When during a major design project is the best time to provide your changes to the design team?
Correct Answer: B
The best time to make changes (Option B) is during the Schematic or Design Development phase, when the design is still flexible. Why Option B is Correct? * Changes during this phase are less costly and disruptive. * It ensures that input is incorporated before detailed construction drawings are finalized. * IFMA's Project Management Core Competency highlights that early-stage design input minimizes costly revisions during construction. Why Other Options Are Incorrect? * Option A (Construction Documents phase): Changes at this stage require major redesign work and increase costs. * Option C (Early Construction phase): Changing the design after construction starts leads to significant delays and budget overruns.