Assuming activities 2001 through 2004 comprise the same WBS element, construct a WBS summary activity for activities 2001 through 2004. Use the normal schedule, what is the cost of the activity?
Correct Answer: B
A WBS summary activity aggregates costs of constituent activities (2001 through 2004). By summing the costs of activities as outlined in the schedule, the total cost for the WBS summary activity is calculated as $321,000. References: PSP Study Guide, Section 1.3.7 - Establish Work Breakdown Structure, elaborates on cost consolidation at WBS levels.