of the following is considered a method of accelerated...
Question 429: Your new product development project has resulted in a highl...
Question 430: Your work as a project manager at the computer chip manufact...
Question 431: Which of the following statements are true regarding the Par...
Question 432: Maintenance should:
Question 433: Process analysis is a function of ____________....
Question 434: Which of the following can be used to determine what work is...
Question 435: At the end of an internal project, you find several key stak...
Question 436: There are 17 people on a project. How many lines of communic...
Question 437: What is signified when a forward and backward pass indicates...
Question 438: Which of the following processes assesses the likelihood of ...
Question 439: Qualitative risk analysis requires accurate data as its inpu...
Question 440: Risks include the following types:...
Question 441: A summary WBS is usually developed in the...
Question 442: Which of the following processes involves allocating cost es...
Question 443: You are continually faced with tasks coming in late because ...
Question 444: Which of the following terms is used to refer to the adjustm...
Question 445: You are involved in monitoring specific project results to d...
Question 446: Which of the following statement about project phases and pr...
Question 447: Which of the following contract types has the highest risk t...
Question 448: All the following are tools for cost estimating except:...
Question 449: You are the project manger at XYZ Software Corp, a U.S softw...
Question 450: You are in the process of controlling changes to the project...
Question 451: Knowledge of best practices in a particular area is most lik...
Question 452: Which of the following processes has risk register as the pr...
Question 453: What is the benefit of a Weighting system over a Screening s...
Question 454: Which of the following conflict resolution techniques descri...
Question 455: You are in process of creating the detailed project scope st...
Question 456: Customer satisfaction should be measured at the end of the p...
Question 457: Which of the following statements are true regarding project...
Question 458: Which of the following tools/ techniques of the quality plan...
Question 459: When a majority of team members must agree before a decision...
Question 460: Which of the following is the MOST likely candidate for a th...
Question 461: Which of the following statements are TRUE regarding precisi...
Question 462: A project involves arranging for the closing of the company ...
Question 463: Projects are initiated in response of:...
Question 464: You are a project manager with several years of experience i...
Question 465: Dennis works 4 an international manufacturer of costumer ele...
Question 466: Which of the following could be an appropriate WBS code for ...
Question 467: A difference between a Statement of work and a Scope stateme...
Question 468: Which of the following tools are used to implementation of a...
Question 469: Overall change control is concerned with all of the followin...
Question 470: Life Cycle Costing:
Question 471: You are managing the development of a highly controversial p...
Question 472: To calculate the late start and late finish dates for a set ...
Question 473: Which of the following statements are true regarding quality...
Question 474: Measuring the probability and consequences of risks is part ...
Question 475: Which of the following options would you take to determine w...
Question 476: The risk register describes all the identified risks. Which ...
Question 477: Which of the following processes is NOT part of Project Huma...
Question 478: All of the following statements are true regarding risk even...
Question 479: Which of the following establishes the procedures to transfe...
Question 480: Which of the following is NOT a source selection tool or tec...
Question 481: During a project review meeting, you discover that your $250...
Question 482: You are in the process of monitoring the various project pro...
Question 483: Which of the following are indicative of duration estimates?...
Question 484: You work at RFID-PM Inc, a publicly traded company that deve...
Question 485: Keeping up with the growth was becoming a problem for a priv...
Question 486: An input to the scope planning process is:...
Question 487: You are working on a project that requires resources with ex...
Question 488: Which of the following processes allow an unsuccessful bidde...
Question 489: Which of the following is an output of Define Scope?...
Question 490: All of the following statements regarding Control Accounts a...
Question 491: All of the statements regarding control accounts and plannin...
Question 492: "The seller delivers a fixed price plus incentive fee projec...
Question 493: A tight matrix is:
Question 494: If a risk has a 20 percent chance of happening in a given mo...
Question 495: One of your friends is a manager at telecommunications compa...
Question 496: Which of the following actions is an example of risk respons...
Question 497: Three-Point Estimates includes _________....
Question 498: Your company has an agreement with the labor union that stat...
Question 499: Job descriptions are examples of ______communications....
Question 500: A clear definition of the user's needs serves as the direct ...
Question 501: Which of the following is the BEST candidate for a three-poi...
Question 502: Earned value should be used to estimate final project costs ...
Question 503: Quality management:
Question 504: Which of the following statements are true regarding Delphi ...
Question 505: All of the following are tools/ techniques of Perform Qualit...
Question 506: A process that is not part of Project Risk Management is:...
Question 507: At the beginning of the project, you hold a meeting with all...
Question 508: With respect to the cost of quality which of the following i...
Question 509: The sending or conveying of information from one place to an...
Question 510: You have been assigned to a project in which the objectives ...
Question 511: Inspection processes are considered _____....
Question 512: You are a project manager of ABC organization. You have been...
Question 513: Understanding cultural key similarities and differences is e...
Question 514: Communication is the key to the success of a project. As the...
Question 515: What does the term Best practice often refer to?...
Question 516: You've been hired as a manager for the adjustments departmen...
Question 517: Which statement describes best the purpose of brainstorming ...
Question 518: In organizing a project, a project manager must deal with co...
Question 519: Which of the following statements regarding WBS are FALSE?...
Question 520: You are the project manager fro the large children's toy man...
Question 521: All of the following statements regarding management reserve...
Question 522: During project executing, a previously unidentified risk has...
Question 523: Which of the following types of specifications gives measura...
Question 524: Which may be employed to shorten a schedule without changing...
Question 525: The fund available to a organization to invert in project is...
Question 526: You are currently finishing a project under contract to deve...
Question 527: Precedence diagramming method (PDM) uses which of the follow...
Question 528: Which of the following is not a tool or technique for overal...
Question 529: There are two projects from which you have to choose one. Pr...
Question 530: A work package is:
Question 531: The risk register is an input to all of the following proces...
Question 532: A project has the following Earned value data assessed: AC: ...
Question 533: Problem solving addresses potential problems on the project....
Question 534: You are in the process of controlling changes to the project...
Question 535: In which of the following types of contracts is it most impo...
Question 536: You are building the budget for your project. You don't have...
Question 537: Which of the following depicts a hierarchical tabulation of ...
Question 538: The practice of ceasing mass inspections and ending awards b...
Question 539: Your company provides answering services for several major c...
Question 540: Early activities are detailed and future activities are stil...
Question 541: Role of the sponsor is BEST described as:...
Question 542: Lessons learned are most often based upon project historical...
Question 543: Which of the following statement are correct regarding manag...
Question 544: You've been hired as a project manager for a local community...
Question 545: Which of the following is an output from the Contract Closeo...
Question 546: Which knowledge area does not provide input into cost budget...
Question 547: Which of the following statements are false regarding the ad...
Question 548: The overall intentions and direction of an organization with...
Question 549: Which conflict resolution technique do project managers use ...
Question 550: An electronic component had a reliability of 0.90. Two of th...
Question 551: Which of the following techniques uses a weighted average du...
Question 552: The LEAST effective form of communication for complex situat...
Question 553: Which of the following describes the optimal way of communic...
Question 554: You are a project manager for a documentary film company. In...
Question 555: In attempting to complete the project faster, the project ma...
Question 556: Configuration Management, Performance Measurement and Projec...
Question 557: As a project manager, you're responsible for maintaining and...
Question 558: Which of the following is the MOST valuable result of creati...
Question 559: You are the project manager for an information technology di...
Question 560: The major disadvantage of a bar chart is:...
Question 561: Legitimate power is:
Question 562: Which of the following statements are true regarding various...
Question 563: You are a project manager at day-old donuts, a rapidly growi...
Question 564: Your project run for a customer is coming to an end. The cus...
Question 565: Which statement is false? Progressive elaboration of project...
Question 566: You are a project manager at a biotech company, where you ar...
Question 567: The salvage value of an asset is:...
Question 568: The outcome that must be produced to complete a part of a pr...
Question 569: You are a project manager for Move It Now trucking company. ...
Question 570: You have been assigned to a project to build the largest...
Question 571: You are working on a construction project. You, your team, a...
Question 572: You are project manager at a large multinational company dev...
Question 573: The core planning processes include:...
Question 574: You are planning a project that uses the same team as a proj...
Question 575: In a contract, the point of total assumption refers to the p...
Question 576: The outputs from risk identification are usually contained i...
Question 577: All of the following statements are true regarding the cost ...
Question 578: The project charter is typically approved by the project spo...
Question 579: Keeping up with the growth was becoming a problem for a priv...
Question 580: As a Project Manager for a construction company, you are res...
Question 581: Which of the following describes the difference between the ...
Question 582: If the number of critical paths in the project increases, bu...
Question 583: Which is a technique often used for Quality assurance?...
Question 584: The procurement management plan describes how the procuremen...
Question 585: You are the project manager for a cable service provider. Yo...
Question 586: All of the following statements are true regarding the Human...
Question 587: The scope baseline/project charter is prepared by the:...
Question 588: When components in a system are arranged in parallel, system...
Question 589: In your software project, you have a programmer who constant...
Question 590: Scope management is:
Question 591: To calculate the expected value of an outcome:...
Question 592: You are the project manager for an information technology di...
Question 593: Your company has just presented its new five-year strategic ...
Question 594: Which of the following is not a consideration in selecting p...
Question 595: In an ideal situation resource leveling should be limited to...
Question 596: Adding 5 people to a 4 person team increases the communicati...
Question 597: Which of the following is NOT one of the most common sources...
Question 598: Two of your project team members approach you with a conflic...
Question 599: Project Cost Management includes all of the following except...
Question 600: Which of the following statements are FALSE regarding rollin...
Question 601: Risk monitoring and control process involves all of the foll...
Question 602: Which of the following statements regarding configuration ma...
Question 603: We assign human and non-human resources in the _____ phase o...
Question 604: What is true for Statistical sampling?...
Question 605: Which is a phased budget used to measure and monitor cost pe...
Question 606: With respect to earned value analysis, which of the followin...
Question 607: What are the BEST inputs to the Initiation process?...
Question 608: You need to convey some very complex, detailed information t...
Question 609: Instead of celebrating the end of the project, the stakehold...
Question 610: You are in the vendor management department of your company ...
Question 611: You recently took over the assignment for a project. The pro...
Question 612: You are a new project manager who has never managed a projec...
Question 613: Which of the following statements are false regarding sensit...
Question 614: Inputs to scope verification include the following...
Question 615: Which of the following are true regarding project risk manag...
Question 616: A work breakdown structure which has become part of a contra...
Question 617: Which of the following statements regarding networking is fa...
Question 618: You need to determine when to release resources from your pr...
Question 619: Which of the following is a method for quantifying qualitati...
Question 620: Constrained optimization models and benefit measurement meth...
Question 621: You are a project manager for a software manufacturing firm....
Question 622: Which of the following can be used to determine what work is...
Question 623: Your company manufactures small kitchen appliances. It is in...
Question 624: History has shown that project managers can be trained in a ...
Question 625: You are the project manager responsible for renovating a 70-...
Question 626: You gathered a lot of knowledge on project management in you...
Question 627: Which of the following best describes the tool/ technique us...
Question 628: The logical relationship that communicates a delay between t...
Question 629: How would you as the project manager address this project te...
Question 630: Cost Reimbursable contracts are equivalent to:...
Question 631: By which process may an unsuccessful supplier seek remedy fo...
Question 632: Which of the following models of conflict resolution allows ...
Question 633: Which of the following are tool/ technique of Perform Qualit...
Question 634: In which type of organization(s) is the project manager's ro...
Question 635: A team member from research and development tells you that h...
Question 636: Which is not a tool or technique for project plan execution:...
Question 637: Listening involves more than hearing sounds. The good listen...
Question 638: The process of evaluating overall project performance on a r...
Question 639: Which of the following are constraints that you might find d...
Question 640: Which of the following is NOT a valid reason to authorize a ...
Question 641: The project charter should be issued by...
Question 642: All of the following statements are true regarding risks exc...
Question 643: The "control points" in the work breakdown structure used fo...
Question 644: The specifications for a particular part are "10 +/-0.015". ...
Question 645: The "buy or make" decision is usually made during the:...
Question 646: As the most recent in a succession of project managers assig...
Question 647: Your company, Kick That Ball Sports, has appointed you proje...
Question 648: The primary communication skills you will use in working wit...
Question 649: Which is the BEST description of project scope?...
Question 650: Project Risk Management includes all of the following proces...
Question 651: Your project team has created a new way to process claim for...
Question 652: Which of the following techniques incorporates a form of ris...
Question 653: The first document produced on a project SHOULD be the:...
Question 654: Exhibit: (Exhibit) Please refer to the exhibit. Use the foll...
Question 655: Probability-impact matrix, risk data quality assessment, ris...
Question 656: Tools &amp; techniques for risk identification include...
Question 657: Each of the following describes an element of the scope defi...
Question 658: All direct or indirect training costs should generally be th...
Question 659: Which of the following is not a method of government procure...
Question 660: Communication always makes use of....
Question 661: After project is completed, a complete set of indexed projec...
Question 662: You are the project manager for BB Tops, a nationwide toy st...
Question 663: What is one of the most important skills a project manager c...
Question 664: You are the project manager for Lucky Stars nightclubs. They...
Question 665: A project manager wants to transmit a complex message to sev...
Question 666: Resource leveling _____.
Question 667: CIP is:
Question 668: The following types of costs are relevant to making a financ...
Question 669: You are the project manager for ABC Organization. You are co...
Question 670: You are using the three-point estimating technique to estima...
Question 671: All of the following statements regarding quality metrics ar...
Question 672: You are a project manager for Waterways Houseboats, Inc. You...
Question 673: Which of the following is TRUE about IRR?...
Question 674: A product life cycle is a series of phases whose name and nu...
Question 675: Which task is on schedule with a cost variance of $0?...
Question 676: Which of the following statements are FALSE regarding CPM me...
Question 677: You are the project manager for a construction company. You ...
Question 678: Receivers in the communication model filter their informatio...
Question 679: If your expected value is 110 and the standard deviation is ...
Question 680: Which of the following are inputs to the close project proce...
Question 681: Life cycle costing:
Question 682: Which of the following is not a project?...
Question 683: What are the performance measurements for the Schedule Contr...
Question 684: Earned value analysis is performance reporting tools used in...
Question 685: Which task is most over budget?...
Question 686: What is the total slack for the following project? Exhibit: ...
Question 687: Which of the following is not a tool or technique used durin...
Question 688: You are the project manger at a biotech company, where you a...
Question 689: Please refer to the diagram given below: (all units are in d...
Question 690: Which of the following techniques may NOT be used to a proje...
Question 691: Which is NOT an input to the Create WBS process?...
Question 692: Your project has experienced some changes to the agreed-upon...
Question 693: The following reports are normally developed during the proj...
Question 694: Scoring methods,Comparative methods and economic and cash fl...
Question 695: Which of the following can be used to display the assigned r...
Question 696: A document or tool which describes when and how human resour...
Question 697: A line manager who is asked to wear two hats and function as...
Question 698: There have been several rounds of layoffs at your company. N...
Question 699: For doing Quality Planning, you are going to use Design of E...
Question 700: What is the main output of the Scope Definition process?...
Question 701: Which of the following statements are FALSE regarding Bidder...
Question 702: Which of the following statements is true regarding schedule...
Question 703: A non-critical path activity is completed in half the time. ...
Question 704: The Conflict resolution method that should be used when ther...
Question 705: Which of the following is not true about project planning me...
Question 706: Which of the following are true regarding statistical perfor...
Question 707: Which of the following is CORRECT?...
Question 708: Which of the following items is required when developing a d...
Question 709: You have determined that a design error will interface with ...
Question 710: Which of the following represents the MOST important criteri...
Question 711: You are working on a construction project. You, your team, a...
Question 712: Tom is the project manager on a construction project. Midway...
Question 713: You are the project manager for a software company that deve...
Question 714: Which is not part of the Earned Value calculations?...
Question 715: You are the project manager for a cable service provider. Yo...
Question 716: All of the following knowledge area process do NOT have proc...
Question 717: One of your friends is a project manager at a computer secur...
Question 718: Two of the types of discretionary dependencies that typicall...
Question 719: An informal communication network on a project and within an...
Question 720: You have been recently been assigned to provide an accurate ...
Question 721: Which of the following best describes fast-tracking?...
Question 722: Project information can be shared by tam members and stakeho...
Question 723: Which of the following does not form part of Project Procure...
Question 724: Which of the following is not done in Initiation phase?...
Question 725: With respect to management planning, timing defines how ofte...
Question 726: The schedule risk is the _____ ....
Question 727: You are the project manager for a new website for the local ...
Question 728: Control chart theory is based on the differentiation of the ...
Question 729: Quality control charts show a characteristic of the product ...
Question 730: When the project team directs staff assignments, what is not...
Question 731: Project mangers often refer to a project's triple constraint...
Question 732: Where would you document a change that was approved when the...
Question 733: Forcing, as a means to manage conflict:...
Question 734: During the schedule development process the Project Manager ...
Question 735: Which of the following best describes the difference between...
Question 736: Which of the following statements are FALSE regarding recogn...
Question 737: In your project, you are trying to identify lessons learned ...
Question 738: Which of the following statements are true regarding proposa...
Question 739: Which of the following statements are true?...
Question 740: When are the most expensive defects most likely to be introd...
Question 741: Which of the following calculates the difference between the...
Question 742: Who has MOST power in PROJECTIZED organization?...
Question 743: Which of the following statements are true regarding risk re...
Question 744: Which of the statements regarding the WBS is FALSE?...
Question 745: You are currently in the marker for the new car. You are deb...
Question 746: Which of the following is not a tool or technique of the Per...
Question 747: The Work Breakdown Structure (WBS) is the basis for communic...
Question 748: A project Manager has to manage conflict in an organization....
Question 749: All the following statements relating to transferring of ris...
Question 750: Which of the following represents the reason why post-contra...
Question 751: Which of the following statements concerning a scope stateme...
Question 752: When a project incorporates an Organizational Breakdown Stru...
Question 753: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 754: Creating Work Breakdown Structures (WBS) is very helpful in ...
Question 755: Micheal is a self employed PMP certified project manager who...
Question 756: Which of the following is not a scope management process?...
Question 757: Consider the project integration management knowledge area. ...
Question 758: Which is not part of Performance Measurements?...
Question 759: You are the project manager for a software company that deve...
Question 760: Which of the following documents is not used as input for pr...
Question 761: What is one of the advantages of a functional organization?...
Question 762: Your company policy allows accepting gifts from customer wit...
Question 763: If you are project manager, After a change request has been ...
Question 764: Obtaining team commitment depends on:...
Question 765: Name the ethical code you'll be required to adhere to as a P...
Question 766: A team member notifies the project manager that the activiti...
Question 767: You are project manager for a project. This project was orig...
Question 768: The project charter is a document designed to tell _____ exa...
Question 769: The type of contract (payment mechanism) chosen for a projec...
Question 770: Cost of quality includes:
Question 771: Deflection involves the transfer of risk by:...
Question 772: What is the document that gives the PM the authority to appl...
Question 773: _____ best describes the goal of a project in its relationsh...
Question 774: You are developing the project scope statement for a new pro...
Question 775: Which of the following best describes the project integratio...
Question 776: Part of being a project manager involves dealing with confli...
Question 777: You have just completed the project planning process group a...
Question 778: Which of the following statements regarding configuration ma...
Question 779: According to Bruce Tuckmann, which are the stages of team de...
Question 780: Your lead engineer estimates that a work package will most l...
Question 781: A contingency plan is:
Question 782: A project manager is faced with two team members who have co...
Question 783: Which of the following is not a cost of non-conformance?...
Question 784: In a sender-receiver model, all the following are true excep...
Question 785: You are managing a software engineering project. Your team i...
Question 786: Which of the following are examples of indirect costs?...
Question 787: Which of the following is NOT a characteristic of message fi...
Question 788: The basic elements of communication include:...
Question 789: Which of the following is not true about the Project Charter...
Question 790: What is the purpose of a Preliminary scope statement?...
Question 791: You are running a project to develop the production process ...
Question 792: You are the project manager at a construction company. Your ...
Question 793: The Cost Performance Index (CPI) measures:...
Question 794: Which of the following statement regarding WBS are true?...
Question 795: The primary communication skills you will use in working wit...
Question 796: Continually measuring and monitoring the actual cost versus ...
Question 797: Assigning resources in an attempt to find the shortest proje...
Question 798: Which types of Organizational Charts can be best used to tra...
Question 799: Which is not an example of formal communication?...
Question 800: You are a project manager responsible for constructing a new...
Question 801: Which of the following best describes resource leveling?...
Question 802: Which of the following statements regarding Resource Breakdo...
Question 803: Integrate change control includes the following activities E...
Question 804: The Cost Performance Index (CPI) measures...
Question 805: As a Project Manager on replacing 2 miles of sewer pipe part...
Question 806: Inputs to scope definition include...
Question 807: A RAM is:
Question 808: The work that must be done in order to deliver a product wit...
Question 809: You are the project manger at a software company developing ...
Question 810: What are the Scope Definition process tools and techniques?...
Question 811: You are a project manager working in a foreign country. You ...
Question 812: Which of the following is not a technology factor that may a...
Question 813: Which of the following objectives is LEAST likely accomplish...
Question 814: A graphic display of resource usage hours is:...
Question 815: Which of the following best describes a form of progressive ...
Question 816: You have been recently assigned to provide an accurate proje...
Question 817: A cost-plus-incentive-fee (CPIF) contract has an estimated c...
Question 818: A project manager believes that the best way to manage is to...
Question 819: The project scope/charter baseline includes:...
Question 820: You are using three point estimating technique to estimate t...
Question 821: As project manager, you wish to impose a standard method by ...
Question 822: Crashing describes a technique to speed up a project by......
Question 823: Ishikawa diagrams are used in which of the following process...
Question 824: Information typically required to determine project communic...
Question 825: You are the Project Manager for a company doing research on ...
Question 826: How much time does the typical project manager spend communi...
Question 827: The project manager for a construction project discovers tha...
Question 828: CORRECT TEXT During Planning processes, you used Monte-Carlo...
Question 829: Using the chart, what is the lowest cost of crashing this pr...
Question 830: Michael works as a project manager at the construction compa...
Question 831: The SPI, which is used to estimate project completion date, ...
Question 832: Which of the following processes serve as inputs to each oth...
Question 833: You are a project manager responsible for constructing a new...
Question 834: Cost estimating:
Question 835: Which of the following quality improvement approaches is LEA...
Question 836: In planning your resources for a new building project you ar...
Question 837: During execution of your project plan, you discover that a t...
Question 838: Which of the following statements are FALSE?...
Question 839: Budgetary estimates are the output of the _____ phase(s) of ...
Question 840: The Monitor and Control Project Work process is performed to...
Question 841: The overall duration of the project schedule is not influenc...
Question 842: Which of the following is true regarding the project charter...
Question 843: You are the project manger at an advertising firm that speci...
Question 844: All of the following are considered schedule network analysi...
Question 845: The scope of a project can be expected to change if:...
Question 846: All of the following are categories of a milestone in a sche...
Question 847: All the following are tools and techniques for organization ...
Question 848: The three most common types of project cost estimates are:...
Question 849: A contingency plan is executed when:...
Question 850: Quality Improvement Programs are normally associated with wh...
Question 851: Inspections are also called each of the following except for...
Question 852: You are a project manager working on contract. You've perfor...
Question 853: The behavioral responsibilities of a project manager may als...
Question 854: Proposals are seller prepared documents that describe the se...
Question 855: General management encompasses:...
Question 856: The items at the lowest level of the WBS are called...
Question 857: All of the following are true regarding Communications Plann...
Question 858: All of the following statements are true regarding the Activ...
Question 859: Smoothing out resource requirements from period to period is...
Question 860: You are the project manager for the development of a new typ...
Question 861: When should the project manager be assigned?...
Question 862: You are the project manager at a financial services company....
Question 863: The degree to which written policies, procedures, rules, and...
Question 864: Team members want to work for a project manager that can pro...
Question 865: Management calls a meeting to explain to all employees the n...
Question 866: According to the PMI which of the following is considered as...
Question 867: Which of the following LEAST likely describes a weighting sy...
Question 868: Please refer to the exhibit. Which of the following describe...
Question 869: Which of the following results are Win/Win conflict resoluti...
Question 870: Which of the following is an output of Verify Scope?...
Question 871: Which of the following statements about fast-tracking is TRU...
Question 872: Which of the following are NOT outputs of the Information Di...
Question 873: Most project (and non-project) managers prefer _____ communi...
Question 874: Which of the following process is not included in project co...
Question 875: A computer tape which contains historical project informatio...
Question 876: Trend Analysis is performed using ______....
Question 877: You are in the middle of a major new facility construction p...
Question 878: Lessons learned are most often based upon project historical...
Question 879: Cost and schedule data are usually integrated because:...
Question 880: All of the following may hinder a person's ability to transm...
Question 881: In your project, you are creating a diagram that describes t...
Question 882: You are the project manager of a company that is building AT...
Question 883: At what stage in the project life cycle would costs be the l...
Question 884: You are the project manager for the international contract m...
Question 885: You are working on a project that was proceeding well until ...
Question 886: Risk mitigation includes all but which of the following:...
Question 887: The main difference between the two types (ADM and PDM) of t...
Question 888: In project management, Work authorization is normally not......
Question 889: Contract documentation is an input to the Contract Closure P...
Question 890: Risk exposure refers to _____ ....
Question 891: The Preliminary Scope Statement which is and output of the D...
Question 892: You are a project manager for Picture Shades, Inc. It manufa...
Question 893: You have been informed by the project sponsor that there has...
Question 894: 3 major processes in Project HRM...
Question 895: All the following are advantages of GERT (Graphical Evaluati...
Question 896: Steps in effective goal setting are:...
Question 897: Which of the following is NOT included in the project scope ...
Question 898: While doing risk response planning, you realize that there i...
Question 899: Which of the following statements are FALSE?...
Question 900: How should change management be planned for?...
Question 901: There are four general classes of products that the purchasi...
Question 902: The engineering department has just reported that a small pl...
Question 903: You are a project manager at day-old donuts, a rapidly growi...
Question 904: The project manager notices that project activities being co...
Question 905: High level project constraints are determined during the ___...
Question 906: Which of the following project would be BEST project to sele...
Question 907: A Work Breakdown Structure numbering system...
Question 908: You are the project manager at an auto manufacturer. Due to ...
Question 909: You are in the process of identifying and documenting projec...
Question 910: Which of the following is neither a tool nor a technique for...
Question 911: Which of the following is the correct order of actions that ...
Question 912: Which of the following best describes the calculations of la...
Question 913: Which of the following statements about fast-tracking is TRU...
Question 914: Rekha is a project manager on a large construction project. ...
Question 915: You are involved in monitoring specific project results to d...
Question 916: Which of the following would most likely not be an essential...
Question 917: Which of the following statements are true regarding the pro...
Question 918: All of the following are another terms of bidder conferences...
Question 919: What does a benefit-cost ratio of 3.22 indicate?...
Question 920: You are a project manager at a large accounting firm in Unit...
Question 921: Processes of Configuration management do in general not incl...
Question 922: Inputs to procurement planning include...
Question 923: All of the following are inputs to the Direct and /manage Ex...
Question 924: You are working on a project and discover that one of the bu...
Question 925: You are the project manager for the company that sells onlin...
Question 926: Cost control is concerned with:...
Question 927: The customer has decided that he wants blue walls instead of...
Question 928: A scope change is:
Question 929: Which of the following statements are true regarding the pro...
Question 930: Which of the following terms refers to the situation where t...
Question 931: Which of the following scheduling techniques focuses on mana...
Question 932: Obtaining formal project plan approval and sign-off is impor...
Question 933: Which of the following is a KEY output of the Verify Scope p...
Question 934: You have been hired as a contract project manger for Grapevi...
Question 935: Input into the Communications Management Plan includes the f...
Question 936: A planning phase for an engineering component generated 100 ...
Question 937: Which of the following are characteristics of a purchase ord...
Question 938: Contract documentation is an input to both the Close Project...
Question 939: Which of the following statements are FALSE regarding the re...
Question 940: Which knowledge area involves organizational theory as a too...
Question 941: Joe is a project manager on an industrial design project. He...
Question 942: Which of the following is NOT part of stakeholder's manageme...
Question 943: Pure Risk differs from Business Risks because Pure Risk's __...
Question 944: Which of the following is a formal invitation that requests ...
Question 945: The most common form of organizational communication is...
Question 946: All the following are examples of Constrained Optimization e...
Question 947: To determine what causes the majority of quality problems in...
Question 948: With triangular distribution, the low, likely and high value...
Question 949: When preparing the probability distribution of cost outcomes...
Question 950: Coordinating changes across knowledge areas is a function of...
Question 951: A manager works very closely with his subordinates to create...
Question 952: Which of the following is true?...
Question 953: Which of the following best describes the Achievement Theory...
Question 954: Which of the following statements are FALSE regarding expect...
Question 955: There are some costs like legal costs or insurance costs are...
Question 956: Which of the following can result in misinterpretation of th...
Question 957: Which of the following statements are true regarding GERT?...
Question 958: The unique identifiers assigned to each item of a WBS are of...
Question 959: Which of the following types of contracts allows the owner t...
Question 960: You are a project manager for Dakota Software Consulting Ser...
Question 961: Which of he following best describes the risks that still re...
Question 962: Change requests are made against the ____________?...
Question 963: The process of identifying which products or services can be...
Question 964: Which of the following statement related to Standards and Re...
Question 965: Fragment network area term used in reference with which of t...
Question 966: Risks that remain after avoidance, transfer and mitigation a...
Question 967: Which of the following describes the longest path through a ...
Question 968: Non-verbal communication includes:...
Question 969: You are defining evaluation criteria for your project. The p...
Question 970: A tool which links the project roles and responsibilities to...
Question 971: You are managing a project with AC = $25,100, ETC = $45,600,...
Question 972: Which contract type consists of - target costs &amp; profit,...
Question 973: You are in the process of controlling changes to the project...
Question 974: A communicator can present information using the following m...
Question 975: The project management executing processes include all of th...
Question 976: Which is not input to Define Activities:...
Question 977: Which of the following statements is true regarding PDM (pre...
Question 978: A deficiency in characteristics that render the quality of t...
Question 979: You are the project manager at a large automaker in Japan. Y...
Question 980: You are in the process of controlling changes to the project...
Question 981: You are managing a software project. The stakeholders have f...
Question 982: Risk Management Plan may include:...
Question 983: The review of key deliverables and project performance at th...
Question 984: A WBS dictionary is a document which......
Question 985: Which of the following statements are true regarding funding...
Question 986: The project manager must be concerned with building a closel...
Question 987: Which of the following statements are true regarding random ...
Question 988: An input to the scope change control process is:...
Question 989: You are currently in the closing process and are involved in...
Question 990: A project is defined in the PMBOK as:...
Question 991: A Work Breakdown Structure provides a framework from which a...
Question 992: You are in the process of monitoring the various project pro...
Question 993: Brandi is a project manager on a software project. About hal...
Question 994: Which of the following are NOT described in the PMI's Member...
Question 995: The best way to insure quality conformance is to _____....
Question 996: The "Cost of quality" project management concept includes __...
Question 997: You are being hired to manage a highway construction project...
Question 998: You are in the process of controlling changes to the project...
Question 999: Paraphrasing is most closely associated with which part of t...
Question 1000: You are the project manager for a cable service provider. Yo...
Question 1001: You are the project manager for BB Tops, a nationwide toy st...
Question 1002: Your project team is in the process of identifying project r...
Question 1003: With respect to risk management, which of the following stat...
Question 1004: You are a project manager for a software project. Your team ...
Question 1005: Percent complete is calculated by:...
Question 1006: The cost baseline is an output of what process?...
Question 1007: You need a batch of 100 identical valves which will be custo...
Question 1008: Which of the following statements are true regarding project...
Question 1009: Many companies self insure against some risk. Problems which...
Question 1010: You know that PV = 470, AC = 430, EV = 480, EAC = 500, and B...
Question 1011: Your spouse works for a vendor and the vendor bidding on a p...
Question 1012: A project underwent a major Scope change, which increased co...
Question 1013: In your last project status meeting, you had 15 team members...
Question 1014: Which of the following statements are true regarding proposa...
Question 1015: The critical path in a schedule network is the path that:...
Question 1016: Poor allocation of time and resources and inadequate quality...
Question 1017: Which of the following is generally not regarded as an eleme...
Question 1018: You are the project manager for an information technology di...
Question 1019: All of the following statements about acceptance sampling ar...
Question 1020: The outputs of Contract Administration are correspondence, c...
Question 1021: You have been recently hired to be a project manager at a bi...
Question 1022: When is passive risk acceptance an appropriate approach?...
Question 1023: You are a project manager in a matrix organization. All of t...
Question 1024: The planned cost for the total project at its inception is c...
Question 1025: Which of the following is NOT included in a cost of quality ...
Question 1026: A project manager discovers an urgent need for outsourced re...
Question 1027: Which of the following is displayed as an S curve?...
Question 1028: What are decision models?
Question 1029: You are in the process of making information available to pr...
Question 1030: The formal invitation to submit a price for specified goods/...
Question 1031: Which of the following statement are FALSE regarding the pro...
Question 1032: In your project, you have designated a group of people to mo...
Question 1033: The primary communication skills you will use in working wit...
Question 1034: Who can apply the project selection methods to decide whethe...
Question 1035: You are an information security project manager responsible ...
Question 1036: You are project manager of ABC company and you have to choos...
Question 1037: Which of the following is an input of scope change control?...
Question 1038: Which is the most important element of Project Management Pl...
Question 1039: Which of the following defines, the procedures by which the ...
Question 1040: Who is the stakeholder of the project?...
Question 1041: All of the following statements re true regarding contract n...
Question 1042: Common causes of variances are a result of all of the follow...
Question 1043: All of the following are true regarding configuration manage...
Question 1044: The process of Manage Stakeholder Expectations is part of wh...
Question 1045: 2 people are arguing about what needs to be done to complete...
Question 1046: A project element which lies between two events is called:...
Question 1047: The project Network Diagram is an input to what process?...
Question 1048: The work breakdown structure which is an output of scope def...
Question 1049: What are the 5 kinds of power?
Question 1050: Which is the best thing to do during the Source Selection pr...
Question 1051: You are the project manager within an information technology...
Question 1052: You have been assigned to a project to construct a 18-hole g...
Question 1053: which of the following best describes the request seller res...
Question 1054: Which of the following is true about procurement documents?...
Question 1055: A project has seven activities: A, B, C, D, E, F, and G. Act...
Question 1056: Before reporting a perceived violation of an established rul...
Question 1057: A unilateral contract under which the seller is paid a prese...
Question 1058: During closeout, many project managers tend to delay personn...
Question 1059: Inputs into Resource Planning include:...
Question 1060: Management reserve is needed on projects. According to the P...
Question 1061: You are the project manager for Insomniacs International. Si...
Question 1062: Which of the following processes uses the approved project s...
Question 1063: This measurement is the value of the work that has been comp...
Question 1064: Response development is sometimes referred to as...
Question 1065: Risk identification should be done...
Question 1066: A comparison of completion status to baseline is referred to...
Question 1067: A Schedule Management Plan is developed in which of the foll...
Question 1068: Which of the following statements are false regarding cost a...
Question 1069: Your project les need to be sent via overnight mail to your ...
Question 1070: One of the outputs of risk identification is...
Question 1071: Who is going to issue project charter?...
Question 1072: You are in the process of reviewing offers and choosing amon...
Question 1073: Which of the following documents generated by the create WBS...
Question 1074: In small companies, project managers and line managers are:...
Question 1075: Approved changes are implemented in which process?...
Question 1076: You are the project manager for a company that sells online ...
Question 1077: Change control system, variance analysis, replanning and con...
Question 1078: A proven effective means to insure quality conformance is to...
Question 1079: All of the following are outputs the closure project process...
Question 1080: All of the following are correct statements about a project ...
Question 1081: Which of the following relationships is used in Arrow Diagra...
Question 1082: In general, groups will ____ the average individual problem ...
Question 1083: You are in the process of defining activities that need to b...
Question 1084: Which of the following processes involves analyzing activity...
Question 1085: Which of the following statements are NOT true regarding cor...
Question 1086: You are using the three-point estimating technique to estima...
Question 1087: Cost forecasting calculations include:...
Question 1088: Which of the following is the correct order of the Monitorin...
Question 1089: Who has MOST of the power in strong matrix organization?...
Question 1090: Which of the following statements are FALSE regarding projec...
Question 1091: Which type of bilateral contract is used for high dollar, st...
Question 1092: You are project manager for a project with a multi-million v...
Question 1093: Quality assurance
Question 1094: All of the following are inputs to the quality process EXCEP...
Question 1095: All of the following are inputs to the Close Project process...
Question 1096: In a country with high level of violence in public, a local ...
Question 1097: All of the following are tools of Perform Quality Control EX...
Question 1098: Your goal as a project manager is to manage stakeholders to ...
Question 1099: You are the project manager assigned to construct a new 10-s...
Question 1100: Which of the following best describes cost incurred in the p...
Question 1101: Schedule model data, which is an input of the schedule devel...
Question 1102: In order to let the project sponsor know the percentage of c...
Question 1103: A project plan generally includes the following:...
Question 1104: Which performance measurement tells us how much more of the ...
Question 1105: You have identified an opportunity to potentially increase t...
Question 1106: To accommodate a new project in your department, you need to...
Question 1107: Quality management deals with all of the following except:...
Question 1108: The initial cost of a product and the product's operation an...
Question 1109: The amount of time that an activity can be delayed from its ...
Question 1110: Which of the following risks are generally considered unpred...
Question 1111: Which of the following tools and techniques of the Select Se...
Question 1112: Consider the project integration management knowledge area. ...
Question 1113: In reviewing your earned value reports you notice that your ...
Question 1114: Which of the following statements are true regarding bar cha...
Question 1115: Which technique would you be using if you analyze which sequ...
Question 1116: Which of the following are NOT tools/ techniques of the Plan...
Question 1117: A program is:
Question 1118: Work performance information is an input to Cost Control pro...
Question 1119: You know that BAC = 500, PV = 325, ACC = 275, CPI = .9, and ...
Question 1120: Which of the following are NOT outputs of the activity durat...
Question 1121: The following individuals are responsible for determining th...
Question 1122: All of the statements are true regarding Analogous Estimatio...
Question 1123: You are the project manger at a utility company. Due to the ...
Question 1124: Which of the following best describes secondary risks?...
Question 1125: An activity-on-node (AON) network diagram shows the followin...
Question 1126: You are in the process of painting your house. Since you do ...
Question 1127: The most common non-behavioral reason for projects being com...
Question 1128: When there is uncertainty associated with one or more aspect...
Question 1129: Which of the following control types has the highest risk to...
Question 1130: Which of the following statements are false regarding projec...
Question 1131: Which of the following is not an input to overall change con...
Question 1132: All of the following statements are true regarding the reque...
Question 1133: The principles of risk management should be followed only fo...
Question 1134: _____________ includes the process required to ensure that t...
Question 1135: You are evaluating several different motivational strategies...
Question 1136: Being the project manager in a high risk electronics project...
Question 1137: Management plans include all of the following except:...
Question 1138: Which of the following BEST describes the main purpose of th...
Question 1139: Project alternatives are examined during the _____ phase of ...
Question 1140: Create Procurement document is done in _______....
Question 1141: Which of the following project management areas contains the...
Question 1142: Managers who adopt a sound, but prudent managerial style are...
Question 1143: You are working in the Project Office of your organization. ...
Question 1144: The administrative closure procedure is an output of the clo...
Question 1145: The accounting head asks an assistant to cut the payroll che...
Question 1146: You are a project manager of Software Product Company. After...
Question 1147: You are in the process of estimating the number of work peri...
Question 1148: You are a contract project manager for a wholesale flower di...
Question 1149: Which of the following situations will cause schedule activi...
Question 1150: There are three outputs that are common to scope, schedule a...
Question 1151: You are currently performing the Select Sellers process. You...
Question 1152: You are working with XYZ organization and all the employees ...
Question 1153: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 1154: Perhaps the biggest problem facing the project manager durin...
Question 1155: You work at RFID-PM Inc, a publicly traded company that deve...
Question 1156: You have assembled your thoughts into a message. As you pass...
Question 1157: Which of the following is most closely associated with busin...
Question 1158: The duration of most activities will be significantly influe...
Question 1159: The duration of most activities will be significantly influe...
Question 1160: Which of the following is NOT a valid reason to authorize a ...
Question 1161: You are currently analyzing the schedule of a project. You h...
Question 1162: Using Force field analysis to monitor and control how attrib...
Question 1163: Earned value analysis is a performance reporting tool/ techn...
Question 1164: You are in the process of controlling changes to the project...
Question 1165: Which of the following statements are true regarding decisio...
Question 1166: What are extrinsic motivators?
Question 1167: You are the project manager for a railroad construction proj...
Question 1168: Roger works for a manufacturer of automotive engines. He has...
Question 1169: Activity Resource Requirements is an input to ____________:...
Question 1170: Which of the following BEST describes the procedures by whic...
Question 1171: You are a project manager for Laredo Pioneer's Traveling Rod...
Question 1172: The main objective of providing incentives in contracts is t...
Question 1173: Project Risk _____ .
Question 1174: You are in the process of identifying and documenting the pr...
Question 1175: Inputs to Administrative Closure include all of the followin...
Question 1176: Examples of team building activities include:...
Question 1177: Project team building is most difficult in which type of env...
Question 1178: Adjusting Leads and Lags is a technique for:...
Question 1179: As a project nears completion, you notice that the functiona...
Question 1180: If a project manager communicates a verbal message to a subo...
Question 1181: You are a project manager for Dutch Harbor Consulting. Your ...
Question 1182: Which of the following is not one of the five project manage...
Question 1183: You are a project manager of ABC company and working on gath...
Question 1184: According to the PMI, who should develop the project charter...
Question 1185: The comprehensive review of a contractor's technical perform...
Question 1186: A customer requires from you a minor scope change and expect...
Question 1187: Which of the following statements are false regarding reward...
Question 1188: Which of the following statements are TRUE regarding compara...
Question 1189: Which enterprise environmental factor defines how work is as...
Question 1190: Outputs from response development could include all except?...
Question 1191: Scope planning includes alternatives identification, which c...
Question 1192: Constructive team roles include:...
Question 1193: Which of the following shows roles and responsibilities on y...
Question 1194: Which of the following statements are NOT techniques used to...
Question 1195: Which of the following statements re true regarding Bidder C...
Question 1196: Which of the following inputs belongs to Resource Planning?...
Question 1197: Which of the following is the BEST example of a reward syste...
Question 1198: In the first attempt in resource leveling the project schedu...
Question 1199: You're managing an industrial design project. Your project i...
Question 1200: All of the following are types of strategies that one can us...
Question 1201: Which of the following is NOT an example of a type of schedu...
Question 1202: Your company has asked you to be the project manager for the...
Question 1203: You are a project manager working on contract with a company...
Question 1204: Assignable cause or special variation is:...
Question 1205: Which of the following statements are true regarding the dif...
Question 1206: Ensuring that all work is both authorized and funded by cont...
Question 1207: Critical input to scope initiation is:...
Question 1208: Failure costs are also known as which of the following?...
Question 1209: Product verification is usually performed in the closing pro...
Question 1210: The engineering department has raised a question about the e...
Question 1211: Keeping up with the growth was becoming a problem for a priv...
Question 1212: Who is responsible for decide project management process for...
Question 1213: You are a project manager for Pizza Direct, which is a retai...
Question 1214: The most effective means of determining the cost of a projec...
Question 1215: During what phase of project lifecycle is the level of risk ...
Question 1216: Which of the following statements are true regarding cost an...
Question 1217: Cost aggregation, reserve analysis, funding limit reconcilia...
Question 1218: Your team has prepared a CPM schedule for your review. You n...
Question 1219: During an informal discussion you had with another PMP, he m...
Question 1220: Make or buy decisions are usually made during the _____ phas...
Question 1221: During the planning phase of a project, you realize that mor...
Question 1222: A project manager tracks the work of team members using a ne...
Question 1223: All of the following statements are true except:...
Question 1224: Which of the following is NOT found in a project charter?...
Question 1225: In taking over a failing project you hold a status meeting a...
Question 1226: Which of the following statements are false?...
Question 1227: A regulation is a document that lays down provisions with wh...
Question 1228: You are currently in the process of prioritizing risks by th...
Question 1229: You are the project manger at a software company developing ...
Question 1230: You are in the process of estimating the number of work peri...
Question 1231: Considering alternate suppliers is a form of _____....
Question 1232: Theory Y managers believe which of the following?...
Question 1233: Which of the following is not a method for acquiring team me...
Question 1234: Your organization discusses running a project which will ent...
Question 1235: Which of the following is NOT a stakeholder?...
Question 1236: Your stakeholders have asked for an analysis of the cost ris...
Question 1237: You are the project manger at a leading manufacturer of cons...
Question 1238: You are the project manager for Design Your Web Site, Inc. Y...
Question 1239: You are the project manager at a manufacturer of electronic ...
Question 1240: The project manager has the greatest influence over quality ...
Question 1241: You are in the contract Closure process and are reviewing th...
Question 1242: In communication, which of the following is not a responsibi...
Question 1243: You are currently the project manager for a software develop...
Question 1244: The core planning processes include:...
Question 1245: The contingency allowances established to cover unforeseen c...
Question 1246: All of the following statements are true regarding the criti...
Question 1247: You know that the next status meeting will require some disc...
Question 1248: You are managing a software engineering project, when two te...
Question 1249: In a matrix organizational form, MBO may be difficult to imp...
Question 1250: During project execution, a line manager informs you that he...
Question 1251: Project cash reserves are often used for adjustment in escal...
Question 1252: All of the statements are false regarding variance analysis?...
Question 1253: As project manager, which of the following activities most d...
Question 1254: Your project management software always allocates scarce res...
Question 1255: Which of the following planning considerations is often over...
Question 1256: Each Organization measures project team performance in its o...
Question 1257: You are managing a project with a total budget of $450,000. ...
Question 1258: Which of the following best describes the conflict that aris...
Question 1259: An Activity has an Optimistic estimate of 10 days, pessimist...
Question 1260: The terms strong matrix, balanced matrix, and weak matrix wh...
Question 1261: You are in process of developing an approximation of the cos...
Question 1262: Your company manufactures CPU for high-end workstation compu...
Question 1263: Which of the following is not a project?...
Question 1264: The __________ is a document which describes how the project...
Question 1265: Which of the following best describes the expectancy theory ...
Question 1266: Which of the following is the BEST thing to do at a bidder c...
Question 1267: Amount at Stake is the _____ .
Question 1268: Negotiation, pre assignment, and acquisition are tools and t...
Question 1269: For the following group of numbers, 80, 10, 10, 50, 70, and ...
Question 1270: Which of the following statements are TRUE regarding the sco...
Question 1271: To identify which quality standards are relevant to a projec...
Question 1272: The most precise or accurate estimate for determining projec...
Question 1273: Which of the following scheduling techniques incorporates a ...
Question 1274: Which f the following processes involves determining and doc...
Question 1275: Contract close out contains:
Question 1276: Which of the following represents the MAIN function of the c...
Question 1277: You expect the types of variances that have occurred on the ...
Question 1278: Which of the following forecasts the most likely total proje...
Question 1279: Which of the following is not a measure of the profitability...
Question 1280: In your construction project, the CPI is 1.30 and SPI is 0.8...
Question 1281: Researching, organizing and recording pertinent information ...
Question 1282: The performance review interview is a vital component of any...
Question 1283: You have recently been named as the project manager of a new...
Question 1284: Which of the following are outputs of the Develop Project te...
Question 1285: Which of the following statements are FALSE regarding Projec...
Question 1286: All the following statements about float are correct except:...
Question 1287: Project managers spend what percentage of their time communi...
Question 1288: You are a project manager for Cinema Snicker Productions. Yo...
Question 1289: You are the project manager in the I.T department of major h...
Question 1290: Project execution is very much an integrative process whereb...
Question 1291: Which statement describes best the purpose of the Communicat...
Question 1292: Earned value analysis is a performance reporting tool/ techn...
Question 1293: You work as project manager at a beauty products company. On...
Question 1294: Project Integration Management
Question 1295: According to John R. Adams Ph.D., there are five sources of ...
Question 1296: Clearly defined group goals are important because they _____...
Question 1297: Which performance measurement tells you how much more of the...
Question 1298: The first step in building a PERT/CPM network is to:...
Question 1299: Quantitative assessment(s) of the likely costs of the resour...
Question 1300: A project schedule can be presented in various formats. All ...
Question 1301: You are currently the project manager for a software develop...
Question 1302: Resource leveling allocates scarce resources to critical pat...
Question 1303: Two of your project team members approach you with a conflic...
Question 1304: Product acceptance criteria should be laid down in which doc...
Question 1305: What is Benefit cost ratio (BCR)?...
Question 1306: You are the project manager at a large automaker in Japan. Y...
Question 1307: Amit is the manager of a software project. His client has ag...
Question 1308: You are managing a construction project that is currently be...
Question 1309: At the beginning of a project you are asked for an order of ...
Question 1310: 40. During which process is the Cost baseline developed?...
Question 1311: Michael works as a project manager at a construction company...
Question 1312: As you are executing your project you are constantly checkin...
Question 1313: A project manager disclosed some crucial information to a pr...
Question 1314: To determine whether or not the employee correctly understan...
Question 1315: Which is a technique for Define Activities?...
Question 1316: Executing the risk response plan in order to react to risk e...
Question 1317: You are in the process of establishing a total cost baseline...
Question 1318: The project charter:
Question 1319: The risk monitoring and control process involves all of the ...
Question 1320: Which of the following is not considered a cost of nonconfor...
Question 1321: A project manager is reporting the final status of the close...
Question 1322: Which of the following are part of the purchasing cycle:...
Question 1323: The monitor and control project work process is performed to...
Question 1324: You are in the process of controlling changes to the project...
Question 1325: You are the project manager for a large children's toys manu...
Question 1326: Which of the following is typically displayed as a S-shaped ...
Question 1327: You are the project manager for a company that sells online ...
Question 1328: Which of the following is not an input to cost budgeting?...
Question 1329: Which of the following is false regarding recognition and re...
Question 1330: A company is about to begin work on a large construction pro...
Question 1331: The act of conducting or supervising the exchange of informa...
Question 1332: Sensitivity analysis can be used in risk analysis to:...
Question 1333: Using visual aids during management/customer presentations w...
Question 1334: You are the project manager for a construction company that ...
Question 1335: Which of the following statement are false?...
Question 1336: You know that BAC = 500, PV = 325, ACC = 275, and EVC = 250 ...
Question 1337: The Pareto Principle is a technique used to determine which ...
Question 1338: You are the project manager responsible for developing a new...
Question 1339: Which is not an activity attribute:...
Question 1340: Valid reasons for considering termination of a project inclu...
Question 1341: The WBS usually:
Question 1342: What involves determining what quantities are to be used to ...
Question 1343: In project communications, the sender is responsible for:...
Question 1344: Which of the following is a common characteristic of most pr...
Question 1345: A project team member has been having a big disagreement wit...
Question 1346: As a PMP, you are required to comply with the PMP Code of Pr...
Question 1347: Collocation can mean:
Question 1348: A warranty may not be a remedy for products delivered unfit ...
Question 1349: A lessons learned is BEST completed by:...
Question 1350: A WBS provides a framework from which all of the following c...
Question 1351: All the following are examples of product documentation exce...
Question 1352: Your project has a virtual team. Half of your team members a...
Question 1353: A review of your project team member's most recent performan...
Question 1354: In Project Risk Management, Risk Response may include action...
Question 1355: All of the following are true regarding change control syste...
Question 1356: Following are various outputs. Which output is a consequence...
Question 1357: All of the following statements are true regarding the commu...
Question 1358: Which of the following statements are true regarding project...
Question 1359: Which of the following are not inputs to the develop prelimi...
Question 1360: Project Cost Management Plan is created as a part of:...
Question 1361: Given the following estimates: Optimistic 3 days, Pessimisti...
Question 1362: You are a project manager at an utility company. Due to the ...
Question 1363: A project is defined as:
Question 1364: Complete the following sentence: "The later a defect is foun...
Question 1365: You are the project manager for the manufacturer of children...
Question 1366: What document contains the following: type of contract to be...
Question 1367: Project management/project planning is most closely aligned ...
Question 1368: While project work is being done, conflicts can arise betwee...
Question 1369: A quality control manager decides to increase his daily samp...
Question 1370: All of the following are types of strategies that one can us...
Question 1371: Risk management methodology should be adhered to in:...
Question 1372: Which is not correct about initial phase of a project?...
Question 1373: Outputs from the Initiation process include:...
Question 1374: Risk management is defined as the art and science of _____ r...
Question 1375: Your organization shifting from weak matrix organization to ...
Question 1376: Management decision-making includes:...
Question 1377: A life cycle project manager tends to have the following cha...
Question 1378: Which is not a tool or technique for Source Selection?...
Question 1379: You are the project manager of a company that is building AT...
Question 1380: Which of the following tools and techniques can be used to c...
Question 1381: The term Baseline is used in both disciplines Project manage...
Question 1382: The core planning processes are:...
Question 1383: You are in the process of developing an approved project sch...
Question 1384: The inputs of the Performance Reporting process include all ...
Question 1385: The project manager's leadership style should be matched to ...
Question 1386: Which of the following are NOT described in the PMI's member...
Question 1387: According to PMI, application areas are categories of projec...
Question 1388: You have eight key stakeholders to communicate with on your ...
Question 1389: You are the project manager at Day-Old donuts, a rapidly gro...
Question 1390: The marketing department has just discovered that a competit...
Question 1391: Which of the following process involves determining project ...
Question 1392: Which of the following best describes the triple constraint?...
Question 1393: What is the order of the Procurement Management processes?...
Question 1394: All of the following are FALSE regarding bar charts EXCEPT:...
Question 1395: Which of the following processes involves developing necessa...
Question 1396: CORRECT TEXT All of the following statements are TRUE regard...
Question 1397: Monte Carlo analysis is
Question 1398: Which of the following communication media is least accepted...
Question 1399: You are a project manager for Giraffe Enterprises. You've re...
Question 1400: In your project, there have been several changes in the cost...
Question 1401: Contingency planning is a means to _____ risks to the projec...
Question 1402: Traits of a participative manager include:...
Question 1403: You are the project manager at a large accounting firm in th...
Question 1404: Which of the following would LEAST likely to be found as par...
Question 1405: You have a geographically dispersed team, from whom you woul...
Question 1406: Which of the following are the outputs of the activity resou...
Question 1407: Which of the following statements are true regarding the pro...
Question 1408: Your company is making a strategy shift: form being focused ...
Question 1409: The project charter either directly or by reference to other...
Question 1410: You're the project manager on a software project that is pla...
Question 1411: The major difference between PERT and CPM networks is:...
Question 1412: Your project is nearing completion when a previously undocum...
Question 1413: Which of the following statements is in agreement with McGre...
Question 1414: The sponsor has informed you that the resources for your pro...
Question 1415: You are the project manager in the I.T. department of a majo...
Question 1416: Historical records during close-out are useful to _____ and ...
Question 1417: Which of the following is part of the expectency theory of m...
Question 1418: Which of the following statements are true regarding quality...
Question 1419: You work as a senior project manager for a leading manufactu...
Question 1420: The customer has reviewed the deliverables of a project and ...
Question 1421: According to labor law, which of the following management ac...
Question 1422: In crashing the schedule, you would focus on:...
Question 1423: A Work Breakdown Structure:
Question 1424: Increasing resources on the critical path activities may not...
Question 1425: Financial compensation is the primary motivational tool for ...
Question 1426: Which of the following are outputs of the develop project te...
Question 1427: Which statement is TRUE about Present Value(PV)?...
Question 1428: All the following are inputs to Activity Duration Estimating...
Question 1429: The future value of an annual income flow of $1000 for 2 yea...
Question 1430: You are in the process of planning a project and found that ...
Question 1431: When a project is being performed under contract, the SOW is...
Question 1432: Which of the following statements are false regarding the cl...
Question 1433: Consider the Project Integration Management knowledge area. ...
Question 1434: Douglas McGregor's Theory Y advocates that the average worke...
Question 1435: Which of the following statements regarding quality audits a...
Question 1436: As the leader of a project team, the project manager may be ...
Question 1437: Which is not a type of project review meeting?...
Question 1438: Which of the following time robbers end up creating addition...
Question 1439: You have just awarded a contract to a outside vendor and dev...
Question 1440: What type of organization experiences the least amount of st...
Question 1441: Your company creates software products. It is introducing a ...
Question 1442: Which of the following is generally the MOST CORRECT use of ...
Question 1443: Project staff assignments are an output of which process?...
Question 1444: Unplanned responses to emerging risks that were earlier acce...
Question 1445: You are in the process of estimating the type and quality of...
Question 1446: Who is responsible for issuing the project charter?...
Question 1447: Which of the following are not tools/ techniques that can be...
Question 1448: Which equation correctly illustrates the cost variance of a ...
Question 1449: You work for a consulting company and your team has implemen...
Question 1450: In which of the following process is the qualified sellers l...
Question 1451: When all members must unanimously agree before a decision is...
Question 1452: At what stage in a project are Administrative closure activi...
Question 1453: According to the PMI, which of the following best describes ...
Question 1454: Which of the following process takes the activities that are...
Question 1455: Which of the following documents formally indicates that the...
Question 1456: You are the project manager for Fun Days Vacation Resorts. Y...
Question 1457: Which of the following statements are FALSE regarding analog...
Question 1458: Which of the following are not situations where pre assignme...
Question 1459: You are using the three-point estimating technique to estima...
Question 1460: Communications is best described as:...
Question 1461: During the planning phase of your current project, you prepa...
Question 1462: You are the project manager for the Heart of Texas casual cl...
Question 1463: You are in the process of directing the performance of the p...
Question 1464: Which of the following processes utilize rolling wave planni...
Question 1465: All of the following statements are true regarding the RBS e...
Question 1466: The purpose of configuration management is to:...
Question 1467: Which of the following statements are true regarding colloca...
Question 1468: Which of the following is most closely associated with pure ...
Question 1469: With respect to risk management planning, timing defines how...
Question 1470: Which of the following statements are true regarding the sco...
Question 1471: You are a project manager for Pizza Direct, which is a retai...
Question 1472: The applied level of change control is LEAST dependent upon:...
Question 1473: Which of the following is not an input into organizational p...
Question 1474: All of the following are constraints that can limit flexibil...
Question 1475: The business needs, strategic plan, and product scope descri...
Question 1476: You are in the process of identifying and documenting the pr...
Question 1477: Which of the following statements are FALSE regarding contra...
Question 1478: A Pareto chart helps focusing on......
Question 1479: Electronic Company has a reliability of 0.90. 2 of these com...
Question 1480: Which of the following process involves making needed inform...
Question 1481: Which of the following is NOT a tool/ technique of the Devel...
Question 1482: All of the following are outputs of the close project proces...
Question 1483: An acceptance control chart has limits that are based on the...
Question 1484: Developing a written scope statement as the basis for future...
Question 1485: You've just completed the WBS. Which of the following statem...
Question 1486: Which is ensuring all features and functions are included in...
Question 1487: All the techniques described below can be used to keep a mee...
Question 1488: What documents the characteristics of the product or service...
Question 1489: Which method of conflict resolution tends to increase confli...
Question 1490: Total project risk can be defined as:...
Question 1491: Change requests should be ______ ?...
Question 1492: A project manager is faced with two team members who have co...
Question 1493: Using the data shown: TARGET COST: 12,000, TARGET FEE: 1000,...
Question 1494: The document authorizing functional areas to charge against ...
Question 1495: Surveys have shown that the primary skill needed to be a pro...
Question 1496: In the initiation phase, project manager has been assigned t...
Question 1497: Arbitration is a _____ approach to conflict management in re...
Question 1498: You are a project manager at a biotech company where you are...
Question 1499: Reducing scope, adding resources and using familiar approach...
Question 1500: Please refer to this diagram: (Exhibit) Considering that the...
Question 1501: Rekha is a project manager on a large construction project. ...
Question 1502: Problems can occur in properly defining a project because:...
Question 1503: A particular Process produces parts with Standard Deviation ...
Question 1504: You are interviewing new project managers for your company. ...
Question 1505: Which of the following statements regarding Schedule Network...
Question 1506: The basic terminology for networks includes:...
Question 1507: The risk register describes all identified risks. Which of t...
Question 1508: You are in a meeting with someone who just ate a slice of ga...
Question 1509: Which of the following processes best describes the project ...
Question 1510: Some common formats of performance reports are:...
Question 1511: The major difference between project and line management is ...
Question 1512: As a project manager in a project organization you are const...
Question 1513: Which of the following is a defect?...
Question 1514: Which of the following describes Fast Tracking?...
Question 1515: The strong matrix versus a weak matrix....
Question 1516: Which of the following knowledge areas are part of Project C...
Question 1517: You are in the process of identifying and documenting the pr...
Question 1518: In assigning your new project to you, the program manager te...
Question 1519: You are a contract manager within an information technology ...
Question 1520: Which of the following statement are FALSE regarding the pro...
Question 1521: Your project was just completed, accepted, and closed. As is...
Question 1522: Which of the following best describes the complete set of in...
Question 1523: Scope Management:
Question 1524: An organization chart which shows the organizational units r...
Question 1525: Which of the following concepts are associated with the "Cos...
Question 1526: You are in process of controlling changes to the project sco...
Question 1527: Four people are responsible for establishing cost of quality...
Question 1528: Which is not a consideration in a make or buy decision?...
Question 1529: The WBS is an input to all of the processes EXCEPT:...
Question 1530: You are a project manager for a company that publishes child...
Question 1531: Cost of quality is:
Question 1532: You are running a project which was budgeted based on some R...
Question 1533: The definitive terms of a contract are written during which ...
Question 1534: The Scope Statement incorporates all of the following except...
Question 1535: Range estimating in determining cost risk probabilities requ...
Question 1536: The term resource planning refers to:...
Question 1537: You are using three point estimating technique to estimate t...
Question 1538: Which of the following is NOT a tool in Risk Identification?...
Question 1539: What are the strategies for dealing with positive risks?...
Question 1540: In which of the following organization(s) does the Functiona...
Question 1541: As a project manager, you must formalize acceptance of the p...
Question 1542: Sound, prudent, but often unsophisticated judgement is calle...
Question 1543: You are responsible for launch operations of different NASA ...
Question 1544: You are the project manager at a utility company. Due to the...
Question 1545: What limits the options of the project team?...
Question 1546: You are in the process of establishing a total cost baseline...
Question 1547: The project team has added some additional functionality whi...
Question 1548: Project life cycles are very useful for _____ and _____ ....
Question 1549: You have had your Scope Definition approved and are working ...
Question 1550: The theory that 85 percent of the cost of quality is a manag...
Question 1551: Which of the following statements are FALSE regarding the pr...
Question 1552: The earned value report BCWP at the end of the project...
Question 1553: Management styles associated with production environments, s...
Question 1554: Quantitative risk analysis involves all of the following exc...
Question 1555: You are a project manager for a growing dairy farm. It offer...
Question 1556: What tool have project managers come to use to identify all ...
Question 1557: Physical Work Actually accomplished is also called...
Question 1558: One of your friends is a manager at telecommunications compa...
Question 1559: The project charter is prepared in which scope management pr...
Question 1560: Subnetwork are a term used in reference with which of the fo...
Question 1561: Which of the following is least likely to be used in explain...
Question 1562: You are the project manager at a manufacturer of electronic ...
Question 1563: You are the project manager responsible for constructing new...
Question 1564: Your management announced that they want to put you on a Str...
Question 1565: Consider the project Integration Management knowledge area. ...
Question 1566: Life-Cycle Costing is:
Question 1567: Your top team member has performed extremely well, and you w...
Question 1568: A task-oriented family tree of activities is a:...
Question 1569: Dummy relationships or dummy activities can be used in which...
Question 1570: When items to be purchased for a project are specified by pe...
Question 1571: Which describes how cost variances will be managed?...
Question 1572: Which of the following best describes a win-lose conflict re...
Question 1573: Tools and techniques used during the Quality Planning proces...
Question 1574: Which of the following are NOT used to create the scope base...
Question 1575: You have been recently assigned to provide an accurate proje...
Question 1576: If a property depreciates by the same amount every year, it ...
Question 1577: Which of the following is an output from Cost Control?...
Question 1578: Which of the following describes the input to the direct and...
Question 1579: Fast tracking means to:
Question 1580: The most common method for pricing out non-burdened labor ho...
Question 1581: You are the project manager working on constructing a suspen...
Question 1582: As a project Manager, Problem solving is high in your list o...
Question 1583: All of following are types of strategies that one can use to...
Question 1584: During Human resource planning you identified that your team...
Question 1585: A project can best be defined as:...
Question 1586: Which statement is FALSE about project deliverable?...
Question 1587: Which of the following is equivalent to a lump sum contract:...
Question 1588: The scope statement should include:...
Question 1589: Procurement planning is the process of identifying which pro...
Question 1590: The three major causes of change on a project are-...
Question 1591: All of the following statements define the role of a meeting...
Question 1592: All of the following are true about Project Plan Execution e...
Question 1593: A line manager provides you with three estimates for his act...
Question 1594: A key barrier to team development is:...
Question 1595: These diagrams rank-order factors for corrective action by f...
Question 1596: The two closing procedures are called:...
Question 1597: As the project manager, you chair a weekly exchange of infor...
Question 1598: Which of the following is NOT an input to Perform Quality Co...
Question 1599: Which of the following statements most accurately describes ...
Question 1600: You have been assigned to a project to build a large 30-stor...
Question 1601: During which phase of the project lifecycle is the level of ...
Question 1602: Projects are typically authorized as a result of one or more...
Question 1603: You have been assigned to a project to build a large 30-stor...
Question 1604: Which of the following statements are true?...
Question 1605: As part of the quality audit, the scope statement is checked...
Question 1606: Outputs of Integrated Change Control include:...
Question 1607: CORRECT TEXT You are currently the project manager at a cons...
Question 1608: A type of organization in which the project manager has litt...
Question 1609: In your company, for making investment decisions, the senior...
Question 1610: The work breakdown structure (WBS) is first developed in whi...
Question 1611: What is the purpose of the WBS?...
Question 1612: You are in the process of establishing a total cost baseline...
Question 1613: You are the project manager for the manufacturer of children...
Question 1614: You are in the process of controlling changes to the project...
Question 1615: You are in the process of obtaining necessary human resource...
Question 1616: Which of the following statements are FALSE regarding expect...
Question 1617: The project charter, either directly, or by reference to oth...
Question 1618: On any project, quality should usually be of _____?...
Question 1619: Inputs to contract administration do not include:...
Question 1620: The normal risk of doing business that carries opportunities...
Question 1621: Achieving effective upward communications in an organization...
Question 1622: Scope verification is a part of:...
Question 1623: Two project members have been having some disagreement about...
Question 1624: What is the most important benefit of a 360 degree review?...
Question 1625: The _____ specification delineates specific measurable capab...
Question 1626: ___________ is/are an uncertain event that or condition that...
Question 1627: One of the most common pitfalls in effective communication i...
Question 1628: Which of the following is true regarding the project scope s...
Question 1629: Which of the following is not a Project Management knowledge...
Question 1630: This process uses tools like decomposition and rolling-wave ...
Question 1631: Which of the following describes an input to the direct and ...
Question 1632: You are in the process of analyzing activity sequence, durat...
Question 1633: The use of scarce resources must be decided upon with functi...
Question 1634: Cost management includes:
Question 1635: You have been recently been assigned to provide an accurate ...
Question 1636: Risk management allows the project manager and the project t...
Question 1637: All of the following statements are true regarding issue log...
Question 1638: In general, the best long-lasting approach to settling proje...
Question 1639: Which of the following are not used to create the scope base...
Question 1640: You're managing a project with a schedule performance index ...
Question 1641: You are currently working on a web development project to de...
Question 1642: A complex project will fit best in what type of organization...
Question 1643: Which of the following can you use to determine an individua...
Question 1644: You work for a large manufacturing plant. You are working on...
Question 1645: You are in the process of defining how to plan and execute t...
Question 1646: Which of the following statements are true regarding cost es...
Question 1647: Decomposition of project work involves all of the following ...
Question 1648: You are in the process of controlling changes to a project b...
Question 1649: Project initiation is all of the following except:...
Question 1650: Scope planning is:
Question 1651: Which of the following statements regarding the project char...
Question 1652: Which of the following are the essentials regarding a projec...
Question 1653: Which of the following statements are FALSE regarding qualit...
Question 1654: All of the following are true of Administrative Closure exce...
Question 1655: You are a project manager for Star Light Strings. Star Light...
Question 1656: CIP embodies which of the following principals?...
Question 1657: Which of the following does not contribute to increased Sche...
Question 1658: The senior executive of the company where you work requires ...
Question 1659: The centerline of a standard "Shewhart' control chart repres...
Question 1660: Which is NOT an example of cost of quality?...
Question 1661: The man-hours for project integration activities normally ap...
Question 1662: The scope baseline consists of:...
Question 1663: As a Project Manager you have just completed a 9-month proje...
Question 1664: As the Project Cost Engineer on a high rise development you ...
Question 1665: You've been hired by a large consulting firm to evaluate a s...
Question 1666: Parametric cost estimating involves...
Question 1667: A cost management plan is:
Question 1668: You are the project manager responsible for renovating a 70-...
Question 1669: As a Project Manager, you have to manage the project and lea...
Question 1670: All of the statements regarding rolling wave planning is TRU...
Question 1671: You are a project manager at a construction company who is w...
Question 1672: A project manager trying to communicate accurately to the te...
Question 1673: You have been recently hired to be a project manager at a bi...
Question 1674: The core function of the project manager is...
Question 1675: The process to change a contract clause is __________ the pr...
Question 1676: Deflection or transfer of a risk to another party is part of...
Question 1677: Schedule variance can be determined by:...
Question 1678: Who is responsible to provide project templates, methodologi...
Question 1679: You are in the process of controlling changes to project cos...
Question 1680: Fixed-price contracts place more risk on the _____ ....
Question 1681: The estimated cost to complete (ETC) is _____....
Question 1682: You could obtain measuring equipment with very high accuracy...
Question 1683: A good team leader must be concerned not only with _____ but...
Question 1684: Time management is the allocation of time in a project's lif...
Question 1685: Which of the following techniques may be used on a project t...
Question 1686: Which of the following establishes minimum requirements of p...
Question 1687: Which of the following statements are true regarding the com...
Question 1688: If you are calculating one early start and early finish for ...
Question 1689: You are in the process of estimating the number of work peri...
Question 1690: Feasibility studies occur in which life cycle phase (s)?...
Question 1691: Which of the following is NOT a type of communication?...
Question 1692: All of the following can be used to estimate contingency res...
Question 1693: The budget associated with scope changes that have been appr...
Question 1694: To compare actual project results to planned or expected val...
Question 1695: Which of the following statements concerning bottom-up estim...
Question 1696: The most common form of written project communication is...
Question 1697: As a project manager on a major construction project you spe...
Question 1698: Which statement describes best the meaning of Leadership?...
Question 1699: You scheduled a kick-off meeting in order to announce the st...
Question 1700: A Work Breakdown Structure can be used for all the following...
Question 1701: When planning, organizing, coordinating, and controlling a p...
Question 1702: Your client has terminated your project before it is complet...
Question 1703: The sender is responsible for:
Question 1704: Which organization is same as Functional organization?...
Question 1705: You are collecting information regarding project progress an...
Question 1706: You are managing a construction project using a fixed price ...
Question 1707: Which of the following statements are true regarding the cri...
Question 1708: Which of the following statements are false regarding the co...
Question 1709: A company has to make a choice between two projects, because...
Question 1710: Which of the following statements are false regarding the co...
Question 1711: By using Project Risk Management techniques, project manager...
Question 1712: You work for a large manufacturing plant. Your firm is think...
Question 1713: Please refer to this Decision Tree which shows the analysis ...
Question 1714: You have inherited a project that is in trouble. The team me...
Question 1715: Which of the following are source selection tools or techniq...
Question 1716: You are assigned as a project manager for an internal projec...
Question 1717: There have been too many disagreements within two team-membe...
Question 1718: Which performance measurement tells you what the projected t...
Question 1719: Your project multiple functions. If this decision is made, y...
Question 1720: Keeping up with the growth was becoming a problem for a priv...
Question 1721: Which of the following represents the pinnacle of Maslow's h...
Question 1722: Universal characteristics of effective project managers incl...
Question 1723: Which of the following is NOT a tool or technique of Risk Mo...
Question 1724: When components in a system are arranged in series, system r...
Question 1725: What is the standard deviation for the estimates in the abov...
Question 1726: Topics that deal with people include:...
Question 1727: The major process groups of project management are:...
Question 1728: You are in the process of tracking identified risks, monitor...
Question 1729: Which of the following describes an input to the direct and ...
Question 1730: The objective of duration compression includes all the follo...
Question 1731: The quality management plan documents how the project team w...
Question 1732: The process of assessing the probability and consequences of...
Question 1733: The process of monitoring specific project results to determ...
Question 1734: A project plan is:
Question 1735: You are a project manager at java ice cream factory. You are...
Question 1736: Which of the following is not an external-unpredictable risk...
Question 1737: Using the situation below and assuming continued efficiency ...
Question 1738: Which task has the greatest schedule variance?...
Question 1739: When should risk identification be performed? (select best a...
Question 1740: Which of the following process groups are in loop back relat...
Question 1741: Which of the following tools is used to document the lessons...
Question 1742: The BCWP is 65%, the BCWS is 70%. The project manager wants ...
Question 1743: Processes of configuration management commonly include all o...
Question 1744: In WBS diagramming, the work package is:...
Question 1745: The WBS is:
Question 1746: All of the following statements are true regarding the confi...
Question 1747: A project schedule can be presented in various formats. All ...
Question 1748: Which of the following BEST describes a mutually binding leg...
Question 1749: Under what knowledge area is the primary process area for ca...
Question 1750: You identified a technical risk in your project and assigned...
Question 1751: Your organization has the choice between several internal pr...
Question 1752: Which of the following utility functions reflects risk-avers...
Question 1753: You are a contract project manager within an information tec...
Question 1754: Confirmation that the project has met all customer requireme...
Question 1755: To determine the tangible and intangible costs and benefits ...
Question 1756: Which of the following is not a tool or technique for cost c...
Question 1757: The marketing department has just discovered that most buyer...
Question 1758: The outputs of the Close Project process include all of the ...
Question 1759: You are managing a design project. You find that bringing al...
Question 1760: Quality control is normally performed by the _____ ....
Question 1761: Your company manufactures memory chips for workstation compu...
Question 1762: While preparing your risk responses, you realize that you ha...
Question 1763: Management wants to be sure that the project is following de...
Question 1764: Scope definition is necessary to...
Question 1765: The most expensive phase of life cycle costing is:...
Question 1766: A project kick off meeting is usually conducted to:...
Question 1767: While implementing your project, a team member brings to you...
Question 1768: Which of the following can be used to measure overall projec...
Question 1769: As a software development manager in a boutique software sho...
Question 1770: The Statement of Work (SOW) is developed during the _____ cy...
Question 1771: All the following are tools and techniques for performance r...
Question 1772: You are managing a project to install a new postage software...
Question 1773: You work for a large manufacturing plant. You are working on...
Question 1774: Which of the following requires an expenditure of the resour...
Question 1775: Which of the following would you use in risk identification ...
Question 1776: The net present value of $110 one year from now at 10% is:...
Question 1777: Co-location can help with:
Question 1778: Which of the following is buyer-prepared formal request sent...
Question 1779: All the following statements are true regarding communicatio...
Question 1780: Risk management requires an understanding that _____ ....
Question 1781: You are presented the following schedule data regarding vari...
Question 1782: Forecasting human resource requirements necessitates making ...
Question 1783: Which of the following is NOT a characteristic of the Projec...
Question 1784: You are in process of identifying and documenting the projec...
Question 1785: Statistical cost estimating techniques (based upon history),...
Question 1786: All of the following are communication tools EXCEPT:...
Question 1787: Risk to the project can be categorized by all of the followi...
Question 1788: An output of scope definition is:...
Question 1789: Key Management skills include:
Question 1790: You are a project manager of ABC organization. Your project ...
Question 1791: Tools and techniques for scope planning include...
Question 1792: Which of the following is not an appropriate reason to provi...
Question 1793: Your company's quality assurance department has performed a ...
Question 1794: All of the following are generally true about a Project Char...
Question 1795: Which of the following represents the BEST way to organize p...
Question 1796: Which of the following are outputs from the Communications P...
Question 1797: If project time and cost are not as important as the number ...
Question 1798: You are an information security project manager responsible ...
Question 1799: Which of the following establishes the procedure to perform ...
Question 1800: Maslow ranked Human needs from the highest to lowest...
Question 1801: You are the project manager of a project .You have just comp...
Question 1802: The cost of choosing one project and giving up another proje...
Question 1803: A notice sent to a sub-contractor about the contract is an e...
Question 1804: The Estimate At Completion (EAC) can be used to forecast the...
Question 1805: Which of the following statements is true regarding the crit...
Question 1806: As a PMP, one of your responsibilities is to ensure integrit...
Question 1807: When you look at a control chart that measures defects in th...
Question 1808: A organization where power shared between project manager an...
Question 1809: Historical records from previous project are generally used ...
Question 1810: Which of the following risks should be classified as a force...
Question 1811: You are presented the following schedule data regarding vari...
Question 1812: Which of the following is NOT and output of manage stake hol...
Question 1813: You are a project manager at for an information technology d...
Question 1814: Scoring models, comparative approaches and benefit contribut...
Question 1815: The most difficult decision for the executive sponsors to ma...
Question 1816: Reserve Analysis is a technique for:...
Question 1817: Cost Estimating is most closely linked with which other proc...
Question 1818: You are the project manager at a large automaker in Japan. Y...
Question 1819: __________ involves using project characteristics in a mathe...
Question 1820: The Japanese resource management model exhibits:...
Question 1821: Which of the following tools can be used to help to analyze ...
Question 1822: Your company manufactures memory chips for workstation compu...
Question 1823: Your management has decided that all orders will be treated ...
Question 1824: A team member is showing up late to work and leaving early, ...
Question 1825: Risks and Triggers are outputs of:...
Question 1826: You are the project manger for Xylophone Phonics. This compa...
Question 1827: At which stage, project cost is maximum?...
Question 1828: Modern Quality Management means:...
Question 1829: You are currently the project manager at rapidly growing ret...
Question 1830: The performing organization is trying to decide whether to s...
Question 1831: Outputs from Organizational Planning include all of the foll...
Question 1832: Management has decided to "crash" a project in order to avoi...
Question 1833: One of the engineers on your team performs a presentation to...
Question 1834: According to the PMBOK Guide, the project manager is identif...
Question 1835: A quality management plan is created during which of the fol...
Question 1836: In taking over a failing project you hold a status meeting w...
Question 1837: Project managers need exceptionally good communication and n...
Question 1838: Which of the following statements are TRUE:...
Question 1839: Which of the following constitute Juran's "quality trilogy":...
Question 1840: You are the project manager for a construction company. Your...
Question 1841: As a Project Manager, you realize that it is very important ...
Question 1842: You are the project manager for a railroad construction proj...
Question 1843: A technique for resolving conflict in which the parties agre...
Question 1844: The core function of the PM is
Question 1845: Using the data below, the point of total assumption occurs a...
Question 1846: Charisma would be an example of _____ power....
Question 1847: The most common types of schedules are Gantt charts, milesto...
Question 1848: Mathematical models using linear, dynamic, integer, or algor...
Question 1849: Each of the following statements describes an element of the...
Question 1850: As the project manager, which of the following techniques wo...
Question 1851: Communication is the PRIME responsibility of a Project:...
Question 1852: You are using the three-point estimating technique to estima...
Question 1853: A project manager recently rewarded an individual with a pro...
Question 1854: Your upcoming project includes project team members from a f...
Question 1855: Your selection committee is debating between two projects. P...
Question 1856: Which of the following Scope Management process involves bre...
Question 1857: You're managing a software project. Your team has discovered...
Question 1858: Which of the following will have the greatest impact on a pr...
Question 1859: You are a project manager for Penguin Software. Your company...
Question 1860: All of the following are examples of quality metrics EXCEPT:...
Question 1861: You are one of four full-time project managers in an organiz...
Question 1862: Which of the following calculates how much additional budget...
Question 1863: What are the documents required to complete project initiati...
Question 1864: Which of the following process is involved in developing an ...
Question 1865: Which of the following statements are true regarding the pro...
Question 1866: Which of the following processes is considered the most effe...
Question 1867: The seller tells you that your activities have resulted in a...
Question 1868: You know that BAC = 375, PV = 300, AC = 200, and EVC = 250. ...
Question 1869: The Delphi Method is _____ .
Question 1870: You are developing the project charter for a new project. Wh...
Question 1871: Which of the following is not a process of project human res...
Question 1872: In general, attempts to smooth out period to period resource...
Question 1873: Business needs and legal requirements are example of:...
Question 1874: Utility Theory:
Question 1875: A WBS should be developed to cover...
Question 1876: Planning activities such that predetermined resource availab...
Question 1877: The determination of conformance with scope requirements is ...
Question 1878: A company is making a decision regarding which model of equi...
Question 1879: All the following are responsibilities of a certified PMP EX...
Question 1880: Projects are typically authorized as a result of one or more...
Question 1881: All of the following statements are true regarding a change ...
Question 1882: A Project charter is a document that......
Question 1883: Collect Requirements is:
Question 1884: Planning components are tools/ techniques of the Activity De...
Question 1885: During the execution of a project to build a complex defence...
Question 1886: During project execution, the customer authorizes and funds ...
Question 1887: An RFP is issued during which step in the procurement proces...
Question 1888: Project termination responsibilities include all of the foll...
Question 1889: Inputs to contract administration include...
Question 1890: Dennis works for an international manufacturer for consumer ...
Question 1891: The most common form of project communication is:...
Question 1892: Which of the following best describes the project human reso...
Question 1893: What is a risk owner?
Question 1894: In what way does free float (FF) differ from total float (TF...
Question 1895: Which of the following is referred to as payback period:...
Question 1896: A project team member submits a suggestion on how to improve...
Question 1897: You have been hired as a project manger for a local communit...
Question 1898: The document that describes the project's scope baseline is:...
Question 1899: You are the project manager for an information technology di...
Question 1900: One of your friends is a manager at telecommunications compa...
Question 1901: You have been recently hired to be a project manager at a so...
Question 1902: The risk register is initiated in the Risk Identification pr...
Question 1903: The quality team for the project consists of several groups....
Question 1904: All of the following are part of scope baseline EXCEPT:...
Question 1905: Which of the following best describes the amount of time one...
Question 1906: The _____ specification delineates specific end use capabili...
Question 1907: A project manager has made a change to the project. What sho...
Question 1908: All of the following are constraints that can limit flexibil...
Question 1909: You are a project manager on a construction project. You hav...
Question 1910: You are the project manager at a manufacturer of electronic ...
Question 1911: Please select the correct order for the five project managem...
Question 1912: Which of the following statements are FALSE regarding the co...
Question 1913: _____ is associated with a buyer's request for materials or ...
Question 1914: You are reviewing performance goals to figure out how much b...
Question 1915: A mandatory prerequisite for team building is:...
Question 1916: All the following are true about contract negotiation except...
Question 1917: What is the main difference between the project charter and ...
Question 1918: Which of the following statements are false regarding the pr...
Question 1919: Which of the following project selection methods is NOT a co...
Question 1920: The project manager is assigned in the?...
Question 1921: You are refining the product description for your company's ...
Question 1922: Which of the following are NOT inputs to the risk identifica...
Question 1923: _________ is normally not a method of RoI (Return on investm...
Question 1924: A bar chart shows the number and type of resources you need ...
Question 1925: All are the part of scope baseline except:...
Question 1926: A major assumption of all network scheduling methods is that...
Question 1927: Which is not part of the Earned Value calculations?...
Question 1928: Reserve Analysis technique NOT used during __________....
Question 1929: Project Cost Management Plan is created as a part of:...
Question 1930: All of the following are examples of virtual teams EXCEPT:...
Question 1931: The process of determining who needs what information, when ...
Question 1932: Which of the following describes the contents of a staffing ...
Question 1933: Techniques for Source Selection include all of the following...
Question 1934: The project schedule is used to determine all of the followi...
Question 1935: All the following statements related to Benefit Cost Ratio (...
Question 1936: You are the project manager at Day-Old donuts a rapidly grow...
Question 1937: You are a project manager for Fountain of Youth Spring Water...
Question 1938: Which statement is false for Constructive changes?...
Question 1939: Which of the following are outputs of the Scope Verification...
Question 1940: Which of the following are NOT inputs to the Develop Project...
Question 1941: In the project environment, the individual ultimately respon...
Question 1942: Inputs to contract closeout include...
Question 1943: Excessive flexibility in specifying requirements will _____ ...
Question 1944: You are the project manager responsible for developing a new...
Question 1945: Analogous Estimate Costs is _________....
Question 1946: You are in process of analyzing the effects of identified ri...
Question 1947: The concept that it is easier and less costly to do the work...
Question 1948: An important part of performing stakeholder analysis is docu...
Question 1949: Procurements audits are a tool/ technique of which of the fo...
Question 1950: You are in the process of developing an approximation of the...
Question 1951: Your customer wants your project, a process to dump "bad" eg...
Question 1952: You have just taken over a project as a project manager, whi...
Question 1953: The traditional organizational form has the disadvantage of:...
Question 1954: A leadership style in which the project manager shares probl...
Question 1955: You are currently in the process of prioritizing risks by th...
Question 1956: The most frequently used construct in Precedent Diagramming ...
Question 1957: Overall change control requires all of the following except:...
Question 1958: Using the PERT, the probability of completing a project at o...
Question 1959: Which concept of locating team members can help them best to...
Question 1960: Which of the following are tools to contract closure process...
Question 1961: You are the project manager within a large multi-national co...
Question 1962: You are a project manager for a software project. As you are...
Question 1963: The time necessary to complete a project is called the _____...
Question 1964: n schedule development, mathematical analysis often produces...
Question 1965: To-complete performance index (TCPI) is represented by which...
Question 1966: Contract administration integrates many of the other knowled...
Question 1967: As a project manager, you realize that handling Project Stak...
Question 1968: The Scope Statement is used in which process...
Question 1969: Which process is not included in Project Time Management?...
Question 1970: Fixed Price contracts place more risk on the:...
Question 1971: All of the following statements regarding bidder conferences...
Question 1972: A vendor has notified you that a shipment will be 3 weeks la...
Question 1973: The project manager must receive reports and briefings from ...
Question 1974: You have just completed the project planning process group a...
Question 1975: Given this portion of the network diagram to the right, what...
Question 1976: You are the project manager for an international contract ma...
Question 1977: What is the work breakdown structure typically used for?...
Question 1978: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 1979: In which of the following scope management processes is the ...
Question 1980: A recurring communication pattern within the project organiz...
Question 1981: Of the following, which conflict resolution strategy is like...
Question 1982: Which of the following will you as the project manager need ...
Question 1983: Which of the following NOT input to project initiation proce...
Question 1984: You are a project manager responsible for the construction o...
Question 1985: Which of the following statements are false regarding the Cl...
Question 1986: Product analysis uses which of the following techniques EXCE...
Question 1987: You are in the process of controlling changes to the project...
Question 1988: The critical path in a network is the path that:...
Question 1989: A Project with a total funding of $70,000 finished with a BA...
Question 1990: In which of the project processes should one determine wheth...
Question 1991: Which of the following is not an output of scope change cont...
Question 1992: The project charter is developed by:...
Question 1993: You are in the process of directing the performance of the p...
Question 1994: Which of the following would be the MOST appropriate thing t...
Question 1995: In the contract for your project, the time schedules and del...
Question 1996: Qualitative risk analysis requires accurate data as its inpu...
Question 1997: A project manager is working in a country where it is custom...
Question 1998: You are the project manager for an information technology di...
Question 1999: Weighting systems, screening systems, and independent estima...
Question 2000: Which is developing an approximation of the costs of the res...
Question 2001: Which risk analysis tool is used to model your risks on a co...
Question 2002: Supporting details for activity cost estimates should includ...
Question 2003: A line manager possesses information which the project team ...
Question 2004: You have been hired as a project manager for a small local b...
Question 2005: Which of the following theories are illustrated by the princ...
Question 2006: Which of the following tool / technique are of develop proje...
Question 2007: You are about 30% through a project. In reviewing the produc...
Question 2008: In a project, a Cost incentive contract has been awarded to ...
Question 2009: A network has been developed with resources from six differe...
Question 2010: Which is not a characterizing content of a document referred...
Question 2011: The Quality Risk _____ .
Question 2012: All of the following statements regarding Control Accounts a...
Question 2013: All of the following statements regarding Control Accounts a...
Question 2014: Mary is a project manager at a consulting company. The compa...
Question 2015: Consider the following situation: A scope change as requeste...
Question 2016: What is true for a project when a Phase gate approach is bei...
Question 2017: In your previous project, the project manager gave a lot of ...
Question 2018: Root Cause Analysis related to ________....
Question 2019: To ensure the effectiveness of corrective actions, correctiv...
Question 2020: A particular process has 2 independent sources of variation....
Question 2021: Which tool and technique integrates scope, cost and schedule...
Question 2022: All of the following statements about control charts are tru...
Question 2023: Which of the following process involves measures project and...
Question 2024: There has been a change to the scope of your project, which ...
Question 2025: Your project was just completed. Because of some unfortunate...
Question 2026: Which of the following is associated with a buyer's request ...
Question 2027: You are the project manager within an information technology...
Question 2028: You must produce 27 widgets. You can only produce 9 widgets ...
Question 2029: What is the preferred method of verifying scope?...
Question 2030: What should you take care of when you Monitor and control pr...
Question 2031: All of the following are objectives of a buyer-conducted per...
Question 2032: Human resource administration is the primary responsibility ...
Question 2033: What do you expect when you are submitting an Invitation to ...
Question 2034: You would like to develop a cost estimates for your project....
Question 2035: Selection criteria for project selection include:...
Question 2036: At appropriate times during your project, you issue task ord...
Question 2037: Which of the following statement are FALSE regarding the pro...
Question 2038: The organizational design of a project is critical to its su...
Question 2039: If the Earned Value is equal to Actual Cost, What does it me...
Question 2040: The party that needs the change resulting from the project, ...
Question 2041: You are a project manager at a project company developing wi...
Question 2042: Team development is undertaken to improve performance. Which...
Question 2043: Based on the chart, while completing the project, a team mem...
Question 2044: Please refer to the figure below: (Exhibit) If these three t...
Question 2045: You are project manager responsible for constructing a new s...
Question 2046: Which of the following is not a major step of decomposition?...
Question 2047: Optimistic 3 days, Pessimistic 9 days, and mostly likely 6 d...
Question 2048: Which of the following is NOT a cost estimation tool or tech...
Question 2049: Dave is the project manager for a construction project that ...
Question 2050: You are a project manager of ABC Company and your project is...
Question 2051: A Run chart is a useful tool to show...44...
Question 2052: You are the Project Manager responsible for developing a sof...
Question 2053: Two weeks ago the project manager was fired for not managing...
Question 2054: Cost management includes processes that are required to main...
Question 2055: A project was budgeted at $1,000,000. The project is meanwhi...
Question 2056: A project manager who, in a deference of opinion with the pr...
Question 2057: A negative cost variance and positive schedule variance mean...
Question 2058: Scheduling is the process by which decisions are made concer...
Question 2059: You are ready to enter a negotiating session with a group th...
Question 2060: The utility of network-based schedules:...
Question 2061: You are the project manager for an information technology di...
Question 2062: Your project sponsor has requested a cost estimate for the p...
Question 2063: You are the project manager at Construction Company, assigne...
Question 2064: Float is the amount of time an activity can be delayed witho...
Question 2065: Delegation may
Question 2066: Which of the following statements are FALSE regarding costre...
Question 2067: Which of the following is NOT an output of Monitor &amp; Con...
Question 2068: You are the project manger for Xylophone Phonics. It produce...
Question 2069: Which of the following statement are false regarding issue l...
Question 2070: Your project plan requires personnel to wear a Radiation Mon...
Question 2071: A project manager is planning the staffing levels that will ...
Question 2072: Providing information to stakeholders to inform them how res...
Question 2073: All of the following statements regarding Bidder conferences...
Question 2074: Which of the following statements are true regarding straigh...
Question 2075: Exhibit: Please refer to the exhibit. (Exhibit) You are a pr...
Question 2076: Which of the following fall(s) under the responsibilities of...
Question 2077: Which statement is FALSE about project manager?...
Question 2078: Each of the following statements is true regarding the risk ...
Question 2079: ____________ formalizes the acceptance of the project or pha...
Question 2080: Which of the following must not performed in the project ini...
Question 2081: How would you react as the project manager operating in a ma...
Question 2082: An Activity has an Optimistic estimate of 10 days, pessimist...
Question 2083: Which of the following is not a type of performance reportin...
Question 2084: The Project Manager has the responsibility of knowing what k...
Question 2085: All of the following are outputs of the close project proces...
Question 2086: Which of the following terms is used to describe the receipt...
Question 2087: You are the project manager for the manufacturer of children...
Question 2088: In a Weak Matrix organization, the role of a project manager...
Question 2089: Which of the following is a planning tool describing how the...
Question 2090: The zero defects concept
Question 2091: All of the following statements are true regarding decomposi...
Question 2092: Which of the following should be archived upon completion of...
Question 2093: A modification of a logical relationship that allows an acce...
Question 2094: You work for a furniture manufacturer. Your project is going...
Question 2095: Resource planning involves determining what ____________ res...
Question 2096: The concept of zero inventory is called:...
Question 2097: You are currently the project manager at a rapidly growing r...
Question 2098: Which of the following is configuration management activity ...
Question 2099: All of the following are true regarding the Quality Planning...
Question 2100: You are a project manager responsible for constructing a new...
Question 2101: A work breakdown structure is most useful for:...
Question 2102: The use of quality management tools is used to provide...
Question 2103: You are in process of identifying and documenting project ri...
Question 2104: You are a project manager at a real estate company that deve...
Question 2105: All of the following are benefits of meeting quality require...
Question 2106: Which of the following statements are FALSE regarding sensit...
Question 2107: You are in process of defining how to plan and execute the r...
Question 2108: A common way by which executives provide the project manager...
Question 2109: A Project with a total funding of $70,000 finished with a BA...
Question 2110: You are project manager and now in middle of creating RFP(Re...
Question 2111: One of your tasks as a project manager is to prepare a Scope...
Question 2112: The Java development of a project is outsourced to India. Th...
Question 2113: In optimal organization structure, the project manager is:...
Question 2114: Which quality management tool would be used to determine pot...
Question 2115: You are the project manager assigned to install the electric...
Question 2116: Which of the following can affect network durations?...
Question 2117: Management reserve is generally intended to be used to:...
Question 2118: Which of the following statements are FALSE?...
Question 2119: Variance analysis, trend analysis, and earned value techniqu...
Question 2120: Which of the following helps you identify the root cause of ...
Question 2121: All of the following are activities of the configuration man...
Question 2122: When choosing the most appropriate form of project organizat...
Question 2123: What is one of the problems with project management software...
Question 2124: A calendar that identifies when a project may be performed o...
Question 2125: Which project management process groups takes maximum time a...
Question 2126: Scope verification differs from quality control in that it i...
Question 2127: A team member is not performing well on the project because ...
Question 2128: There is a project with CPI = 0.81 and TCPI = 1.00001; this ...
Question 2129: A contractor is working on a fixed price contract that calls...
Question 2130: Risk event probability is defined as:...
Question 2131: Which of the following best describes this illustration? Exh...
Question 2132: Who should contribute to the development of the project plan...
Question 2133: Inspection of a complex project according to specifications ...
Question 2134: With respect to the earned value analysis, which of the foll...
Question 2135: You are managing a software engineering project, when two te...
Question 2136: Generally, when is the BEST time to create a procurement man...
Question 2137: You are in the process of defining the specific activities t...
Question 2138: Which of the activities have negative slack, given the table...
Question 2139: What should you as the project manager do in the event of re...
Question 2140: Core planning processes:
Question 2141: Which is not a technique for Sequence Activities?...
Question 2142: Which of the following is a configuration management activit...
Question 2143: Which is not output from Control Schedule:...
Question 2144: Which of the following statements describes the result of re...
Question 2145: Extensive use of ___ communication is MOST likely to aid in ...
Question 2146: Which of the following statements about decomposition is the...
Question 2147: All these statements about project charter are correct excep...
Question 2148: All of the statements regarding Planning Packages are true E...
Question 2149: A poorly defined staffing management plan will LEAST impact:...
Question 2150: A project manager uses a facilitator to gather opinions from...
Question 2151: Ouchi's Theory Z relates more to _____ whereas Theory X / Th...
Question 2152: Project termination responsibilities include all of the foll...
Question 2153: You are in the process of reviewing offers and choosing amon...
Question 2154: Standard deviation of project completion is _____ ....
Question 2155: Which of the following describes the assumptions made by the...
Question 2156: Implemented change request, implemented corrective actions a...
Question 2157: In which plan do you define the processes that will be used ...
Question 2158: Uncertainty refers to a situation where:...
Question 2159: Which of the following is not included in project scope stat...
Question 2160: You are in the implementation phase of a project. At this po...
Question 2161: During your assignment as project manager you add a new memb...
Question 2162: According to PMI, application areas are categories of projec...
Question 2163: How can a Process flow chart help in Quality management?...
Question 2164: All of the following are true regarding the Ishiwaka diagram...
Question 2165: Define Activities is typically performed by which of the fol...
Question 2166: All the following are true about Project Plan Execution exce...
Question 2167: A project manager should exhibit two types of leaderships. T...
Question 2168: Integrate Change Control includes the following activities E...
Question 2169: Which statement relating to Scope Verification and Quality c...
Question 2170: Which of the following is NOT one of the five project manage...
Question 2171: Which of the following statements are TRUE regarding the sco...
Question 2172: Project scope is:
Question 2173: Which of the following is NOT a function of a kick-off meeti...
Question 2174: As the project manager, you are preparing your methods for q...
Question 2175: When control charts are being used, outliers are......
Question 2176: You have been recently assigned to provide an accurate proje...
Question 2177: Receipt of bids or proposals and application of the evaluati...
Question 2178: According to the PMI, early termination of a contract is con...
Question 2179: What is not true for Change requests?...
Question 2180: You are managing an industrial design project for an importa...
Question 2181: You are a project manager for an agricultural supply company...
Question 2182: You are the project manager at a large accounting firm in th...
Question 2183: Which does not create changes to the Project Scope Statement...
Question 2184: The purpose of a quality audit includes all of the following...
Question 2185: Which of the following establishes the formal documentation ...
Question 2186: Parametric Estimating is done as a part of which process:...
Question 2187: Linear programming is an example of what type of project sel...
Question 2188: You are using three point estimating technique to estimate t...
Question 2189: You must produce 27 widgets. You can only produce 9 widgets ...
Question 2190: A fixed-price-plus-incentive-fee (FPI) contract has a target...
Question 2191: The tools and techniques of the Request Seller Responses pro...
Question 2192: Which of the following is not a characteristic of the Projec...
Question 2193: All of the following are tools/ techniques of the develop pr...
Question 2194: Coordinating a schedule, organizational policies, staffing p...
Question 2195: Present value measures
Question 2196: Which of the following methods will be MOST effective when d...
Question 2197: Which is not the tools and techniques used in Contract Admin...
Question 2198: According to PMI, application areas are categories of projec...
Question 2199: All of the following are elements of inputs of the Risk Iden...
Question 2200: Situational leadership as defined by Hersey and Blanchard co...
Question 2201: Tools and techniques of performance reporting include...
Question 2202: You are currently in the process of acquiring your project t...
Question 2203: A work package, scheduled for one year from today, will cost...
Question 2204: In your new company, you realize that some of the financial ...
Question 2205: Which of the following is NOT included in a schedule change ...
Question 2206: A project manager reported the following Earned value data: ...
Question 2207: A comprehensive definition of scope management would be:...
Question 2208: Configuration management activities included in the integrat...
Question 2209: You are running a project to engineer and implement a set of...
Question 2210: Which of the following types of power comes through the orga...
Question 2211: If you know expected value is 500 and the standard deviation...
Question 2212: Your project just completed, and one of your subcontractors ...
Question 2213: Which of the following statements are false regarding projec...
Question 2214: Which of the following statements are true regarding the pro...
Question 2215: A project manager and team from a firm that designs railroad...
Question 2216: With respect to value analysis which of the following is the...
Question 2217: A Work Berakdown Structure is most useful for:...
Question 2218: Which of the following factors are NOT included in cost cont...
Question 2219: Which of the following is not an output of the cost control ...
Question 2220: Quality function Deployment is a tool used to:...
Question 2221: Which of the following is true regarding NPV?...
Question 2222: Reserve analysis is a tool /technique in all of the followin...
Question 2223: You are the Chief Technology Officer of a major stock exchan...
Question 2224: Which of the following statements are FALSE regarding the ac...
Question 2225: CORRECT TEXT Monte Carlo simulation:...
Question 2226: As a leader, how should you deem Ethical conduct?...
Question 2227: Which of the following organizations has the best technical ...
Question 2228: Earned value is:
Question 2229: Parametric Modeling and Analogous Estimating are used in wha...
Question 2230: You are the project manger at a leading manufacturer of cons...
Question 2231: Phase exits, kill points and stage gates are used for what p...
Question 2232: The chances for successful completion of a multidisciplinary...
Question 2233: The tools and techniques used in the initiation process are:...
Question 2234: The compromise conflict resolution technique...
Question 2235: A contract where the buyer reimburses the seller for the cos...
Question 2236: You are project manager responsible for constructing a new s...
Question 2237: _______ is the most accurate Estimate Costs technique....
Question 2238: The risk register is initiated in the Risk Identification pr...
Question 2239: You are a contract project manager for a wholesale flower di...
Question 2240: A work authorization system can be used to:...
Question 2241: You are holding end-of-phase meetings with your team members...
Question 2242: Which of the following are valid ways to breakdown the work ...
Question 2243: Analogous estimating:
Question 2244: The scope statement provides
Question 2245: Which of the following factors has historically been the gre...
Question 2246: Which of the following is not an input to quality planning?...
Question 2247: All of the following statements are true EXCEPT:...
Question 2248: Reverse analysis is a tool/ technique in ll of the following...
Question 2249: Geert Hofstede's cultural dimension of Individualism refers ...
Question 2250: Which of the following is NOT a reason to measure variances ...
Question 2251: A company uses a management technique that employs quality a...
Question 2252: All of the following are considered schedule network analysi...
Question 2253: You are aware that an employee in your project may potential...
Question 2254: You are a project manager for a manufacturing firm that prod...
Question 2255: All of the following statements describe the activity list e...
Question 2256: You have collected the work performance information for your...
Question 2257: You are the project manager at a utility company. Due to the...
Question 2258: Which of the following choices indicates that a project has ...
Question 2259: You joined the company recently as a Project Manager. To fam...
Question 2260: What is the lowest level in a work breakdown structure?...
Question 2261: Which of the following is LEAST likely to improve the accura...
Question 2262: Scope verification is concerned with:...
Question 2263: You are in the process of controlling changes to project sch...
Question 2264: Which of the following compression techniques increases risk...
Question 2265: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 2266: In crashing a task, you would focus on:...
Question 2267: Project tradeoffs are usually made by comparing _____ and co...
Question 2268: An effective Project Manager does not share project _____ wi...
Question 2269: You are managing an accounting project when a new CFO is hir...
Question 2270: You are in charge of developing a new product for a bank. Yo...
Question 2271: Which of the following contracts has the MOST risk for the s...
Question 2272: A legally binding document offered unilaterally is a _____ ....
Question 2273: Which of the following is not true for a Responsibility Assi...
Question 2274: According to the PMI, which of the following are NOT true wi...
Question 2275: Characteristics of project phases are:...
Question 2276: You are in the process of translating project objectives int...
Question 2277: You are the project manager for Rivera Gourmet Adventure Vac...
Question 2278: Which of the following impacts the critical path?...
Question 2279: Which of the following best describes the conflict resolutio...
Question 2280: You are currently on a 3-week vocation in Australia. You've ...
Question 2281: Communication in both project and non-project-driven organiz...
Question 2282: You're holding a PMP training seminar for people in your com...
Question 2283: A staffing management plan includes all of the following exc...
Question 2284: Which of the following statements are FALSE regarding Herzbe...
Question 2285: Which of the following is an effective tool to observe trend...
Question 2286: Which of the following are included in the Acquisition phase...
Question 2287: Which of the following best describes risks that arise as a ...
Question 2288: The difference between a project and a program is that:...
Question 2289: The scope management provides:
Question 2290: Which of the following statements regarding WBS are true?...
Question 2291: Which of the following are Information Gathering Techniques ...
Question 2292: Risk mitigation is the process of _____ ....
Question 2293: In which of the following situations would the PERT method b...
Question 2294: You've been assigned as a project manager on a research and ...
Question 2295: Guidelines for estimating time durations include:...
Question 2296: Which of the following statements are FALSE regarding projec...
Question 2297: You are a project manager of ABC organization. There is two ...
Question 2298: What is the purpose of a decision tree?...
Question 2299: A poorly written detailed Project Scope Statement will impac...
Question 2300: Objectives can be described as all of the following except f...
Question 2301: All of the following statements regarding decision tree anal...
Question 2302: You are the project manager responsible for constructing new...
Question 2303: The highest degrees of project risk and uncertainty are asso...
Question 2304: The project management office is worried about the quality o...
Question 2305: You have a choice of accepting a fixed price contract for $1...
Question 2306: The functional organization is effective with a mature produ...
Question 2307: Keeping up with the growth was becoming a problem for a priv...
Question 2308: The primary source document for establishing the content of ...
Question 2309: Which of the following risk management processes are workaro...
Question 2310: The Critical Path Method of scheduling is:...
Question 2311: Which type of warranty is enacted if a service or product do...
Question 2312: The Change Control Board should be _______?...
Question 2313: The main objective of a Control Chart is to :...
Question 2314: All of the following situations will cause schedule activity...
Question 2315: Techniques for conducting product analysis include:...
Question 2316: You are the project manager and responsible for quality audi...
Question 2317: Which of the following is true about pure risk?...
Question 2318: Work Breakdown Structure is:
Question 2319: This process can directly influence the project schedule....
Question 2320: Which is the BEST definition of quality?...
Question 2321: You have completed the Information Distribution Process and ...
Question 2322: The purpose of lessons learned documentation, that is an out...
Question 2323: You are the project manager at a software company developing...
Question 2324: Operations and projects share many characteristics....
Question 2325: Procurements audits are a tool/ technique of which of the fo...
Question 2326: _____ is based on information gathered and analyzed about de...
Question 2327: As a result of a face-to-face meeting you recently had to di...
Question 2328: Project coordination is enhanced through progress reporting,...
Question 2329: You are managing a software project. You are partway through...
Question 2330: Using the data shown: TARGET COST: 12,000, TARGET FEE: 1000,...
Question 2331: Which of the following is used to maintain an index of contr...
Question 2332: Which of the following is included in activity duration esti...
Question 2333: Which of the following tool/ technique are unplanned respons...
Question 2334: You are the project manager of ABC organization. You have to...
Question 2335: Which of the following statements are FALSE regarding Expect...
Question 2336: A person's negotiating skills/temperament certainly are infl...
Question 2337: Product verification is usually performed in the closing pro...
Question 2338: Your company policy allow to gift exchange with customer wit...
Question 2339: The critical path is calculated by...
Question 2340: The initial document that formally recognizes the existence ...
Question 2341: If a project is being performed under contract, the product ...
Question 2342: The project manager has, as a prime responsibility, to assur...
Question 2343: Your project team consists of 12 people in the same building...
Question 2344: As a project is carried out and slack time is consumed on in...
Question 2345: Management usually determines the costs and schedule for a p...
Question 2346: Which of the following statements are FALSE regarding projec...
Question 2347: Which is not used to document team member roles and responsi...
Question 2348: You have been hired as a project manager for a small local b...
Question 2349: Power games, withholding information, and hidden agendas are...
Question 2350: Which of the following statements BEST describes a work auth...
Question 2351: Herzberg identified factors which, if present, will lead to ...
Question 2352: Which of the following process is involved in making needed ...
Question 2353: What is the main purpose of project initiation?...
Question 2354: The project management executing processes include all of th...
Question 2355: What is the purpose of the following diagram? Exhibit: (Exhi...
Question 2356: Where is work packages described?...
Question 2357: Which of the following statements are FALSE regarding Monte ...
Question 2358: Quality control charts show a characteristic of the product ...
Question 2359: During execution in a project to build a major road bridge, ...
Question 2360: Which of the following statements are true about the work br...
Question 2361: Trend Analysis is best described as:...
Question 2362: A project was assessed and the following Earned value data h...
Question 2363: As a PMP, you will be required to comply with the PMP Code o...
Question 2364: A period of time in work weeks which includes non-working da...
Question 2365: Your client informs that his company has a problem with the ...
Question 2366: Which of the following makes up the project scope baseline?...
Question 2367: Conflict resolution techniques that may be practiced on a pr...
Question 2368: Creation of project objectives:...
Question 2369: Which of the following best determines the amount of authori...
Question 2370: Which of the following is not provided by the framework of a...
Question 2371: You are just leaving a meeting, during which you have been a...
Question 2372: A program is characterized as:
Question 2373: Methods and techniques used to examine cost and technical da...
Question 2374: Decomposition is
Question 2375: You are a contract project manager working with the State of...
Question 2376: Resource Leveling is a technique for:...
Question 2377: You are a project manager for Dakota Software Consulting Ser...
Question 2378: In which of the following scope management processes is the ...
Question 2379: A document which describes how project scope will be managed...
Question 2380: You are a project manager for the Swirling Seas Cruises food...
Question 2381: You are currently in process of prioritizing risks by their ...
Question 2382: You are the project manager for a sewage treatment plant. Th...
Question 2383: Which of the following are outputs of the Risk Management Pl...
Question 2384: Which of the following is NOT a tool of the Scope Definition...
Question 2385: Maximum intensity of conflicts occur over:...
Question 2386: You have been recently hired to be a project manager at a bi...
Question 2387: Which of the following represents the base point of Maslow's...
Question 2388: The authority to accept or reject a requested change in a la...
Question 2389: Project trade-offs vary between...
Question 2390: Which of the following is NOT an output of the Manage Stakeh...
Question 2391: Which of the following statements are not true regarding cor...
Question 2392: What should be done by a project team in the event of a situ...
Question 2393: During which phase of the project life cycle is the amount a...
Question 2394: A project manager is asked to select a contract type for a n...
Question 2395: There are three projects: Project A has an investment of $ 3...
Question 2396: In most jurisdictions, a legally required order of formal st...
Question 2397: Five people are involved on a project that requires signific...
Question 2398: The actual configuration of a PERT/CPM network _____ the amo...
Question 2399: Which of the following statements regarding risk register is...
Question 2400: Quality is:
Question 2401: You are in the process of numerically analyzing the effects ...
Question 2402: Which of the following is not true for Resource Leveling:...
Question 2403: A program can best be described as:...
Question 2404: For a project to be successful, what is the primary requirem...
Question 2405: You are the project manager for Design Your Web Site, Inc. Y...
Question 2406: Which of the following are TRUE regarding Bidder conferences...
Question 2407: Which describe BEST for the stakeholders?...
Question 2408: A change has occurred on your project. You've documented the...
Question 2409: In which of the following project management process group c...
Question 2410: You are constructing a probability and impact matrix for you...
Question 2411: You are using the three-point estimating technique to estima...
Question 2412: The organization of the project is very important for succes...
Question 2413: An activity that consumes no time or resources and shows onl...
Question 2414: Your project team has completed the project work. All of the...
Question 2415: Which of the following are not inputs to the develop prelimi...
Question 2416: You are a project manager of ABC company and you are working...
Question 2417: Which of the following scheduling methods uses more of the r...
Question 2418: At least _____of the cost of quality are the direct responsi...
Question 2419: You've promised your team two days of paid time off plus a w...
Question 2420: Which of the following tools/techniques can be used to help ...
Question 2421: Which of the following statement about Project Planning Meth...
Question 2422: You finished your project for a customer to implement a busi...
Question 2423: Which of the following represents a hierarchically organized...
Question 2424: What is the difference between management reserves and conti...
Question 2425: For a given characteristic in a construction process, the st...
Question 2426: In an organization, project managers report directly to the ...
Question 2427: Formal written correspondence is mandated in which of the fo...
Question 2428: A Project Status Report would include all of the following e...
Question 2429: A Project Manager must have good understanding of the mechan...
Question 2430: Please select which of the following statements is TRUE rega...
Question 2431: You are in the process of identifying and documenting risk p...
Question 2432: You are in the process of obtaining the necessary human reso...
Question 2433: Your project terminated early due to budget cuts. You' like ...
Question 2434: The most common definition of project success is:...
Question 2435: In which process would you be most likely use variable [or a...
Question 2436: Which of the following are false regarding corrective action...
Question 2437: Which of the following statement are false regarding Delphi'...
Question 2438: Benchmarking is a common tool used for:...
Question 2439: You are in the process of completing and selling each contra...
Question 2440: The auditing function that provides feedback about the quali...
Question 2441: Statistically independent The contractual statement of work ...
Question 2442: In which of the following processes in the initial process g...
Question 2443: A _______ is a series of actions bringing about a result....
Question 2444: Assumptions analysis, checklist analysis, and risk diagrammi...
Question 2445: CORRECT TEXT All of the following statements are true regard...
Question 2446: In which project management process group; project charter i...
Question 2447: You are taking over a project from another project manger du...
Question 2448: A(n) _____ is defined as a specified accomplishment in a par...
Question 2449: A contract is legally binding and must comprise all but one ...
Question 2450: A risk response which involves eliminating a threat is calle...
Question 2451: Which of the following does NOT assess the value a project b...
Question 2452: The delphi Method is best suited for:...
Question 2453: You are in the process of reviewing offers and choosing amon...
Question 2454: Which is not a negotiation tactic?...
Question 2455: You monitored figures on cost and planned/earned value for e...
Question 2456: You are a project manager for a company that sells online mu...
Question 2457: You are the project manager on a construction project. As yo...
Question 2458: Which of the following types of cost are relevant to making ...
Question 2459: What are the five project management process groups, in orde...
Question 2460: You are managing a construction project to install wiring in...
Question 2461: You are a project manager responsible for constructing a new...
Question 2462: Which project selection methods are use only in certain type...
Question 2463: Reasons for changing the staffing management plan include al...
Question 2464: All of the following are sources of conflict EXCEPT:...
Question 2465: Which of the following are not tools/ techniques of Manage S...
Question 2466: A(n) _____ system is designed to ensure the timely availabil...
Question 2467: Which of the following is not a process of Project Communcat...
Question 2468: An example of coercive power would be:...
Question 2469: The amount of authority a project manager possesses can be r...
Question 2470: Which of the following s most likely to require a rebaselini...
Question 2471: Control Costs is concerned with:...
Question 2472: Risk diagramming techniques include all of the following EXC...
Question 2473: _____________ involve(s) coordinating people and other resou...
Question 2474: Risk event is the precise description of what might happen t...
Question 2475: Which of the following areas are addressed in risk identific...
Question 2476: You do not expect the types of variances that have occurred ...
Question 2477: A project manager on a construction project includes a line ...
Question 2478: You are a project manager for Pizza Direct, which is a retai...
Question 2479: Which theory(s) prescribes a form of participative managemen...
Question 2480: Which of the following best describes the following organiza...
Question 2481: During the opening rounds of contract negotiation, the other...
Question 2482: All of the following are true regarding the Qualitative Risk...
Question 2483: In which of the following contract types is it easier to cha...
Question 2484: You are in the process of identifying and documenting the lo...
Question 2485: Which of the following processes is in the Initiating proces...
Question 2486: The person in the organization that authorizes the commencem...
Question 2487: All of the following scheduling techniques account for resou...
Question 2488: A process has Critical path of 12 days &amp; Standard Deviat...
Question 2489: You are the project manager for an information technology di...
Question 2490: You are managing an internationally dispersed project team. ...
Question 2491: Which is generally the least accurate....
Question 2492: One way to shorten your project schedule is to assign three ...
Question 2493: You are the manager of a major project to develop a system o...
Question 2494: Inputs to overall change control include all of the followin...
Question 2495: You are in process of reviewing all change requests and cont...
Question 2496: What is best used to calculate the profit from an internal p...
Question 2497: Affinity diagrams are used to:
Question 2498: You've identified a risk event on your current project that ...
Question 2499: You are the project manager for a new software development p...
Question 2500: You have been recently assigned to provide an accurate proje...
Question 2501: A project manager can exchange information with the project ...
Question 2502: A project manager you are mentoring comes to you for help be...
Question 2503: From a buyer's standpoint, which of the following is true?...
Question 2504: The key purpose of project control is to:...
Question 2505: One of your friends is project manager in Telecommunication ...
Question 2506: Earned value measurement is an example of:...
Question 2507: You are a fabulous project manager, and your team thinks hig...
Question 2508: You are in the process of controlling changes to the project...
Question 2509: During which of the following phases is a project's scope st...
Question 2510: What are the inputs to the Develop Project Charter process?...
Question 2511: Stock options, assigned parking spaces and a company car are...
Question 2512: Which of the following statements are FALSE regarding sensit...
Question 2513: To make an informed decision about buying insurance, the pro...
Question 2514: What are the inputs to project Plan Execution?...
Question 2515: Variables quality data are:
Question 2516: Three-point estimates are based on determining three types o...
Question 2517: What impact does a matrix organization have on project team ...
Question 2518: The Time Management Process that involves identifying and do...
Question 2519: Which is not an activity included in the Integrated change c...
Question 2520: Obtaining information from prospective sellers on how projec...
Question 2521: A graphical display of accumulated costs and labor hours for...
Question 2522: You are the project manager for Heartthrobs by the Numbers D...
Question 2523: Japanese resource management models exhibit....
Question 2524: A negative result from an SV calculation means which of the ...
Question 2525: Your hardware vendor left you a voicemail saying that a snow...
Question 2526: One way contract closure differs from administrative closure...
Question 2527: Which of the following statements best describes the respons...
Question 2528: A set of manual files made available to all team members is ...
Question 2529: In the closing phase of your project, a number of administra...
Question 2530: You are responsible for ensuring that your seller's performa...
Question 2531: Risks that may affect the project can be identified and orga...
Question 2532: You are a project manager for a telecommunications firm. You...
Question 2533: Which type of process involves the agency holding discussion...
Question 2534: The ability to get an individual or group to perform a given...
Question 2535: A scope change control defines the procedures by which the p...
Question 2536: You are giving your team instructions on how to perform a ne...
Question 2537: When should the Project schedule be developed?...
Question 2538: What two main knowledge areas are not listed in the executio...
Question 2539: Which of the following statements are FALSE regarding config...
Question 2540: A project customer and a contractor agreed on regular Qualit...
Question 2541: Project Plan includes:
Question 2542: You are in the process of reviewing all change requests and ...
Question 2543: Making need information available to project stakeholders in...
Question 2544: People are motivated by the need for achievement, power, or ...
Question 2545: A project may be defined as _____...
Question 2546: You are the project manager for a custom home-building const...
Question 2547: What is the purpose of the project charter?...
Question 2548: Fast-tracked projects awarded and begun before all planning ...
Question 2549: Sources for data on activity durations and resource requirem...
Question 2550: Your project team is on its way to finish work on the projec...
Question 2551: A project manager is creating a risk response plan. However,...
Question 2552: Japanese quality control has improved dramatically in the la...
Question 2553: The terms of union contracts are considered ______________ i...
Question 2554: Milestones are best characterized by which description?...
Question 2555: Which of the following is not an input to the Quality Contro...
Question 2556: According to James P. Lewis, which of the following is not p...
Question 2557: You are project manager and now you are middle of comparing ...
Question 2558: The outcome that must be produced to complete a part of a pr...
Question 2559: You are the project manager for a project. While reviewing t...
Question 2560: The positive value of conflict is underestimated. Properly m...
Question 2561: At the close of your project, you measure the customer satis...
Question 2562: Which of the following processes involves analyzing activity...
Question 2563: All the following statements are true about Analogous Estima...
Question 2564: The identification, definition, and selection of the project...
Question 2565: What should project managers focus on when they perform the ...
Question 2566: Qualitative risk analysis requires accurate data as its inpu...
Question 2567: According to
Question 2568: You are the project manager responsible for developing a new...
Question 2569: What is the lowest level in a work breakdown structure?...
Question 2570: Your company has asked you to be the project manager for the...
Question 2571: When all customer requirements for the product of the projec...
Question 2572: Which of the following statements are true?...
Question 2573: Which of the following statements are true regarding the cri...
Question 2574: Your project sponsor has asked you to produce a Risk Managem...
Question 2575: Which of the following describes a group of elated schedule ...
Question 2576: When should a risk be avoided?
Question 2577: You are in the process of directing the performance of plann...
Question 2578: A facilitator should...
Question 2579: Joe is an excellent programmer. He was promoted to a role of...
Question 2580: Which of the following is not an example of project integrat...
Question 2581: Which of the following statements BEST describes what projec...
Question 2582: You are the Chief Technology Officer of a major stock exchan...
Question 2583: Which of the following statements depicts the key difference...
Question 2584: The way a project manager sends and receives information dep...
Question 2585: At what stage of a project does the development of a cohesiv...
Question 2586: You are the project manager for a company that sells online ...
Question 2587: Most quality problems:
Question 2588: You are in the process of directing the performance of the p...
Question 2589: During project implementation the client interprets a clause...
Question 2590: The project schedule is not used to determine...
Question 2591: You are the project manager for a top-secret software projec...
Question 2592: Which of these types of matrix structure gives the project m...
Question 2593: A company is considering an investment of $80,000 at the pre...
Question 2594: You've decided to try your hand at project management in the...
Question 2595: You are a project manager for Star Light Strings. Star Light...
Question 2596: You are the project manager for Changing Tides video games. ...
Question 2597: You are the project manager within and information technolog...
Question 2598: A project manager believes that modifying the scope of the p...
Question 2599: The use of the project reports:...
Question 2600: If you are the project manager for a new project. You have c...
Question 2601: In communications management, to assimilate through the mind...
Question 2602: Which of the following statements are FALSE regarding the CP...
Question 2603: You have been recently assigned to provide an accurate proje...
Question 2604: Contract documentation are an input to the contract closure ...
Question 2605: All of the following are components of Project Integration M...
Question 2606: You are a project manager working on a software development ...
Question 2607: Sunk costs are:
Question 2608: Inputs to quality planning include...
Question 2609: Which of the following is not a typical reason for authorizi...
Question 2610: You are the project manager at information technology divisi...
Question 2611: You are about to begin negotiations with people from another...
Question 2612: All of the following should be included in the initial staff...
Question 2613: The utility of a risk seeker is:...
Question 2614: A project manager has just been assigned to a new project an...
Question 2615: You are the project manager within and information technolog...
Question 2616: Which of the following statements are true regarding Managem...
Question 2617: For every situation, several methods usually exist for effec...
Question 2618: Which of the following processes involves ensuring that risk...
Question 2619: Which of the following is NOT typically found in a project c...
Question 2620: Activity attributes identify multiple attributes associated ...
Question 2621: You are managing a project to develop nutritional soda for t...
Question 2622: Which of the following best describes the process of identif...
Question 2623: You are the project manager for the Late Night Smooth Jazz C...
Question 2624: Which of the following best describes decomposition?...
Question 2625: You are the project manager for a large construction project...
Question 2626: The quality objectives are approved in the conceptual stage ...
Question 2627: Which percent of the total project labor hours are typically...
Question 2628: Which statement relating to Core Processes and Facilitating ...
Question 2629: Which of the following Cost Management processes are concern...
Question 2630: Scheduling systems such as PERT, ADM, and PDM are project ma...
Question 2631: Identification of Mandatory Dependencies is done during whic...
Question 2632: Which devises and maintains a worktable scheme to accomplish...
Question 2633: What is the relative priority of project Cost, Schedule and ...
Question 2634: The main player in project communication is the...
Question 2635: The cost of a quality program should be budgeted at _____ of...
Question 2636: You are a project manager for Giraffe Enterprises. You've re...
Question 2637: Contracts may be called
Question 2638: Management By Objectives assumes that the team:...
Question 2639: Which of the following statements most accurately describes ...
Question 2640: Being the project manager in a software project which is cur...
Question 2641: Which equation correctly illustrates the cost variance of a ...
Question 2642: Which of the following is not an input into solicitation pla...
Question 2643: According to the PMBOK Guide, the project statement of work ...
Question 2644: A _____ estimate prepared from layouts, sketches and flowshe...
Question 2645: Without a _______ the project cannot start....
Question 2646: All the following are conflict resolution modes except:...
Question 2647: You are a project manager for Bluebird Technologies. Bluebir...
Question 2648: What is necessary to check whether the scope of the project ...
Question 2649: When your objective is to get a lasting win-win solution to ...
Question 2650: In project communications, the sender is responsible for:...
Question 2651: You are in the process of defining the specific activities t...
Question 2652: Which of the following statements regarding project charter ...
Question 2653: Product Reviews, Audits and walk-throughs are performed as p...
Question 2654: The most rapid Estimate Costs technique is:...
Question 2655: Which question is not appropriate for a weighting system to ...
Question 2656: Please refer to the diagram below: (Exhibit) Task1 -&gt; Tas...
Question 2657: What are the four parts of the communications model?...
Question 2658: Which process group includes processes used to formally term...
Question 2659: If a project has an 80% chance of having the scope defined b...
Question 2660: Contract file and formal acceptance and closure are outputs ...
Question 2661: What is the purpose of dummy actvity in an activityon-arrow ...
Question 2662: Your customer ask for a small change in the project, which w...
Question 2663: Hertzberg proposed that the satisfaction and dis-satisfactio...
Question 2664: Which of the following statements are TRUE regarding various...
Question 2665: Which of the following brings together a set of tools and te...
Question 2666: All of the following statements are true regarding ground ru...
Question 2667: Key stakeholders on every project do not include...
Question 2668: What are you likely to see as a project progresses in a sche...
Question 2669: What are correspondence, contract changes, and payment reque...
Question 2670: A WBS can be used foe all of the following EXCEPT:...
Question 2671: The members of your project team have been assigned to your ...
Question 2672: Company expenses such as auditing costs, supervision, office...
Question 2673: Inspections are a tool of perform quality process. They may ...
Question 2674: You are the project manager in the I.T department of the loc...
Question 2675: Which of the following project communication management proc...
Question 2676: While creating the agenda for a status meeting with the team...
Question 2677: Which of the following statements about the cost of quality ...
Question 2678: Which of the following is best for handling cross functional...
Question 2679: Which of the following best describes the following organiza...
Question 2680: An individual who is still working on the satisfaction of ph...
Question 2681: You are the project manager within an information technology...
Question 2682: You have been promoted to Manager, Continuous Process Improv...
Question 2683: Which of the following can the project manager use as a mean...
Question 2684: Good project objectives must be:...
Question 2685: You are the project manager at the Historie Shoppe, a rapidl...
Question 2686: Which of the following best describes the following organiza...
Question 2687: The risk management plan is a subset of the project manageme...
Question 2688: Quality audits when preformed correctly will provide the fol...
Question 2689: Which is not part of the purchasing cycle?...
Question 2690: Who has MOST of the power in projectized organization?...
Question 2691: To manage risks in your project, and communicate with stakeh...
1 commentQuestion 2692: You are the Chief Technology Officer of a major stock exchan...
Question 2693: Your project depends on a key deliverable from a vendor you'...
Question 2694: Which of the following are not common Barriers to project te...
Question 2695: After a status meeting, one of your team members, John, pull...
Question 2696: The detailed project scope statement includes all of the fol...
Question 2697: Which of the following is NOT included in the quality manage...
Question 2698: The proposal manager of your company approached you recently...
Question 2699: The standard types of communication include all but...
Question 2700: All the following statements relating to Cost Management Pla...
Question 2701: You are the project manager fro the large children's toy man...
Question 2702: Which of the following statements are true regarding the Exp...
Question 2703: The concept of the ______________ states that changes relate...
Question 2704: Projects can be authorized for all the following reasons exc...
Question 2705: You have been hired as a contract project manager for Grapev...
Question 2706: You r the project manager at a large accounting firm in the ...
Question 2707: A completion of a local government study resides on your cri...
Question 2708: You are the project manager within an information technology...
Question 2709: Which of the following is the MOST valuable result of creati...
Question 2710: Management reserves are normally defined as a % of the total...
Question 2711: Which is generally not regarded as one of the three categori...
Question 2712: It is useful to conduct project risk assessment according to...
Question 2713: Including the customer in the process of project planning is...
Question 2714: Reserve Analysis technique NOT used during __________....
Question 2715: Which of the following are not situations where pre-assignme...
Question 2716: Which of the following are NOT outputs of the Activity Durat...
Question 2717: Which of the following best describes a conflict resolution ...
Question 2718: 100 % inspection of output is:
Question 2719: Which of the following is true about the WBS...
Question 2720: You are the project manager at information technology divisi...
Question 2721: You are project manager at a construction company who is wor...
Question 2722: You are the project manger at a utility company. Due to the ...
Question 2723: Schedule model data, which is an output of the schedule deve...
Question 2724: Which of the following processes is involved with identifyin...
Question 2725: A key to successful Management by Objectives (MBO) is...
Question 2726: You've identified a risk event on your current project that ...
Question 2727: The project management execution processes include all of th...
Question 2728: Decision models used in project initiation include:...
Question 2729: You are a project manager of ABC company. You have created t...
Question 2730: Which of the following is referred to as sunk cost:...
Question 2731: You are in the process of identifying and documenting the pr...
Question 2732: The erection of foundation formwork before the placement of ...
Question 2733: A project management professional can compare earned value p...
Question 2734: Which is not a point used for Three-point estimation?...
Question 2735: You are a project manager of ABC company. You are currently ...
Question 2736: You are the project manager at a large construction company....
Question 2737: Your team has identified the risks on the project and determ...
Question 2738: Your company, Kick That Ball Sports, has appointed you proje...
Question 2739: Line of balance charts are used most frequently in:...
Question 2740: In the arrow diagramming method (ADM), _____ do not consume ...
Question 2741: At what point in the project is there the most risk of proje...
Question 2742: What happens if the level of conformance directly increases ...
Question 2743: You are responsible for the communication controls for the G...
Question 2744: You are in the process of monitoring the various project pro...
Question 2745: Activity definition inputs include all except:...
Question 2746: You are a project manager working on gathering requirements ...
Question 2747: All of the following statements are true regarding the cost ...
Question 2748: Fixed-price and incentive-type contracts place responsibilit...
Question 2749: The inputs to Cost Budgeting includes all of the following e...
Question 2750: Cost Budgeting is defined as:
Question 2751: Which of the following statement regarding competitive metho...
Question 2752: One of your friends is a project manager at a computer secur...
Question 2753: You are the project manager at a company developing an onlin...
Question 2754: Which of the following is or are a part of Solicitation proc...
Question 2755: Some of the functions of this process include describing the...
Question 2756: Reserve Analysis involves:
Question 2757: Project management provides organizations with a methodology...
Question 2758: Design of experiments is an analytical technique which helps...
Question 2759: A cost-plus-percentage-cost (CPPC) contract has an estimated...
Question 2760: Which of the following factors has the most impact on the co...
Question 2761: A program is defined in the PMBOK as:...
Question 2762: The most important criteria in selecting project selection m...
Question 2763: You are the project manager responsible for developing a new...
Question 2764: Which statement describes best handling of assumptions durin...
Question 2765: You receive 25 new computers from the seller, but were expec...
Question 2766: What is not a major benefit of co-locating team members from...
Question 2767: Which of the following BEST describes the contents of a WBS ...
Question 2768: Which of the following statements are true regarding the SPI...
Question 2769: Qualitative risk analysis requires accurate data as its inpu...
Question 2770: What is commonly the purpose of the Manage stakeholders proc...
Question 2771: Which of the following is NOT part of the Contract Closure p...
Question 2772: The primary function of the Closing processes is to perform ...
Question 2773: In dealing with the client/customer, the project manager sho...
Question 2774: Free float is the amount of time that an activity may be del...
Question 2775: You are in the process of creating a project plan for the la...
Question 2776: Activity A has a duration of 3 days and begins on the mornin...
Question 2777: Dennis works for an international manufacturer of consumer e...
Question 2778: You are a project manager at java ice cream factory. You are...
Question 2779: There is project with CPI of 0.81 and TCPI=1.00001 this proj...
Question 2780: A Pareto diagram can be best described as:...
Question 2781: You are in the process of directing the performance of plann...
Question 2782: Your nonprofit organization is preparing to host its first a...
Question 2783: All of the following can be used to reduce the amount of con...
Question 2784: A project manager for a small construction company has a pro...
Question 2785: Which of the following statements are TRUE regarding the dif...
Question 2786: Projects frequently do not meet customer expectations from w...
Question 2787: Which of the following statements are FALSE regarding the Re...
Question 2788: Reaching an understanding of concessions is accomplished in ...
Question 2789: A process characteristic has a true mean of 150 and a true s...
Question 2790: A network diagram that uses nodes to represent activities an...
Question 2791: Project managers must know:
Question 2792: Your project is coming to an end, and you are in the process...
Question 2793: All of the following are outputs of the Risk Monitoring and ...
Question 2794: Which ensures that project objectives are met by monitoring ...
Question 2795: What is the foundation for team development?...
Question 2796: You are the project manager for Heartthrobs by the Numbers D...
Question 2797: Which of the following best describes progressive elaboratio...
Question 2798: Over the life cycle of the project, the quality of informati...
Question 2799: Under the terms of 2/10 net 30, the buyer may:...
Question 2800: Planning components are tools of activity definition process...
Question 2801: Filling vacant positions by recruiting within the organizati...
Question 2802: You are preparing project performance appraisals and have de...
Question 2803: How much time does the typical project manager spend communi...
Question 2804: You have just been given a new project and are creating the ...
Question 2805: Response Planning is the responsibility of the functional ar...
Question 2806: An example of a project is:
Question 2807: You are the project manager working on a research project fo...
Question 2808: When referring to inputs for schedule development, responsib...
Question 2809: What does one call the person responsible for the funding fo...
Question 2810: An output of the scope change control process is:...
Question 2811: Which of the following describes the cost of quality associa...
Question 2812: The project manager should be assigned ___________ as an out...
Question 2813: The major reason why a project manager would use written ins...
Question 2814: Using "I" or "My' instead of "most people" or "our group" __...
Question 2815: You are a contract project manager working with the State of...
Question 2816: Which of the following might require rebaselining of the cos...
Question 2817: Which of the following is not an input into procurement plan...
Question 2818: Which of the following is an input to the information distri...
Question 2819: Product verification is usually performed in closing process...
Question 2820: Which of the following contracts has the MOST risk for the b...
Question 2821: Which of the following statements are not true?...
Question 2822: Which of the following statements are true regarding the pro...
Question 2823: Middle (functional) managers have the greatest influence in ...
Question 2824: Your client, with which you have good relations, wants you t...
Question 2825: The risk management plan us a major component of...
Question 2826: Which of the following is NOT an indirect cost?...
Question 2827: In which of the following documents will you find specific p...
Question 2828: Which of the following is least likely to be a source of con...
Question 2829: You are a project manager for the manufacture of children's ...
Question 2830: Which of the following estimates would MOST accurately refle...
Question 2831: Inputs to Team Development include all except...
Question 2832: You are a project manager at a real estate company that deve...
Question 2833: Risk diagramming techniques include all of the following exc...
Question 2834: You've been hired as manager to design and construct a new c...
Question 2835: You are a project manager at a historic Shoppe, a rapidly gr...
Question 2836: Team motivation, problem resolution, and space verification ...
Question 2837: As part of your project team's quality control procedures, y...
Question 2838: Which of the following is NOT a tool or technique of Qualita...
Question 2839: All of the following statements are TRUE regarding ground ru...
Question 2840: Your current project has over 200 specs, 350 engineering dra...
Question 2841: Which of the following options is irrelevant to the resource...
Question 2842: A risk impact scale that uses rank-ordered values as very lo...
Question 2843: You are a project manager at a real estate company that deve...
Question 2844: An ad hoc group that discusses variances to the baselines, a...
Question 2845: If the message is very complex, the best method that can be ...
Question 2846: The formalization of management's attitude toward risk is ca...
Question 2847: You are a project manager for an international marketing fir...
Question 2848: Which process recognizes that a project or phase should begi...
Question 2849: You took over a customer project for your company. From the ...
Question 2850: Approved corrective actions are an input to which process?...
Question 2851: The time phased budget that is used to measure and monitor c...
Question 2852: You are the Project Manager for a construction project. Your...
Question 2853: The process of interpreting a message is:...
Question 2854: Your project schedule has slipped by 2 weeks, and you have t...
Question 2855: The project stakeholders should be actively involved with th...
Question 2856: A work breakdown structure is a:...
Question 2857: Which of the following are inputs to the Source Selection Pr...
Question 2858: Which of the following project quality management process is...
Question 2859: The Estimate At Completion (EAC) can be used to forecast the...
Question 2860: In which stage of the negotiation meeting are points of conc...
Question 2861: Your project is in the final test stage, the user acceptance...
Question 2862: While reviewing project performance, the project manager det...
Question 2863: What percentage of sales is estimated to be the cost of non-...
Question 2864: Subject matter experts are resources that can provide very v...
Question 2865: Historical record from previous project are generally used f...
Question 2866: Which of the following is true regarding schedule variances?...
Question 2867: Which of the following statements concerning acceptance samp...
Question 2868: Who has more control in a strong matrix organization?...
Question 2869: Which conflict resolution technique is most effective?...
Question 2870: You are the project manager at a large accounting firm in th...
Question 2871: As part of your project plan you must develop an effective m...
Question 2872: Your team has identified a risk with some of the chemicals y...
Question 2873: Which organization, the project manager has total control of...
Question 2874: You are the project manager at a utility company. Due to the...
Question 2875: A project manager in a predominantly hierarchical organizati...
Question 2876: Which of the following best characterizes Six Sigma?...
Question 2877: Using the PMBOK definition of contingency reserve, which of ...
Question 2878: A variance envelope has been established on a project. The e...
Question 2879: You are working on a project that will upgrade the phone sys...
Question 2880: In a matrix organization, the team members are responsible t...
Question 2881: Integrated change control includes the following activities ...
Question 2882: Which of the following is illustrated by a resource histogra...
Question 2883: Please refer to the exhibit. You have been recently assigned...
Question 2884: What is not among the tools and techniques of Organizational...
Question 2885: During your project meeting, a problem was discussed, and a ...
Question 2886: There are likely to be team loyalty issues in a matrixed env...
Question 2887: The computation for Cost Performance Index is:...
Question 2888: Which of the following statement is FALSE about progressive ...
Question 2889: Which of the following tools and techniques are commonly use...
Question 2890: What is the primary motivational tool of quality Theory X?...
Question 2891: When comparing the cost of competing projects, which of the ...
Question 2892: You are the project manager responsible for developing a new...
Question 2893: In order to achieve long-term quality improvements, manageme...
Question 2894: A fixed-price-plus-incentive-fee (FPI) contract has a target...
Question 2895: Which of the following is NOT one of the triple constraints?...
Question 2896: You are the project manager at a manufacturer of electronic ...
Question 2897: You have been assigned to a project in which the objectives ...
Question 2898: All of the following are outputs of the scope definition pro...
Question 2899: You are the project manager at a large automaker in Japan. Y...
Question 2900: Which of the following are not the direct result of managing...
Question 2901: Which of the following are least found to as a part of proje...
Question 2902: A parametric modeling technique will be accurate in predicti...
Question 2903: All of the following are true of Pareto diagrams except...
Question 2904: Risks that cannot be identified or evaluated _____ ....
Question 2905: You are the project manager for a software development proje...
Question 2906: Which is not a goal in both Project management and Quality m...
Question 2907: ___________ coordinates people and other resources to carry ...
Question 2908: All of the following are he benefits of using WBS except:...
Question 2909: Over half of conflicts on projects are caused by:...
Question 2910: Which document is developed along the risk management proces...
Question 2911: Which of the following is NOT a part of the preliminary scop...
Question 2912: You are a project manager responsible for constructing a new...
Question 2913: Which of the following is indicative of negative float?...
Question 2914: Resource leveling will often affect the project by making it...
Question 2915: Which conflict resolution style emphasizes agreement rather ...
Question 2916: All of the following are environmental factors that should b...
Question 2917: Which of the following is an input to Cost Estimating?...
Question 2918: Of the following, who has the ultimate responsibility for me...
Question 2919: Using the information provided, if a project manager require...
Question 2920: Every status meeting should have time allotted for Risk Moni...
Question 2921: In which process do you create the Risk Breakdown Structure?...
Question 2922: Project life cycles provide a better means of measurement of...
Question 2923: Which of the following statements are false regarding contra...
Question 2924: Screening of risk events for potential risk is known as ____...
Question 2925: ___________ must be measured regularly to identify variance ...
Question 2926: Which technique would you apply to control the project sched...
Question 2927: You are conducting a status meeting and monitoring your risk...
Question 2928: For communication to occur, there must be:...
Question 2929: The project manager and project sponsor are discussing the p...
Question 2930: According to Herzbergs theory, all the following are motivat...
Question 2931: Keeping up with the growth was becoming a problem for a priv...
Question 2932: What is not true for project deliverables?...
Question 2933: Which of the following is true concerning evaluation criteri...
Question 2934: Your project involves the research and development of a new ...
Question 2935: Project Stakeholder are:
Question 2936: A work authorization system is:...
Question 2937: Which is not a part of the project cost baseline but is incl...
Question 2938: Which of the following is an output of Define Scope?...
Question 2939: You are a project manager for Laurel's Theater Productions. ...
Question 2940: As a project manager on a software development project you a...
Question 2941: Approval to proceed is normally made at the end of the _____...
Question 2942: You are in process of completing and settling each contract ...
Question 2943: You are the project manager for a construction company that ...
Question 2944: Activity cost estimates and its supporting details are outpu...
Question 2945: Communication plays a major role in:...
Question 2946: Projects may be chartered by all of the following bodies, ex...
Question 2947: Consider the following situation: The customer was given a m...
Question 2948: Communication Planning involves determining the information ...
Question 2949: Performing the administrative closure process includes all o...
Question 2950: With respects to the cost of quality, which of the following...
Question 2951: Change requests can occur due to:...
Question 2952: Employee unions would most likely satisfy which level in Mas...
Question 2953: All of the following statements are true regarding the ADM m...
Question 2954: You are a project manager for Cinema Snicker Productions. Yo...
Question 2955: Tom is a project manager on an industrial design project. He...
Question 2956: Activities with zero time duration are referred to as:...
Question 2957: Which of the following statements are TRUE regarding various...
Question 2958: Which of the following are NOT benefits of meeting quality r...
Question 2959: You are in process of developing an approved project schedul...
Question 2960: Administrative closure procedure for a project phase does no...
Question 2961: Standard of purchased material:...
Question 2962: Which of the following is NOT included in activity duration ...
Question 2963: When should a project manager be assigned to a project?...
Question 2964: Which of the following statements is true regarding Close Pr...
Question 2965: Which of the following is an output of Direct and Manage Pro...
Question 2966: During a post-mortem meeting, discussions come up who has to...
Question 2967: As project manager, you prepare written input to the perform...
Question 2968: Which of the following statements is MOST true regarding Act...
Question 2969: You are a project manager working on a new software product ...
Question 2970: You are a project manager for the manufacture of children's ...
Question 2971: In which of the following circumstances is it BEST to make u...
Question 2972: You are the project manger of a software project. Two develo...
Question 2973: During what Time Management Process are the specific activit...
Question 2974: Which of the following is NOT considered an organizational p...
Question 2975: Which of the following are technical staffs particularly res...
Question 2976: You have just completed Qualitative Risk Analysis of the pro...
Question 2977: You are using a Pareto chart to examine the defects that hav...
Question 2978: The CFO wants to know how the project is going. You put toge...
Question 2979: What is one of the KEY objectives during contract negotiatio...
Question 2980: You are the project manager for a top-secret software projec...
Question 2981: Which of the following types of contracts requires the great...
Question 2982: The swiftest and most effective communications take place am...
Question 2983: You are a project manager at a biotech company, where you ar...
Question 2984: Which of the following is not an organizational policy consi...
Question 2985: Your hardware vendor left you a voicemail saying that a snow...
Question 2986: You have been hired by a contractor, who wants you to manage...
Question 2987: All of the following are tools and techniques of the Contrac...
Question 2988: The difference between the BCWS and the BCWP is referred to ...
Question 2989: Which of the following describes the assumptions made by the...
Question 2990: You are considering whether to buy or make a software produc...
Question 2991: You are the project manager for developing a next-generation...
Question 2992: Which of the following is formalized document that authorize...
Question 2993: Which of the following are NOT parts of the PMI professional...
Question 2994: Your friend Robert has recently achieved his PMP certificati...
Question 2995: Which of the following statements are FALSE regarding Projec...
Question 2996: Which of the following questions is a functional Manager mos...
Question 2997: Project Managers have least power in which organization stru...
Question 2998: The activity list should include descriptions of activities....
Question 2999: Which of the following is NOT an output of the Close Project...
Question 3000: Which method of conflict resolution tends to be the most eff...
Question 3001: What would be the cost performance index if BCWP =350, ACWP ...
Question 3002: Managerial Reserves are:
Question 3003: A WBS is an input to all of the processes EXCEPT:...
Question 3004: You are currently in the process of analyzing activity seque...
Question 3005: You have been hired as a project manager for a local bank. B...
Question 3006: A team that is just forming needs:...
Question 3007: You are the project manager of a company that is building AT...
Question 3008: What is typical for high-context cultures?...
Question 3009: You are a project manager for a company that sells online mu...
Question 3010: What is critical path?
Question 3011: A management control that rarely changes, and then only in r...
Question 3012: _____ is a receipt issued by a carrier for merchandise to be...
Question 3013: Your company manufactures small kitchen appliances. It is in...
Question 3014: You are running a major project with four sub-projects. Each...
Question 3015: Quality may be defined as:
Question 3016: Which of the following BEST describes when you perform the M...
Question 3017: All of the other alternatives apply Which of the following s...
Question 3018: CORRECT TEXT You have been recently hired to be a project ma...
Question 3019: You are approximately 30% through your project and the spons...
Question 3020: Which of the following statements are true regarding project...
Question 3021: Project files, project software, and shared folders are exam...
Question 3022: A work authorization system is a _________________ for sanct...
Question 3023: Which of the following best describes Maslow's theory of mot...
Question 3024: An Activity has an Optimistic estimate of 1.0 days, pessimis...
Question 3025: The methods and techniques for determining the economic cost...
Question 3026: Which of the following are true regarding the critical path ...
Question 3027: Final risk quantification considers total risk impacts and _...
Question 3028: One of your friends is a manager at telecommunications compa...
Question 3029: Quality and _____ are directly related....
Question 3030: Which of the following is not an input to Team Development?...
Question 3031: Parametric estimates are based on variables such as:...
Question 3032: You are a project manager for a company that sells online mu...
Question 3033: Make payment to seller is done in _______ ....
Question 3034: All the following statements related to Just In Time Manufac...
Question 3035: Which of the following contracts should you use for projects...
Question 3036: You are in the process of controlling changes to the project...
Question 3037: The VP of sales division approaches you and requests that yo...
Question 3038: You are project manager responsible for constructing a new s...
Question 3039: CORRECT TEXT All of the following statements are true regard...
Question 3040: When a project is initiated, one of the first deliverables f...
Question 3041: Which cost is not recoverable?
Question 3042: Project selection criteria cover management concerns such as...
Question 3043: For the following group of numbers: 80, 10, 10, 50, 70 and 9...
Question 3044: Please refer to this Decision Tree which shows the analysis ...
Question 3045: All the following statements about Cost Baseline are correct...
Question 3046: You are in the process of directing the performance of a pla...
Question 3047: Which of the following actions are irrelevant when the criti...
Question 3048: Which of the following are usually illustrated by bar charts...
Question 3049: Project cost management must consider the effect of project ...
Question 3050: The key ingredient to a successful quality management progra...
Question 3051: Which of the following is not considered a constraint in Org...
Question 3052: Which of the following organizational forms would be likely ...
Question 3053: You are the program manager for a new commercial jet. A new ...
Question 3054: All of the following statements are true regarding Ishikawa ...
Question 3055: Which of the following organization holds the project manage...
Question 3056: The most common communication problem during negotiations is...
Question 3057: You are the project manager at an utility company. Due to th...
Question 3058: Before you begin the cost budgeting process for building a n...
Question 3059: Which of the following is the LEAST effective way to influen...
Question 3060: Inputs to cost estimating include the following...
Question 3061: Feasibility studies evaluate alternatives in terms of...
Question 3062: In preparing for a team meeting you want to let the team kno...
Question 3063: Network schedules are prepared during the _____ phase and up...
Question 3064: Technique used to evaluate the degree to which the data abou...
Question 3065: You are the Chief Technology officer of a major Stock Exchan...
Question 3066: In the phase sequence defined by project life cycles, a phas...
Question 3067: Which is not an example of a correctly handled Contract clos...
Question 3068: You have just prepared an RFP for release. Your project invo...
Question 3069: You are managing an internal project where a vice president ...
Question 3070: The following diagram depicts a cumulative likelihood distri...
Question 3071: During execution of your project you observed that a team me...
Question 3072: Which of the following statements describes quality control?...
Question 3073: Which of the following is not true for a Responsibility Assi...
Question 3074: In communications management, to assimilate through the mind...
Question 3075: In the PDM, common constraints include:...
Question 3076: What is the purpose of the Project Plan?...
Question 3077: A company attorney, newly hired by the company, walks into t...
Question 3078: You are managing a software project. During a walkthrough of...
Question 3079: The project Manager determines that 100% inspection is requi...
Question 3080: What is often referred to as the Original duration of an act...
Question 3081: There are two major types of reserves used on projects. The ...
Question 3082: Which is not a part of the project cost baseline but is incl...
Question 3083: Which of the following are not tools/techniques of the devel...
Question 3084: The widget production project is well underway. The requirem...
Question 3085: Which of the following statements are true regarding the pro...
Question 3086: You are the project manager for a software company that deve...
Question 3087: Since you are in the preliminary stages of your project, you...
Question 3088: You are the project manager for the Heart of Texas casual cl...
Question 3089: With triangular distribution, the low, likely and high value...
Question 3090: You are in the process of estimating the type of and quantit...
Question 3091: Which is true about a work breakdown structure?...
Question 3092: The ability of a product to be used for different purposes a...
Question 3093: You are an information security project manager responsible ...
Question 3094: A project manager is running into problems with the team. Pe...
Question 3095: Your new product development project has resulted in a highl...
Question 3096: A Gantt chart is useful in determining...
Question 3097: An advertiser who uses a movie or sports star to endorse a p...
Question 3098: When should the project expeditor form of organization be us...
Question 3099: Information retrieval systems, information distribution meth...
Question 3100: The Delphi Method is well-suited for:...
Question 3101: Non-conformance penalties are a form of _____....
Question 3102: There are hard causes of conflict (e.g. conflicting schedule...
Question 3103: Which of the following activities can be considered as part ...
Question 3104: Project risk is characterized by three factors. What are the...
Question 3105: Which of the following facets of a project are usually affec...
Question 3106: Cost of quality includes:
Question 3107: Residual and secondary risks are outputs from...
Question 3108: Which of the following describes the Executing process group...
Question 3109: The role of the _____ can be invaluable in problem solving....
Question 3110: Which of the following methods is least likely to be used fo...
Question 3111: An element in the WBS was estimated to require 1 month for c...
Question 3112: ADM is an activity-on-arrow method. In this method, a dummy ...
Question 3113: A single source seller is ____________....
Question 3114: To the extent possible, final contract language should refle...
Question 3115: Quality audits are a tool/technique of which of the followin...
Question 3116: Who is responsible to publish project charter?...
Question 3117: Most schedule simulations are based on some form of which of...
Question 3118: Which of the following is the cost-effective rule for shorte...
Question 3119: The extent of project management techniques to be used on a ...
Question 3120: Your company is constructing a dam and your project (which i...
Question 3121: A project manager has finished the project. He knows that th...
Question 3122: Which of the following types of contracts is equivalent to a...
Question 3123: While obtaining responses from prospective sellers, you ment...
Question 3124: Which of the following statements is true regarding brainsto...
Question 3125: Which of the following are not tools/ techniques of the acti...
Question 3126: The project life-cycle can be described as:...
Question 3127: Your team has recommended a change to the scope verification...
Question 3128: Which organization has set the de facto standards for projec...
Question 3129: The primary consideration of product management is to know t...
Question 3130: When a project manager is running over the budgeted costs, t...
Question 3131: Which of the following describes how the various risk manage...
Question 3132: You are the project manager at Happy Coffee Cafe, a rapidly ...
Question 3133: The state of being totally answerable for the satisfactory c...
Question 3134: You are in the process of reviewing all change requests and ...
Question 3135: Which of the following is based on an individual identificat...
Question 3136: Your friend is a project manager at a real estate company th...
Question 3137: Which of the following statements are FALSE regarding rollin...
Question 3138: Which of the following statements are FALSE regarding propos...
Question 3139: All of the following are true regarding stakeholder analysis...
Question 3140: A project manager discovers that a project problem has occur...
Question 3141: If the acceptance sampling attribute for a production lot is...
Question 3142: Management by Objectives (MBO)
Question 3143: Selective perception is _____ of new conflicting information...
Question 3144: Which of the following statements are true regarding the ris...
Question 3145: You are a project manager who has recently held a project te...
Question 3146: Which of the following statements are true regarding project...
Question 3147: Which of the following consists of tools and techniques used...
Question 3148: Resource reallocation from non critical to critical activiti...
Question 3149: Your team members have just completed training on specialize...
Question 3150: Exhibit: Please refer to the exhibit. (Exhibit) What is the ...
Question 3151: A project has experienced significant delays due to equipmen...
Question 3152: When should a Time and material contract with a contractor b...
Question 3153: Scope definition is important to the success of the project ...
Question 3154: Which is the Estimate Costs technique used most frequently i...
Question 3155: Inputs to risk management include...
Question 3156: You are the project manager within an information technology...
Question 3157: You have been asked to submit a proposal for a project that ...
Question 3158: Configuration (baseline) control monitors performance agains...
Question 3159: Which of the following tools/ technique of the quality plann...
Question 3160: You are the controller on your project. Your project manager...
Question 3161: When is the BEST time to have project kickoff meetings?...
Question 3162: Which of the following statements are false regarding the re...
Question 3163: A project manager is creating a report of the final status o...
Question 3164: What is the primary purpose of a milestone chart?...
Question 3165: During project team formation and during the early phases of...
Question 3166: Which of the following best describes the schedule developme...
Question 3167: Your sponsor announce to you and your team that his/her door...
Question 3168: Who are the audience of project charter?...
Question 3169: The sum of the products and services to be provided as a pro...
Question 3170: Project cost control includes all of the following EXCEPT:...
Question 3171: You are in the process project a project schedule for repain...
Question 3172: In Configuration management, which of the following is neces...
Question 3173: Which of the following are the part of WBS dictionary except...
Question 3174: You are the part of construction project team responsible fo...
Question 3175: Which is not included in Performance improvements:...
Question 3176: Which of the following statements are false regarding RACI c...
Question 3177: The five major cost categories of quality are _____ ....
Question 3178: You assigned staff members to activities, estimated work and...
Question 3179: Which of the following statements regarding WBS is false?...
Question 3180: Your management applies the 10 percent solution: It has requ...
Question 3181: An example of risk mitigation is:...
Question 3182: One of your friends is a project manager at a computer secur...
Question 3183: According to Herzberg, which of the following is a motivatio...
Question 3184: Attributes quality data are:
Question 3185: You are in the process of developing an approximation of the...
Question 3186: When subordinates know pertinent information that is not kno...
Question 3187: You are having lunch with one of your colleagues. He tells y...
Question 3188: Management Contingency Reserve is identified in which proces...
Question 3189: Constraints do not include:
Question 3190: It is a generally acceptable practice that if one of your cl...
Question 3191: You are working on a project that is similar in scope to a p...
Question 3192: Which of the following formulas is used to calculate the CPI...
Question 3193: The most effective team motivator is:...
Question 3194: Which of the following is not an activity of configuration m...
Question 3195: Which of the following best describes the following organiza...
Question 3196: Budgeted contingencies can be determined by:...
Question 3197: You are the project manager at the Java Ice Cream Factory. Y...
Question 3198: The project scope management plan is an output of which of t...
Question 3199: All the following statements relating to communication manag...
Question 3200: The information-gathering techniques used in the Risk Identi...
Question 3201: What is not a reason for companies to organize Lessons learn...
Question 3202: Thomas is a project manager at a biotech company. He is an e...
Question 3203: You have just completed the project planning process group, ...
Question 3204: You are a project manager for Move It Now trucking company. ...
Question 3205: Quality attributes
Question 3206: All of the following are different dimensions of communicati...
Question 3207: The capacity to get an individual or group to perform a give...
Question 3208: The receiver filters messages based on all but the following...
Question 3209: When should Lessons learned be organized?...
Question 3210: What is typical for Critical chain project management?...
Question 3211: During project execution you found out that work is often no...
Question 3212: You are in the process of directing the performance of the p...
Question 3213: Which of the following best describes why one would use a re...
Question 3214: You are the project manager for the international contract m...
Question 3215: A summary activity describes a group of related schedule act...
Question 3216: Most project management leadership theories focus on all of ...
Question 3217: Product analysis is a / technique of which of the following ...
Question 3218: The _____________ task relationship is defined by the activi...
Question 3219: Your project team has already created the WBS, developed est...
Question 3220: Which of the following are not the direct results of managin...
Question 3221: You are the project manager at a large accounting firm in th...
Question 3222: The purpose of the review of deliverables and project perfor...
Question 3223: The contract management plan is an output of which process?...
Question 3224: Which influence reflects an informal organization?...
Question 3225: The administrative closure procedure that is an output of th...
Question 3226: An employee approaches you and asks to tell you something in...
Question 3227: Contract documentation is an input to the Contract Closure p...
Question 3228: Your project selection committee used a weighted scoring mod...
Question 3229: A work breakdown structure:
Question 3230: Which of the following is an element of procurement manageme...
Question 3231: A scope management plan describes:...
Question 3232: Which of the following is the most complex type of project s...
Question 3233: When performing scope control, which of the following option...
Question 3234: The Preliminary Scope Statement which is and output of the D...
Question 3235: Project risk is characterized by three factors: _____....
Question 3236: Which of the following describes tool/ technique where expen...
Question 3237: A make or buy analysis is used as:...
Question 3238: You are the project manager at Day-Old donuts a rapidly grow...
Question 3239: The budgeted cost of the work performed (BCWP) for a task th...
Question 3240: You are about to close a project which comprises of the deve...
Question 3241: You are the project manager on an information technology pro...
Question 3242: Which of the following types of power is the most effective ...
Question 3243: During which stage of Risk planning are risks prioritized ba...
Question 3244: On a precedence diagram, the arrow between two boxes is call...
Question 3245: The party that needs the change resulting from the project, ...
Question 3246: You are using the three points estimating techniques to esti...
Question 3247: One document which contain the business need of the project,...
Question 3248: Which of the following statements are NOT true?...
Question 3249: Estimated at Completion is determined by:...
Question 3250: The process of choosing/documenting the best approach to ach...
Question 3251: Contract Negotiation is carried out as part of :...
Question 3252: The process of developing a written scope statement as the b...
Question 3253: Standard "Shewhart" control charts assume that the distribut...
Question 3254: Which of the following statements are true regarding the pro...
Question 3255: A significant difference between independent estimates and p...
Question 3256: Your team is split between two buildings on either side of t...
Question 3257: Completion of the _____________ scope is measured against th...
Question 3258: All of the following are outputs of the Integrated Change Co...
Question 3259: In a fishbone diagram, the effect you are concerned about is...
Question 3260: Which of the following is NOT an essential regarding a proje...
Question 3261: Who has the cost risk in a fixed price (FP) contract?...
Question 3262: By which means is a contractor able to control cost overruns...
Question 3263: Which of the following is an output of Verify Scope?...
Question 3264: A factor that limits the project team's options, such as a p...
Question 3265: Team Development is a very critical component of Human Resou...
Question 3266: A poorly defined staffing management plan will LEAST directl...
Question 3267: Post mortem Earned value analysis of a project which is goin...
Question 3268: You are the Project Manager for an aircraft manufacturing co...
Question 3269: Which of the following statements re true regarding Herzberg...
Question 3270: A particular process has two independent sources of variatio...
Question 3271: Which of the following is the configuration management activ...
Question 3272: You're managing a project that is currently executing. You'r...
Question 3273: If a project needs to be terminated early, then you will hav...
Question 3274: What is Team Development?
Question 3275: Which organization is same as Functional organization?...
Question 3276: As a project manager of a construction company, you always p...
Question 3277: You are managing a project to build a new wing onto a local ...
Question 3278: What is least important when it comes to archiving project r...
Question 3279: During which project management process are risk and stakeho...
Question 3280: Project cost control includes all of the following EXCECPT:...
Question 3281: Which of the following helps a project manager determine pos...
Question 3282: You are managing a construction project to install new door ...
Question 3283: If a project manager is using observation and conversation t...
Question 3284: Your project's primary constraint is quality. To make certai...
Question 3285: The project manager, when communicating with an action-orien...
Question 3286: Top three cases on conflict on the project and project sched...
Question 3287: In performing an impact analysis, the most effective tool to...
Question 3288: Which of the following best describes the amount of time one...
Question 3289: During the course of a project you have motivated team membe...
Question 3290: You are a project manager of ABC organization. You are estim...
Question 3291: You are the project manager for the information technology d...
Question 3292: The Japanese Quality Control (QC) Circle movement motivated ...
Question 3293: Which of the following statement are true regarding the CPI ...
Question 3294: Which of the following best describes progressive elaboratio...
Question 3295: Which of the following diagramming methods can only use fini...
Question 3296: As a project manager, you must demonstrate transparency in.....
Question 3297: You are the project manger at a leading manufacturer of cons...
Question 3298: All of the following statements about the project charter ar...
Question 3299: Which of the following is considered during the Procurement ...
Question 3300: Your project exceeded costs in the past caused by an underes...
Question 3301: The purpose of project Risk Management is to:...
Question 3302: Reserve analysis is a tool/ technique in all of the followin...
Question 3303: Formal acceptance by the client or sponsor of the project sh...
Question 3304: Scope reporting is the timely determination, _____, and ____...
Question 3305: Which of the following describes the longest path through a ...
Question 3306: There are four methods of government procurement. Which is n...
Question 3307: Manual filing systems, electronic text databases, and projec...
Question 3308: The three major types of communication are:...
Question 3309: Tools and techniques of procurement planning include...
Question 3310: What is the lowest level in a WBS called?...
Question 3311: In WBS diagramming, the work package is:...
Question 3312: Which of the following statements are true regarding the Ris...
Question 3313: Which of the following statements are true regarding Project...
Question 3314: The Contract management plan differs from the Procurement ma...
Question 3315: Which of the following statement(s) about project customer a...
Question 3316: You are the project manager for Changing Tides video games. ...
Question 3317: All of the following are common uses for a "War Room" except...
Question 3318: In your project, a team member suggested the addition of a f...
Question 3319: The use of quality circles:
Question 3320: You are a PM at a pharmaceutical company. You are the projec...
Question 3321: Risk Event Status is defined as _____ ....
Question 3322: You have accepted a position at a company where you will man...
Question 3323: Which of the following is the amount of time that a schedule...
Question 3324: Work authorization forms are needed in order to:...
Question 3325: You are the project manger at a biotech company, where you a...
Question 3326: A management point in a Work breakdown structure (WBS), whic...
Question 3327: The lowest dollar amount 'at stake' is associated with the f...
Question 3328: Which factors have the strongest influence on customer satis...
Question 3329: All of the following are typical concerns of matrixed team m...
Question 3330: What is the purpose of the responsibility assignment matrix ...
Question 3331: You have been recently been assigned to provide an accurate ...
Question 3332: Effective communication is critical for project success. Sco...
Question 3333: All of the following can be used to estimate the contingency...
Question 3334: Which is another term for top down estimating....
Question 3335: You've been hired by a large consulting firm to lead an acco...
Question 3336: You are a project manager developing a project plan for the ...
Question 3337: All the following refer to power derived by the position of ...
Question 3338: Which of the following statements regarding Resource Breakdo...
Question 3339: You're managing a construction project to install several hu...
Question 3340: Understanding of _________________ characteristics of people...
Question 3341: In a Lump-sum contract, the profit is:...
Question 3342: What are triple constraints of a project?...
Question 3343: Your company has just received approval to purchase a compan...
Question 3344: Which of the following is an estimating technique that uses ...
Question 3345: You have accumulated project information throughout the proj...
Question 3346: _________ is the formal procedure for sanctioning project wo...
Question 3347: The CPM calculates the earliest start date, earliest finish ...
Question 3348: Flextime and compressed workweeks are two popular alternativ...
Question 3349: You are establishing a PMO for National Animal Celebrity Man...
Question 3350: In schedule development, you create a distribution of probab...
Question 3351: You have been recently assigned to provide an accurate proje...
Question 3352: You are the project manager for an upcoming outdoor concert ...
Question 3353: A resource pool description provides:...
Question 3354: You are a project manager for Bluebird Technologies. Bluebir...
Question 3355: Which of the following processes involves determining what r...
Question 3356: Which of the following formulas is used to calculate the SPI...
Question 3357: In which of the following contract type will the buyer assum...
Question 3358: The Pareto Principle is a technique used by quality managers...
Question 3359: The cost of corrective action taken by the purchaser and cha...
Question 3360: Reserve Analysis a technique not used in:...
Question 3361: A series of consecutive points on the same side of the avera...
Question 3362: The management theory that all people can direct their own e...
Question 3363: All of the following statements are true of the project Clos...
Question 3364: Outputs from the initiation process are:...
Question 3365: At XYZ Inc., the hourly wage for semi-skilled workers is $14...
Question 3366: Paul is a project manager for an industrial design project. ...
Question 3367: Inputs to Integrated Change Control include:...
Question 3368: A budget estimate should give the manager cost data accurate...
Question 3369: The process that is not a part of time management is:...
Question 3370: The major project scope management processes include:...
Question 3371: Which of the following represents the BEST process to accomp...
Question 3372: In order to anticipate your management's approval of the amo...
Question 3373: You are a project manager for Dutch Harbor Consulting. Your ...
Question 3374: The scope baseline once established and approved, is used:...
Question 3375: You are in the process of monitoring the various project pro...
Question 3376: Management by objectives assumes that the team...
Question 3377: You are in the process of estimating the type and quantity o...
Question 3378: How does a project management team stay in touch with the wo...
Question 3379: Total Project Risk:
Question 3380: The independence of two events in which the occurrence of on...
Question 3381: Which of the following are included in cost control? (Choose...
Question 3382: Product documentation is input to what process...
Question 3383: The majority of product defects could be prevented in most p...
Question 3384: You are the chief technology officer of a major stock exchan...
Question 3385: In preparing a good project definition, experienced project ...
Question 3386: Which of the following best describes residual risks?...
Question 3387: The customer has negotiated a cost plus incentive fee contra...
Question 3388: Which phase of the project life cycle typically has the high...
Question 3389: Resource Breakdown Structure is an example of:...
Question 3390: You are the project manager for the Late Night Smooth Jazz C...
Question 3391: You are a project manager for a telecommunications firm. You...
Question 3392: The Project Life Cycle:
Question 3393: The type of power most infrequently used by the PM is...
Question 3394: The Communications management plan is a document, which incl...
Question 3395: Which of the following conflict resolution techniques descri...
Question 3396: The ability to achieve cost savings is inversely proportiona...
Question 3397: There is two projects to choose the best one. Project X has ...
Question 3398: Which of the following is often overlooked in achieving effe...
Question 3399: A project is considered successful when...
Question 3400: This process applies evaluation criteria to the bids and pro...
Question 3401: Which of the following statements concerning compromise as a...
Question 3402: Which involves estimating the cost of individual work items:...
Question 3403: A person is writing a document identifying the business need...
Question 3404: You are the project manager. Which of the following would be...
Question 3405: The work that must be done in order to deliver a product wit...
Question 3406: Expectancy theory as applied to project management implies t...
Question 3407: Which of the following statements relating to Assumptions is...
Question 3408: You are in the process of identifying and documenting the pr...
Question 3409: When working in a matrix environment, all of the following a...
Question 3410: One of your project team members has made a technological br...
Question 3411: Which logical relationship does the PDM use most often?...
Question 3412: What is the difference between scope verification and qualit...
Question 3413: In your construction project, the CPI is 0.85 and SPI is 1.....
Question 3414: A new project management software tool has come onto the mar...
Question 3415: Outputs of procurement planning include...
Question 3416: Inputs to Staff Acquisition include all of the following exc...
Question 3417: The technique most commonly used to determine the profitabil...
Question 3418: Which of the following Project Scope Management processes in...
Question 3419: Group brainstorming encourages all of the following except:...
Question 3420: A contractor estimates that a project has a 0.5 probability ...
Question 3421: Project managers have the highest level of authority and the...
Question 3422: The document that authorizes the release of organizational r...
Question 3423: The belief that management's high levels of trust, confidenc...
Question 3424: What is wrong in this diagram? Exhibit: (Exhibit)...
Question 3425: Which of the following represents an example of developing a...
Question 3426: You are the project manager for a manufacturer of children's...
Question 3427: Which of the following are not the direct result of managing...
Question 3428: In your construction project, you decide to make a small cha...
Question 3429: Together with your team, you applied three-point estimation ...
Question 3430: You are in the process of identifying and documenting the lo...
Question 3431: Complete final contract performance reporting and verify pro...
Question 3432: Satisfaction of the functional requirements of a product is ...
Question 3433: Which of the following is CORRECT about quality improvements...
Question 3434: Frequent stimuli for a project include the following, except...
Question 3435: Which of the following approaches is likely to lead to the M...
Question 3436: The risk of accepting a lot of poor quality, in acceptance s...
Question 3437: Which of the following illustrate a chart with upper /lower ...
Question 3438: Which of the following describes a hierarchically organized ...
Question 3439: Which of the following statements are TRUE?...
Question 3440: Which of the following is a tool or technique used in integr...
Question 3441: The Project Manager's ability to influence others using powe...
Question 3442: Which of the following diagrams is most useful in impact ana...
Question 3443: You are working on a project that was proceeding well until ...
Question 3444: Staffing requirements do not define:...
Question 3445: All of the following are tools and techniques of the Perform...
Question 3446: You are a project manager responsible for constructing a new...
Question 3447: A tool that analyzes the inputs to a process to identify the...
Question 3448: You are the project manger at a leading manufacturer of cons...
Question 3449: Which of the following is not part of the acquisition proces...
Question 3450: During what part of Procurement Management process does proc...
Question 3451: Which technique has been applied to develop the following di...
Question 3452: As a project manager, you know that the most important activ...
Question 3453: Supporting details for activity cost estimates should includ...
Question 3454: Cost Plus Percentage of Cost contracts are more desirable fo...
Question 3455: All of the following statements are true regarding the procu...
Question 3456: Which of the following are true regarding project scope mana...
Question 3457: Which of the following is not true regarding project charter...
Question 3458: All of the following are part of cost baseline EXCEPT:...
Question 3459: What is the factor which will help a project manager gain th...
Question 3460: The project schedule is not used to determine:...
Question 3461: Which of the following is closet to Deming's definition of Q...
Question 3462: Which of the following statements are false regarding RACI c...
Question 3463: All the following are needed to create the WBS EXCEPT:...
Question 3464: Which of the following is not a tool or technique of project...
Question 3465: Risk event is the description of what may happen to the ____...
Question 3466: A tool and technique of quality control that keeps errors fr...
Question 3467: You created a Baseline of your System configuration and adde...
Question 3468: 80% of the problems are found in 20% of the work is a concep...
Question 3469: Which of the following is not part of contract administratio...
Question 3470: Information about the project must be distributed to all sta...
Question 3471: Management of a certain building was receiving complaints ab...
Question 3472: As a control tool, the bar chart (Gantt) methods is most ben...
Question 3473: Which tools or techniques are not used in Sequence Activitie...
Question 3474: The degree to which a company accepts and utilizes project m...
Question 3475: You in the project executing process group, and would like t...
Question 3476: Projects are typically authorized as a result of any of the ...
Question 3477: Which of the following is closest to Juran's definition of Q...
Question 3478: The Risk of NOT meeting project quality objectives:...
Question 3479: Job continuity would be an example of _____ in Maslow's hier...
Question 3480: Two sources of variation in the length of hex bolts exist. P...
Question 3481: Which of the following BEST describes the records management...
Question 3482: Preparing the Financial plan for your project will require:...
Question 3483: Which is a valid response to positive risks?...
Question 3484: Which of the following is the distinguishing characteristic ...
Question 3485: The person sending a message is NOT influenced by which of t...
Question 3486: The sequential steps that define the process for successfull...
Question 3487: You are the project manager at a utility company. Due to the...
Question 3488: Investment in project development prevention is most often b...
Question 3489: Techniques that can improve communication include:...
Question 3490: Parametric cost estimating involves:...
Question 3491: Of the following, which usually exhibits the slowest rate of...
Question 3492: The primary communication skills you will use in working wit...
Question 3493: Which of the following processes are performed in the Closin...
Question 3494: In which organizational form do project managers usually get...
Question 3495: In acceptance sampling, if the sample size is kept the same ...
Question 3496: Which of the following are included as part of a scope state...
Question 3497: In which of the following cost estimating techniques are sta...
Question 3498: Which process group is responsible for authorizes the projec...
Question 3499: Which is not one of the five classifications of work found i...
Question 3500: The risk monitoring and control process involves all of the ...
Question 3501: Which of the following concepts refers to a response to a ri...
Question 3502: You are in the process project a project schedule for repain...
Question 3503: Which of the following is true?...
Question 3504: A project manager has increased project costs by US $100,000...
Question 3505: Integrity in the project management field is accomplished th...
Question 3506: Which of the following are NOT tools/ techniques of the Acti...
Question 3507: All of the following should be included in the initial staff...
Question 3508: Monte Carlo analysis can help predict the impact of risks on...
Question 3509: Under which of the following circumstances would project man...
Question 3510: The project manager should be assigned during what phase...
Question 3511: Which of the following represents a consequence to the proje...
Question 3512: All of the following statements regarding the risk breakdown...
Question 3513: Reverse analysis is a tool/ technique in all of the followin...
Question 3514: The customer's expectations for quality are shown on a contr...
Question 3515: Consider the information below, in which activities A, B, an...