<< Prev Question Next Question >>

Question 292/471

What is the lowest level in the Work Breakdown Structure called?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (471q)
Question 1: Labor, materials, equipment, and supplies are examples of:...
Question 2: Change requests are an output from which Project Integration...
Question 3: Job satisfaction, challenging work, and sufficient financial...
Question 4: Sensitivity analysis is typically displayed as a/an:...
Question 5: Which Activity Duration Estimating technique incorporates ad...
Question 6: The number of potential communication channels for a project...
Question 7: When is a project finished?
Question 8: An input to the Create WBS process is a:...
Question 9: The Process Group in which the internal and external stakeho...
Question 10: In a construction project schedule, what is the logical rela...
Question 11: The lowest level normally depicted in a work breakdown struc...
Question 12: During project selection, which factor is most important?...
Question 13: What is the schedule performance index (SPI) using the follo...
Question 14: A given schedule activity is most likely to last four weeks....
Question 15: Which of the following methods is a project selection techni...
Question 16: The following is a network diagram for a project. (Exhibit) ...
Question 17: Which tool within the Perform Quality Control process identi...
Question 18: Which of the following includes how requirements activities ...
Question 19: Which of the following is an output of the Define Activities...
Question 20: Which tool or technique measures performance of the project ...
Question 21: An imposed date for completion of the project by the custome...
Question 22: Risk categorization is a tool or technique used in which pro...
Question 23: Quality metrics are an output of which process?...
Question 24: A tool and technique used in the Develop Project Charter pro...
Question 25: Expected monetary value (EMV) is computed by which equation?...
Question 26: An output of the Manage Stakeholder Engagement process is:...
Question 27: A project in which the scope, time, and cost of delivery are...
Question 28: Which group is formally chartered and responsible for review...
Question 29: In which type of contract are the performance targets establ...
Question 30: Which document in the project management plan can be updated...
Question 31: The cost benefit analysis tool is used for creating:...
Question 32: Projects can intersect with an organization's operations at ...
Question 33: Which is a tool used in monitoring and controlling project w...
Question 34: Technical capability, past performance, and intellectual pro...
Question 35: The process of developing a detailed description of the proj...
Question 36: The most commonly used type of precedence relationship in th...
Question 37: An input required in Define Scope is an organizational:...
Question 38: An intentional activity to modify a nonconforming product or...
Question 39: Definitions of probability and impact, revised stakeholder t...
Question 40: The risk management team of a software project has decided t...
Question 41: An input to the Plan Procurement Management process is:...
Question 42: In a weak matrix, the project managers role is:...
Question 43: What is an objective of the Develop Project Team process?...
Question 44: Which term describes an assessment of correctness?...
Question 45: A method of obtaining early feedback on requirements by prov...
Question 46: A process is defined as:
Question 47: Identify Risks is part of which Process Group?...
Question 48: Which document defines how a project is executed, monitored ...
Question 49: Which of the following tools or techniques is used for Estim...
Question 50: Which process involves subdividing project deliverables and ...
Question 51: When should quality planning be performed?...
Question 52: Units of measure, level of precision, level of accuracy, con...
Question 53: A project manager seeking insight on previous stakeholder ma...
Question 54: The Verify Scope process is primarily concerned with:...
Question 55: What is the minimum a project schedule must include?...
Question 56: Which technique should a project manager use in a situation ...
Question 57: Assigned risk ratings are based upon:...
Question 58: Which of the following outputs from the Control Schedule pro...
Question 59: In complex projects/ initiating processes should be complete...
Question 60: What does a CPI value greater than 1.0 indicate?...
Question 61: Which of the following is a tool or technique of the Define ...
Question 62: Which schedule development technique modifies the project sc...
Question 63: An input to the Manage Project Team process is:...
Question 64: Control charts, flowcharting, histograms, Pareto charts, and...
Question 65: Which Project Management Process Group includes Collect Requ...
Question 66: Which type of graphic is displayed below? (Exhibit)...
Question 67: Sending letters, memos, reports, emails, and faxes to share ...
Question 68: In which process might a project manager use risk reassessme...
Question 69: The project management processes are usually presented as di...
Question 70: When a backward pass is calculated from a schedule constrain...
Question 71: The creation of an internet site to engage stakeholders on a...
Question 72: Which project document is updated in the Control Stakeholder...
Question 73: Which type of dependency is legally or contractually require...
Question 74: The primary benefit of the Plan Schedule Management process ...
Question 75: To which process is work performance information an input?...
Question 76: At which stage of team development do members begin to work ...
Question 77: Which changes occur in risk and uncertainty as well as the c...
Question 78: Processes in the Planning Process Group are typically carrie...
Question 79: The cost baseline and project funding requirements are outpu...
Question 80: The Plan Stakeholder Management process belongs to which Pro...
Question 81: An input of the Create WBS process is:...
Question 82: Which of the following is a tool and technique for Estimate ...
Question 83: A project charter is an output of which Process Group?...
Question 84: Which grid shows which resources are tied to work packages?...
Question 85: The traditional organization chart structure that can be use...
Question 86: A project manager requesting industry groups and consultants...
Question 87: Which action should a project manager take to ensure that th...
Question 88: The process of formalizing acceptance of the completed proje...
Question 89: Which of the following events would result in a baseline upd...
Question 90: Which of the following is an output of Direct and Manage Pro...
Question 91: The risk response strategy in which the project team acts to...
Question 92: In which Process Group are lessons learned documented?...
Question 93: The basis of identification for current or potential problem...
Question 94: The following is a network diagram for a project. (Exhibit) ...
Question 95: The cost performance baseline is typically displayed in the ...
Question 96: Which of the following tools and techniques is used in the D...
Question 97: The component of the human resource management plan that inc...
Question 98: Which of the following terms indicates a deliverable-oriente...
Question 99: The Project Human Resource Management process that involves ...
Question 100: A project's purpose or justification, measurable project obj...
Question 101: Which input to the Identify Stakeholders process provides in...
Question 102: The diagram below is an example of a: (Exhibit)...
Question 103: Which index is the calculated projection of cost performance...
Question 104: When calculating the cost of quality (COQ) for a product or ...
Question 105: Which standard has interrelationships to other project manag...
Question 106: A project management office manages a number of aspects incl...
Question 107: The application of knowledge, skills, tools, and techniques ...
Question 108: The project governance approach should be described in the:...
Question 109: An input to the Perform Integrated Change Control process is...
Question 110: Which item is a formal proposal to modify any document, deli...
Question 111: An input of the Plan Procurement Management process is:...
Question 112: Which type of team can be defined as a group of people with ...
Question 113: Which tool or technique used in the Control Procurements pro...
Question 114: Where are product requirements and characteristics documente...
Question 115: As the project progresses, which of the following is routine...
Question 116: Which tool or technique is used in the Estimate Costs proces...
Question 117: Which type of project management office (PMO) supplies templ...
Question 118: Whose approval may be required for change requests after cha...
Question 119: What is the term assigned to products or services having the...
Question 120: Which of the following tools and techniques is used in the V...
Question 121: The process of identifying the stakeholders' information nee...
Question 122: Which tool or technique can a project manager use to select ...
Question 123: Which of the following risk response strategies involves all...
Question 124: The process of defining how the project scope will be valida...
Question 125: Specification of both the deliverables and the processes is ...
Question 126: Which of the following is a schematic display of the project...
Question 127: An input to the Collect Requirements process is the:...
Question 128: An effective technique for resolving conflict that incorpora...
Question 129: Which is the document that presents a hierarchical project o...
Question 130: Which tool or technique is used in Close Procurements?...
Question 131: The following is a network diagram for a project. (Exhibit) ...
Question 132: Which enterprise environmental factors are considered during...
Question 133: Which of the following involves making information available...
Question 134: Enterprise environmental factors are an input to which proce...
Question 135: An output of the Manage Project Team process is:...
Question 136: The three types of estimates that PERT uses to define an app...
Question 137: When painting a bedroom, preparing the walls can be done whi...
Question 138: Which type of analysis is used as a general management techn...
Question 139: The project has a current cost performance index of 0.80. As...
Question 140: In the Plan Procurement Management process, which source sel...
Question 141: Which tool and technique identifies inefficient and ineffect...
Question 142: The Identify Stakeholders process is found in which Process ...
Question 143: The Project Management Process Group in which performance is...
Question 144: When is a Salience Model used?
Question 145: Which organizational process assets update is performed duri...
Question 146: Soft logic is also known as what type of dependency?...
Question 147: The organization's perceived balance between risk taking and...
Question 148: A special type of bar chart used in sensitivity analysis for...
Question 149: Which basic quality tool is most useful when gathering attri...
Question 150: Perform Quality Control is accomplished by:...
Question 151: Which of the following characteristics are found in a functi...
Question 152: An input to the Perform Quantitative Risk Analysis process i...
Question 153: Activity cost estimates and the project schedule are inputs ...
Question 154: The project manager needs to review the templates in use. Th...
Question 155: Which of the following reduces the probability of potential ...
Question 156: The individual or group that provides resources and support ...
Question 157: Which of following could be organizational process assets?...
Question 158: The purpose of the Project Communications Management Knowled...
Question 159: An associate who calculates fees daily to support the depart...
Question 160: Which of the following documents allows the project manager ...
Question 161: Which of the following statements is true regarding project ...
Question 162: Which item is an example of personnel assessment?...
Question 163: Which Process Group's purpose is to track, review, and regul...
Question 164: The degree of uncertainty an entity is willing to take on in...
Question 165: While processes in the Planning Process Group seek to collec...
Question 166: Scope verification is PRIMARILY concerned with which of the ...
Question 167: Which quality control technique illustrates the 80/20 princi...
Question 168: The purpose of developing a project scope management plan is...
Question 169: Organizational planning impacts projects by means of project...
Question 170: The methodology that combines scope, schedule, and resource ...
Question 171: Which process uses occurrence probability and impact on proj...
Question 172: Which tools or techniques will a project manager use for Dev...
Question 173: Which key interpersonal skill of a project manager is define...
Question 174: The Perform Quality Assurance process occurs in which Proces...
Question 175: Which is one of the determining factors used to calculate CP...
Question 176: Which type of dependency is contractually required or inhere...
Question 177: When a project is undertaken to reduce defects in a product ...
Question 178: In the Define Activities process, the schedule management pl...
Question 179: PMBOI Guide is a standard that describes:...
Question 180: Which type of probability distribution is used to represent ...
Question 181: Which of the following strategic considerations often result...
Question 182: Which of the following correctly explains the term "progress...
Question 183: Which of the following is a tool and technique used in all p...
Question 184: An electronics firm authorizes a new project to develop a fa...
Question 185: Which earned value management (EVM) metric is a measure of t...
Question 186: Which of the following is a means of reaching a group decisi...
Question 187: Within a matrix organization, dual reporting of team members...
Question 188: Which of the following is an input to Direct and Manage Proj...
Question 189: What are the key components of the communication model?...
Question 190: Under which type of contract does the seller receive reimbur...
Question 191: In which Project Management Process Group is the project cha...
Question 192: The only Process Group that comprises processes that typical...
Question 193: The following chart contains information about the tasks in ...
Question 194: The processes required to establish the scope of the project...
Question 195: Which of the following buffers protects the target finish da...
Question 196: In Project Cost Management, which input is exclusive to the ...
Question 197: Schedule milestones and a predefined budget are examples of:...
Question 198: The Perform Integrated Change Control process occurs in whic...
Question 199: An example of a group decision-ma king technique is:...
Question 200: Tools and techniques used in Direct and Manage Project Work ...
Question 201: Which piece of information is part of the WBS Dictionary?...
Question 202: Which of the following processes audits the quality requirem...
Question 203: The process of monitoring the status of the project to updat...
Question 204: Organizational process assets, a lessons-learned database, a...
Question 205: The component of the risk management plan that documents how...
Question 206: Which Manage Communications tool or technique focuses on ide...
Question 207: Which process involves the creation of a document that provi...
Question 208: A project team attempts to produce a deliverable and finds t...
Question 209: Managing procurement relationships and monitoring contract p...
Question 210: Which input will be used when tasked with developing the hum...
Question 211: A work package has been scheduled to cost $1,000 to complete...
Question 212: Which of the following correctly describes when organization...
Question 213: An input to the Plan Cost Management process is:...
Question 214: Which of the following schedule network analysis techniques ...
Question 215: When would resource leveling be applied to a schedule model?...
Question 216: Which of the following is the process of identifying the spe...
Question 217: A risk response strategy in which the project team shifts th...
Question 218: Using the three-point estimating technique, if the most like...
Question 219: Budgets reserved for unplanned changes to project scope and ...
Question 220: Project deliverables that have been completed and checked fo...
Question 221: Which Perform Quality Assurance tool or technique is used to...
Question 222: Which schedule network analysis technique modifies the proje...
Question 223: Which is one of the major outputs of Sequence Activities?...
Question 224: Which of the Perform Quality Assurance tools and techniques ...
Question 225: A project manager should communicate to stakeholders about r...
Question 226: The completion of the project scope is measured against the:...
Question 227: High-level project risks are included in which document?...
Question 228: A tool and technique used during the Define Scope process is...
Question 229: Which of the following is an output of Define Scope?...
Question 230: Which Define Activities tool or technique is used for dividi...
Question 231: What is the name of a graphic display of project team member...
Question 232: A method to manage stakeholder expectations in the scope sta...
Question 233: What is the name of the statistical method that helps identi...
Question 234: The business needs, assumptions, and constraints and the und...
Question 235: Project Management Process Groups are linked by:...
Question 236: Who determines which dependencies are mandatory during the S...
Question 237: Which standard examines an enterprise's project management p...
Question 238: Which process develops options and actions to enhance opport...
Question 239: Outputs from constituent processes might be used as:...
Question 240: Which input to the Manage Stakeholder Engagement process is ...
Question 241: Cost baseline is an output of which of the following process...
Question 242: Which of the following is a tool or technique used in the Ac...
Question 243: Define Activities and Estimate Activity Resources are proces...
Question 244: Projects that share common outcomes, collective capability, ...
Question 245: Stakeholders can be identified in later stages of the projec...
Question 246: Which activity involves ensuring that the composition of a p...
Question 247: Which input to the Plan Risk Management process provides inf...
Question 248: Documented identification of a flaw in a project component t...
Question 249: In which phase of team building activities do team members b...
Question 250: Which of the following is a tool and technique used in the D...
Question 251: The contract in which the seller is reimbursed for all allow...
Question 252: Outputs of the Control Communications process include:...
Question 253: Which tools or techniques are used during the Close Project ...
Question 254: Which of the following is an output of Close Procurements?...
Question 255: The staffing management plan is part of the:...
Question 256: Which type of diagram includes groups of information and sho...
Question 257: A complete set of concepts, terms, and activities that make ...
Question 258: Which of the following techniques is used during Control Sco...
Question 259: Which technique helps to determine the risks that have the m...
Question 260: Updates to organizational process assets such as procurement...
Question 261: During which process does the project team receive bids and ...
Question 262: Which Process Group contains those processes performed to de...
Question 263: Who is responsible for developing the project management pla...
Question 264: Which tool and technique is used in Conduct Procurements?...
Question 265: When a control chart is used to monitor performance of a pro...
Question 266: The project scope statement and resource calendars are input...
Question 267: A risk may be graded into different priorities by which proc...
Question 268: Which process involves aggregating the estimated costs of th...
Question 269: Analytical techniques are a tool and technique of which proc...
Question 270: The scope management plan and scope baseline are contained i...
Question 271: Which Control Quality tool is also known as an arrow diagram...
Question 272: What cost control technique is used to compare actual projec...
Question 273: A measure of cost performance that is required to be achieve...
Question 274: What are the components of the "triple constraint "?...
Question 275: The following chart contains information about the tasks in ...
Question 276: Stakeholder satisfaction should be managed as a key project:...
Question 277: Which of the following is a tool and technique used to monit...
Question 278: The process of estimating the type and quantity of material,...
Question 279: Which of the following is contained within the communication...
Question 280: What entity is assigned various responsibilities related to ...
Question 281: Verification of project deliverables occurs during which pro...
Question 282: An input to Develop Project Charter is a/an:...
Question 283: Which tool or technique is used in the Perform Integrated Ch...
Question 284: Prototype development may be used as a tool for which of the...
Question 285: Design of experiments (DOE) should be used during which of t...
Question 286: Which of the following is a conflict resolution technique th...
Question 287: One of the fundamental tenets of modern quality management s...
Question 288: Which of the following are the components of the scope basel...
Question 289: Which process documents the business needs of a project and ...
Question 290: Tools and techniques used for Plan Communications include th...
Question 291: Quality and credibility of the qualitative risk analysis pro...
Question 292: What is the lowest level in the Work Breakdown Structure cal...
Question 293: A collection of projects managed as a group to achieve strat...
Question 294: Scope, schedule, and cost parameters are integrated in the:...
Question 295: Which component of the human resource management plan descri...
Question 296: Which can be used to determine whether a process is stable o...
Question 297: Which tool or technique is an examination of industry and sp...
Question 298: The purpose of inspection in Perform Quality Control is to k...
Question 299: Which of the following is an estimating technique that uses ...
Question 300: Conditions that are not under the control of the project tea...
Question 301: Resource calendars are included in the:...
Question 302: A key benefit of the Manage Communications process is that i...
Question 303: What name(s) is (are) associated with the Plan-Do-Check-Act ...
Question 304: Administer Procurements is part of which Process Group?...
Question 305: A risk that arises as a direct result of implementing a risk...
Question 306: For a stakeholder with low interest and high power, the proj...
Question 307: Identifying major deliverables, deciding if adequate cost es...
Question 308: As part of a mid-project evaluation, the project sponsor has...
Question 309: Which process should be conducted from the project inception...
Question 310: Overlooking negative stakeholders can result in a/an:...
Question 311: Which type of analysis would be used for the Plan Quality pr...
Question 312: What is the function of a Project Management Office (PMO)?...
Question 313: Which tool or technique is used to develop a project charter...
Question 314: The PV is $1000, EV is $2000, and AC is $1500. What is CPI?...
Question 315: The most appropriate project life cycle model for an environ...
Question 316: Which is an output of the Collect Requirements process?...
Question 317: Which risk response strategy is common for both positive and...
Question 318: A project requires a component with well-understood specific...
Question 319: A tool and technique used during the Collect Requirements pr...
Question 320: Which output is the approved version of the time-phased proj...
Question 321: How is the schedule variance calculated using the earned val...
Question 322: Which Process Group contains the processes performed to comp...
Question 323: Funding limit reconciliation is a tool and technique used in...
Question 324: The precedence diagramming method (PDM) is also known as:...
Question 325: Completion of the product scope is measured against the prod...
Question 326: Success is measured by benefits realization for a:...
Question 327: Which type of manager is assigned by the performing organiza...
Question 328: Which of the following is an output of the Perform Integrate...
Question 329: Projects are separated into phases or subprojects; these pha...
Question 330: Which input to the Manage Stakeholder Engagement process pro...
Question 331: Who, along with the project manager, is supposed to direct t...
Question 332: Which of the following is an input to Direct and Manage Proj...
Question 333: When the business objectives of an organization change, proj...
Question 334: Which Develop Schedule tool and technique produces a theoret...
Question 335: In a typical project, project managers spend most of their t...
Question 336: Which of the following is a strategy to deal with positive r...
Question 337: What is a tool to improve team performance?...
Question 338: Changes to formally controlled documentation, plans, etc. to...
Question 339: Which Define Activities output extends the description of th...
Question 340: Which type of dependency is established based on knowledge o...
Question 341: A technique used to determine the cause and degree of differ...
Question 342: The technique of subdividing project deliverables into small...
Question 343: Plan-do-check-act is also known as:...
Question 344: Which is an enterprise environmental factor?...
Question 345: Which of the Project Time Management processes analyzes acti...
Question 346: On what is project baseline development established?...
Question 347: Which process determines the risks that might affect the pro...
Question 348: Which tool or technique is effective in a project in which t...
Question 349: Those who enter into a contractual agreement to provide serv...
Question 350: Which change request is an intentional activity that realign...
Question 351: While preparing the project management plan on a weekly basi...
Question 352: Which input may influence quality assurance work and should ...
Question 353: Who provides the inputs for the original estimates of activi...
Question 354: What type of project structure is a hierarchically organized...
Question 355: Which statement correctly describes the value of a business ...
Question 356: Which of the following methods of performance review examine...
Question 357: Which type of contract gives both the seller and the buyer f...
Question 358: The Monitoring and Controlling Process Group includes proces...
Question 359: An input to Close Project or Phase is:...
Question 360: A project manager managing a cross-cultural virtual project ...
Question 361: Within project integration management, the statement of work...
Question 362: A stakeholder expresses a need not known to the project mana...
Question 363: An input to the Identify Stakeholders process is:...
Question 364: The Human Resource Management processes are:...
Question 365: Who selects the appropriate processes for a project?...
Question 366: Which type of chart is a graphic representation of a process...
Question 367: The procurement process that documents agreements and relate...
Question 368: Which Process Group typically consumes the bulk of a project...
Question 369: One of the objectives of a quality audit is to:...
Question 370: Organizational process assets can be divided into which of t...
Question 371: Power, urgency, and legitimacy are attributes of which stake...
Question 372: Which is an example of Administer Procurements?...
Question 373: Grouping the stakeholders based on their level of authority ...
Question 374: Which Knowledge Area is concerned with the processes require...
Question 375: Which quality management and control tool is useful in visua...
Question 376: Who is responsible for initiating a project?...
Question 377: What are the formal and informal policies, procedures, and g...
Question 378: Taking out insurance in relation to risk management is calle...
Question 379: Which written document helps monitor who is responsible for ...
Question 380: What is one of the objectives of Project Risk Management?...
Question 381: Which of the following processes are part of the Project Int...
Question 382: Which element does a project charter contain?...
Question 383: Which of the following tools will be used to produce perform...
Question 384: Which of the following is developed from the project scope b...
Question 385: Which of the following processes are within the Initiating P...
Question 386: Project managers who lead by example and follow through on t...
Question 387: Who is responsible for reviewing change requests and approvi...
Question 388: Monte Carlo is which type of risk analysis technique?...
Question 389: What scope definition technique is used to generate differen...
Question 390: The chart below is an example of a: (Exhibit)...
Question 391: Which tool or technique allows a large number of ideas to be...
Question 392: A project manager is appointed full-time to a project and is...
Question 393: Requirements documentation will typically contain at least:...
Question 394: Which baselines make up the performance measurement baseline...
Question 395: Another name for an Ishikawa diagram is:...
Question 396: In which domain of project management would a Pareto chart p...
Question 397: Which tool is used to develop technical details within the p...
Question 398: An output of the Validate Scope process is:...
Question 399: The following is a network diagram for a project. (Exhibit) ...
Question 400: Which of the following is an example of a risk symptom?...
Question 401: Fast tracking is a schedule compression technique used to sh...
Question 402: Which type of agreement is legal, contractual, and between t...
Question 403: Which tools or techniques are used in the Plan Schedule Mana...
Question 404: An output of Control Schedule is:...
Question 405: Configuration identification, configuration status accountin...
Question 406: The ways in which the roles and responsibilities, reporting ...
Question 407: An input used in developing the communications management pl...
Question 408: Which type of estimating can produce higher levels of accura...
Question 409: Which process is responsible for monitoring the status of th...
Question 410: Which tool or technique of the Define Activities process all...
Question 411: A project manager at a publishing company decides to initiat...
Question 412: The process of identifying and documenting project roles, re...
Question 413: Which process includes prioritizing risks for subsequent fur...
Question 414: Project or phase closure guidelines or requirements, histori...
Question 415: Outputs of the Control Communications process include:...
Question 416: What are the five Project Management Process Groups?...
Question 417: Which type of contract is a hybrid of both a cost-reimbursab...
Question 418: When alternative dispute resolution (ADR) is necessary, whic...
Question 419: Which Process Group and Knowledge Area include the Sequence ...
Question 420: Which Perform Quality Control tool graphically represents ho...
Question 421: An output of the Create WBS process is:...
Question 422: Which type of risk diagram is useful for showing time orderi...
Question 423: Which document describes the procurement item in sufficient ...
Question 424: Managing ongoing production of goods and services to ensure ...
Question 425: Lessons learned are created and project resources are releas...
Question 426: Types of internal failure costs include:...
Question 427: Which item is a cost of conformance?...
Question 428: Information collected on the status of project activities be...
Question 429: Which provides the basic framework for managing a project?...
Question 430: When an activity cannot be estimated with a reasonable degre...
Question 431: Which is an input to the Scope Verification Process?...
Question 432: Which of the following is TRUE about most project life cycle...
Question 433: Which process is included in the Project Integration Managem...
Question 434: The following is a network diagram for a project. (Exhibit) ...
Question 435: Impacts to other organizational areas, levels of service, an...
Question 436: Which characteristics do effective project managers possess?...
Question 437: Which of the following is the correct network diagram for th...
Question 438: Projects can be divided into phases to provide better manage...
Question 439: Risk responses reflect an organization's perceived balance b...
Question 440: Which stakeholder classification model groups stakeholders b...
Question 441: What is the total float of the critical path?...
Question 442: Which of the following is an input to the Direct and Manage ...
Question 443: Who is responsible for determining which processes from the ...
Question 444: Through whom do project managers accomplish work?...
Question 445: Activity resource requirements and the resource breakdown st...
Question 446: Which tool or technique of Plan Quality involves comparing a...
Question 447: Which of the following correctly lists the configuration man...
Question 448: Work performance information and cost forecasts are outputs ...
Question 449: Change request status updates are an output of which process...
Question 450: Which Control Scope input is compared to actual results to d...
Question 451: Which characteristic is unique to project work and does not ...
Question 452: Which type of elaboration allows a project management team t...
Question 453: The formal and informal interaction with others in an organi...
Question 454: Which of the following is an output of the Plan Quality proc...
Question 455: Which Collect Requirements output links the product requirem...
Question 456: Using values such as scope, cost, budget, and duration or me...
Question 457: Which process group contains the processes performed to fina...
Question 458: Which of the following is an input to Control Scope?...
Question 459: One of the tools and techniques of the Manage Project Team p...
Question 460: A weighting system is a tool for which area of Conduct Procu...
Question 461: Correlated and contextualized information on how closely the...
Question 462: The output that defines an approach to increase the support ...
Question 463: Which of the following can be used as an input for Define Sc...
Question 464: The product scope description is used to:...
Question 465: Market conditions and published commercial information are e...
Question 466: The following is a network diagram for a project. (Exhibit) ...
Question 467: Which process involves developing an approximation of the mo...
Question 468: In which type of organizational structure are staff members ...
Question 469: The process to ensure that appropriate quality standards and...
Question 470: Which of the following strategies is used to deal with risks...
Question 471: Which of the following change requests can bring expected fu...