Valid CFM Dumps shared by ExamDiscuss.com for Helping Passing CFM Exam! ExamDiscuss.com now offer the newest CFM exam dumps, the ExamDiscuss.com CFM exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com CFM dumps with Test Engine here:
As-built drawings are final drawings that capture the actual field conditions after construction and reflect any changes made during the construction process. They differ from the original construction documents as they: * Include modifications that occurred during construction. * Document the exact locations of utilities, walls, mechanical systems, and other elements. * Serve as a reference for future maintenance, renovations, and facility management. * Why the other options are incorrect: * (A) Construction drawing bid set refers to pre-construction documents used for contractor bidding, not post-construction conditions. * (B) Architectural drawings after design development represent the design intent, not the final built conditions. * (D) Space program prior to design development is part of initial planning, unrelated to as-built documentation.