Question 122/1030

Activities on the critical path have which type of float?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (1030q)
Question 1: Your company CEO just sent you an e-mail asking you to make ...
Question 2: Verification of project deliverables occurs during which pro...
Question 3: A given schedule activity is most likely to last four weeks....
Question 4: Benchmarking is a technique used in______________...
Question 5: Which type of analysis is used to determine the cause and de...
Question 6: A revised cost baseline may be required in cost control when...
Question 7: Which of the following can be used as an input for Define Sc...
Question 8: The team of Project Managers works in their company with a v...
Question 9: When you established the change control board for your avion...
Question 10: Which process occurs within the Monitoring and Controlling P...
Question 11: Your project has been under way for some time, but indicator...
Question 12: You are managing a moderately risky project. You have done w...
Question 13: Which type of dependency is established based on knowledge o...
Question 14: The Project Manager is creating an estimate for a housing de...
Question 15: Which of the following is a complete set of indexed contract...
Question 16: Your approved cost baseline has changed because of a major s...
Question 17: The IT initiative project is on schedule and under budget. T...
Question 18: Plan-do-check-act is also known as:...
Question 19: Which characteristic do projects and operational work share ...
Question 20: You are project manager for a systems integration effort and...
Question 21: Which of the following consists of the detailed project scop...
Question 22: Which action is included in the Control Costs process?...
Question 23: All the following elements are organizational process asset ...
Question 24: You are managing a complex project for a new method of heati...
Question 25: Which of the following is a tool and technique used to monit...
Question 26: Which technique is used in Perform Quantitative Risk Analysi...
Question 27: When is a project finished?
Question 28: Which of the following buffers protects the target finish da...
Question 29: Stakeholder engagement must be controlled on a continuous ba...
Question 30: Activity A is worth $300, is 100% complete, and actually cos...
Question 31: Which of the following roles controls resources and manages ...
Question 32: The correct equation for schedule variance (SV) is earned va...
Question 33: Determining the method and the timing of releasing team memb...
Question 34: The process of formalizing acceptance of the completed proje...
Question 35: Contested changes are requested changes when the buyer and s...
Question 36: Which technique should a project manager use in a situation ...
Question 37: While implementing an approved change, a critical defect was...
Question 38: Which of the following is an example of the simplest fixed-p...
Question 39: Which baselines make up the performance measurement baseline...
Question 40: You are the Project Manager of an engineering project for a ...
Question 41: Work performance information in control risks means that____...
Question 42: What type of planning is used where the work to be accomplis...
Question 43: Two people at work are discussing roles and responsibilities...
Question 44: Which schedule method allows the project team to place buffe...
Question 45: Hierarchical-type charts are a tool and technique for use in...
Question 46: You completed your stakeholder analysis. How do you want to ...
Question 47: Assume you are actively working, along with your team, to ma...
Question 48: Which of the following qualifications is the most important ...
Question 49: You need to outsource the testing function of your project. ...
Question 50: As it applies to quality, the law of diminishing returns say...
Question 51: Which defines the portion of work included in a contract for...
Question 52: The issue log is useful in control communications because it...
Question 53: Exhibit A is an example of which of the following types of S...
Question 54: Ensuring that projects and programs are reviewed to prioriti...
Question 55: Most statistical simulations of budgets, schedules, and reso...
Question 56: You are the project manager for a two-year project that is n...
Question 57: Activity resource requirements and the resource breakdown st...
Question 58: The process of monitoring the status of the project and prod...
Question 59: Two team members on your current construction project are en...
Question 60: Recognizing the importance of preparing a stakeholder manage...
Question 61: You have been placed in charge of a group of people that is ...
Question 62: Funding limit reconciliation is a tool and technique used in...
Question 63: The cost of nonconformance in a project includes:...
Question 64: What cost control technique is used to compare actual projec...
Question 65: A Project Manager has completed the Scope Definition process...
Question 66: Which of the following statements is true regarding project ...
Question 67: What are assigned risk ratings based upon?...
Question 68: Which of the following is an example of fixed formula status...
Question 69: Using the three-point estimating technique, if the most like...
Question 70: What is the lowest level in the Work Breakdown Structure cal...
Question 71: Quality function deployment is one approach for collecting r...
Question 72: The process of conferring with others to come to terms or re...
Question 73: What happens to a stakeholder's project influence over time?...
Question 74: Your management has prescribed that a quality audit be condu...
Question 75: Each WBS component should be assigned a unique identifier fr...
Question 76: Your project is now under way, and you are working with your...
Question 77: The Project Manager is reviewing testing output. Generally, ...
Question 78: When determining the message that you will deliver to stakeh...
Question 79: Overlooking negative stakeholders can result in a/an:...
Question 80: The project planning for the trade show is progressing on sc...
Question 81: When alternative dispute resolution (ADR) is necessary, whic...
Question 82: Which of the following is an output of the Plan Quality proc...
Question 83: The review of a sellers progress toward achieving the goals ...
Question 84: Product analysis techniques include all the following EXCEPT...
Question 85: Thinking back to lessons that your company learned from expe...
Question 86: The key output of identify stakeholders that documents ident...
Question 87: Recent data indicate that more than 10,000 airline passenger...
Question 88: The team is testing the work of the project and is having is...
Question 89: Crosswind Custom Homes is building a customer's dream house....
Question 90: The project scope statement addresses and documents all the ...
Question 91: Which index is the calculated projection of cost performance...
Question 92: To assist your software development team in collecting requi...
Question 93: When are deliverables accepted or not accepted?...
Question 94: Which of the following are documented directions to perform ...
Question 95: Which type of estimating can produce higher levels of accura...
Question 96: When choosing the most appropriate form of project organizat...
Question 97: The project planning is progressing on budget. The Project M...
Question 98: The project budget is set at $150,000. The project duration ...
Question 99: A project has an EV of 100 workdays, an AC of 120 workdays, ...
Question 100: The principal function of a warranty is to______________...
Question 101: Organizational planning impacts projects by means of project...
Question 102: Which of the seven basic quality tools is especially useful ...
Question 103: On your project, you need to assign costs to the time period...
Question 104: Which of the following is used to control schedule related i...
Question 105: The e-commerce project is six weeks behind schedule with fiv...
Question 106: The process of aggregating the estimated costs of individual...
Question 107: Because your project is slated to last five years, you belie...
Question 108: As head of the PMO, you will receive performance reports for...
Question 109: Which type of contract gives both the seller and the buyer f...
Question 110: You plan to hold a series of meeting as you execute the proj...
Question 111: Overall cost estimates must be allocated to individual activ...
Question 112: An input to the Identify Stakeholders process is:...
Question 113: Which of the following is an example of schedule compression...
Question 114: Which schedule development tool and technique produces a the...
Question 115: In addition to providing support to the project, quality ass...
Question 116: A collection of projects managed as a group to achieve strat...
Question 117: You recently took over a relatively new project expected to ...
Question 118: What provides information regarding the ways people, teams, ...
Question 119: Change request status updates are an output of which process...
Question 120: Which of the following is considered an advantage of a funct...
Question 121: Tools and techniques used to perform quality assurance inclu...
Question 122: Activities on the critical path have which type of float?...
Question 123: Information distribution involves making needed information ...
Question 124: What's budget?
Question 125: Which type of analysis is used to examine project results th...
Question 126: In the Estimate Activity Durations process, productivity met...
Question 127: Which of the following statements best describes attribute s...
Question 128: Effective communication occurs in groups as well as between ...
Question 129: Table reporting, spreadsheet analysis, and presentations are...
Question 130: Inputs to the Define Activities process include:...
Question 131: Assume you have been working with your sponsor to prepare yo...
Question 132: As a project manager, you recognize the importance of active...
Question 133: You are managing a major international project that involves...
Question 134: The Project Manager is creating an estimate for building a c...
Question 135: Which items are an output of the Perform Integrated Change C...
Question 136: The project management processes presented in the PMBOK Guid...
Question 137: Administer Procurements is part of which Process Group?...
Question 138: Which of the following will likely result in the greatest cu...
Question 139: One way to evaluate the project schedule performance is to__...
Question 140: The best approach to resolve the settlement of all outstandi...
Question 141: The last step in the stakeholder analysis process is to_____...
Question 142: The project is using a new server that cost $25,000 US. The ...
Question 143: Life-cycle phase definitions are different in different indu...
Question 144: Six sigma refers to the aim of setting tolerance limits at s...
Question 145: In which domain of project management would a Pareto chart p...
Question 146: You have a conflict on your team but have enough time to res...
Question 147: Which of the following tools and techniques are utilized in ...
Question 148: During your project, you will have a number of different typ...
Question 149: An approach to provide insight into the health of the projec...
Question 150: In person-to-person communication, messages are sent on verb...
Question 151: When would resource leveling be applied to a schedule model?...
Question 152: Which of the following is a schematic display of the project...
Question 153: Crosswind Custom Homes is building a customer's dream house....
Question 154: Another name for an Ishikawa diagram is:...
Question 155: Forecasts, requested changes, recommended corrective actions...
Question 156: Which type of management focuses on ensuring that projects a...
Question 157: Quality inspections also may be called______________...
Question 158: Which of the following is a set of interrelated actions and ...
Question 159: An output of the Manage Project Team process is:...
Question 160: Control charts, flowcharting, histograms, Pareto charts, and...
Question 161: Assume you wish to provide a process to be more creative in ...
Question 162: A key tool and technique used in define scope is____________...
Question 163: Which characteristic is unique to project work and does not ...
Question 164: In both the weak and strong matrix organizational structures...
Question 165: The company is implementing a new project management approac...
Question 166: As the project progresses, which of the following is routine...
Question 167: Sensitivity analysis is typically displayed as a/an:...
Question 168: Stakeholders often have issues, and you have asked each of y...
Question 169: Which of the following processes is necessary to ensure that...
Question 170: The data warehouse project is about halfway complete at a ma...
Question 171: An output of the Direct and Manage Project Work process is:...
Question 172: Impacts to other organizational areas, levels of service, an...
Question 173: Your organization is characterized by hierarchical organizat...
Question 174: In which process might you use risk reassessment as a tool a...
Question 175: In some cases, contract termination refers to______________...
Question 176: Major difficulties arise when multiple projects need to be m...
Question 177: An output of the Close Project (or Close Phase) process is:...
Question 178: Which of the following Project Communication Management proc...
Question 179: Risk mitigation involves______________...
Question 180: Which is one of the major outputs of Sequence Activities?...
Question 181: Project managers spend a great deal of time communicating wi...
Question 182: It is important on all projects to determine when and how hu...
Question 183: External organizations that have a special relationship with...
Question 184: Which input to the Manage Stakeholder Engagement process is ...
Question 185: In what knowledge area does Activity Resource Estimating occ...
Question 186: Assume you have performed your stakeholder analysis and now ...
Question 187: As project manager, you are primarily responsible for implem...
Question 188: When you are about to terminate a contract, the one place to...
Question 189: Which activity involves ensuring that the composition of a p...
Question 190: Risk score measures the______________...
Question 191: What is the typical role of senior management on a project?...
Question 192: You are a personnel management specialist recently assigned ...
Question 193: Project management processes describe project work, while pr...
Question 194: Which of the following types of a dependency determination i...
Question 195: An element of the modern quality management approach used to...
Question 196: The project has a current cost performance index of 0.80. As...
Question 197: Whose approval may be required for change requests after cha...
Question 198: Which schedule compression technique has phases or activitie...
Question 199: Which schedule network analysis technique modifies the proje...
Question 200: The project manager at an organization has just realized tha...
Question 201: You want to ensure that the information you collect showing ...
Question 202: A risk response strategy that can be used for both threats a...
Question 203: Which tools or techniques will a project manager use for Dev...
Question 204: A project management office manages a number of aspects incl...
Question 205: Which Perform Quality Control tool graphically represents ho...
Question 206: An automated tool, project records, performance indicators, ...
Question 207: Testing falls into which of the following categories of cost...
Question 208: The project team directory is an output from which of the fo...
Question 209: Which type of team can be defined as a group of people with ...
Question 210: At the end of the project, what will be the value of SV?...
Question 211: You are a contractor for a state agency. Your company recent...
Question 212: The Administer Procurements process is in which of the follo...
Question 213: Based on a recent quality audit of your project, your organi...
Question 214: Conflict should be best addressed in which manner?...
Question 215: Decomposition, rolling wave planning, and templates are all ...
Question 216: In the below path convergence example, if the odds of comple...
Question 217: Which of the following will provide the basis for estimating...
Question 218: When the business objectives of an organization change, proj...
Question 219: Information received from stakeholders concerning project op...
Question 220: A project team member agrees to change a project deliverable...
Question 221: A tool or technique used in the Control Procurements process...
Question 222: Which of the following is an input to Direct and Manage Proj...
Question 223: Change control procedures, configuration management knowledg...
Question 224: Which of the following is not an example of team development...
Question 225: Which Define Activities output extends the description of th...
Question 226: Correlated and contextualized information on how closely the...
Question 227: You work as a project manager in the largest hospital in the...
Question 228: Which quality tool incorporates the upper and lower specific...
Question 229: Which input may influence quality assurance work and should ...
Question 230: Budgets reserved for unplanned changes to project scope and ...
Question 231: In performing human resources functions on a project, which ...
Question 232: Analytical techniques are a tool and technique of which proc...
Question 233: The process of identifying and documenting relationships amo...
Question 234: In Project Cost Management, which input is exclusive to the ...
Question 235: Which illustrates the connection between work that needs to ...
Question 236: The purpose of a numeric scale in risk management is to_____...
Question 237: Which of the following is a tool for analyzing a design, det...
Question 238: Completion of the product scope is measured against the prod...
Question 239: In which process might a project manager use risk reassessme...
Question 240: Which of the following processes audits the quality requirem...
Question 241: The project team members have gotten together at the end of ...
Question 242: You have assembled a core team to develop the project manage...
Question 243: One way to make it more likely practice project risk managem...
Question 244: One of the reasons why it is challenging to work on a virtua...
Question 245: You are managing a project that has five subcontractors. You...
Question 246: One purpose of the communications management plan is to prov...
Question 247: You are managing a virtual team. The project has been under ...
Question 248: Which of the following outputs from the Control Schedule pro...
Question 249: Which of the following is the best description of configurat...
Question 250: As a project manager, you try to use empathic listening skil...
Question 251: The project team is involved in creating the work breakdown ...
Question 252: The company has been plagued by disorganized projects that a...
Question 253: While working as the project manager on a new project to imp...
Question 254: One way to determine how to best update and communicate proj...
Question 255: You are managing a project with team members located at cust...
Question 256: Assume on your project you have identified 250 stakeholders ...
Question 257: The Perform Integrated Change Control process occurs in whic...
Question 258: Ideally, a project manager should be selected and assigned a...
Question 259: A number of factors affect make-or-buy decisions such as____...
Question 260: A number of tools and techniques are helpful in the perform ...
Question 261: Which of the following is developed from the project scope b...
Question 262: Collecting requirements is critical in project scope managem...
Question 263: Your project team has identified all the risks on the projec...
Question 264: Calculate the variance for the following: Pessimistic=50, Op...
Question 265: Which tools or techniques are used during the Close Project ...
Question 266: All the following elements must be evident in a written cont...
Question 267: Which of the following is a statistical concept that calcula...
Question 268: Validate scope______________
Question 269: Which technique helps to determine the risks that have the m...
Question 270: A Pareto chart is a specific type of:...
Question 271: The sponsor is a key project stakeholder because he or she__...
Question 272: The below Pareto chart indicates defects in areas associated...
Question 273: The purpose of economic value added (EVA) is to_____________...
Question 274: The process for performing variance analysis may vary, depen...
Question 275: Which type of dependency used in the Sequence Activities pro...
Question 276: Ensuring that both parties meet contractual obligations and ...
Question 277: A measure of cost performance that is required to be achieve...
Question 278: If the probability of event 1 is 80 percent and of event 2 i...
Question 279: Which type of control tool identifies whether or not a proce...
Question 280: The total of the planned value (PV) is also known as:...
Question 281: A project manager should document the escalation path for un...
Question 282: The most appropriate project life cycle model for an environ...
Question 283: An input to the Plan Procurement Management process is:...
Question 284: The undistributed budget is part of the______________...
Question 285: Change requests, project management plan updates, project do...
Question 286: Which process involves user cost estimates and the schedule ...
Question 287: You are the Project Manager on a cellular bluetooth amplifie...
Question 288: Which process should be conducted from the project inception...
Question 289: A contract typically is used when a project is being perform...
Question 290: Outputs from constituent processes might be used as:...
Question 291: As you use the critical chain method in lieu of the critical...
Question 292: The project charter has just been signed off. There were ite...
Question 293: In which of the following types of organizations is resource...
Question 294: The ability of stakeholders to influence a project is_______...
Question 295: Retreating from an actual or potential conflict or postponin...
Question 296: As project manager, you need a relatively fast and informal ...
Question 297: Expert judgment is a best practice as a tool and technique i...
Question 298: Which term describes contract costs that are traceable to or...
Question 299: A number of organizational process assets are useful as inpu...
Question 300: Which of the following is an output of a change control syst...
Question 301: Closing a project phase should not be delayed until project ...
Question 302: What is the schedule performance index (SPI) if the planned ...
Question 303: The Process Group in which the internal and external stakeho...
Question 304: Which of following could be organizational process assets?...
Question 305: You realize that projects represent change, and on your proj...
Question 306: The "rule of seven" as applied to statistical process contro...
Question 307: Which risk response strategy is common for both positive and...
Question 308: You are part of a team that is working to develop a new medi...
Question 309: To which process is work performance information an input?...
Question 310: Which of the following methods of performance review examine...
Question 311: The pilot for PM Airlines is in the process of flying from D...
Question 312: Which of the following tools is used in process analysis to ...
Question 313: Assume that your company is working under a fixed-price-ince...
Question 314: On your project, scope changes, constraints, assumptions, in...
Question 315: Change requests include a group of potential changes to a pr...
Question 316: Your project manager has requested that you provide him with...
Question 317: Project management processes are:...
Question 318: What is a technique used in the performance reporting proces...
Question 319: Which of the following is an output of the Conduct Procureme...
Question 320: Which tool or technique is used to manage change requests an...
Question 321: On the WBS, the first level of decomposition may be displaye...
Question 322: You have decided to organize a study group of other project ...
Question 323: Managing five contractors on your project for a new stadium ...
Question 324: The following chart contains information about the tasks in ...
Question 325: Marketplace conditions are an input to which one of the foll...
Question 326: Which enterprise environmental factors are considered during...
Question 327: Expected monetary value (EMV) is computed by which equation?...
Question 328: Which of the following is an input to the Direct and Manage ...
Question 329: The Project Manager is working with the sponsor to attain fo...
Question 330: The greatest degree of uncertainty is encountered during whi...
Question 331: The project planning is progressing on schedule. The Project...
Question 332: You are in the process of performing quality assurance on yo...
Question 333: What is the tool and technique used to request seller respon...
Question 334: The quality management plan describes all the following EXCE...
Question 335: For complex procurement items, often contract negotiation ca...
Question 336: Stakeholder engagement involves a number of critical activit...
Question 337: Which of the following is an example of recommended correcti...
Question 338: Cost baseline is an output of which of the following process...
Question 339: Your project scheduler has just started working with your pr...
Question 340: Which of the following is an input to the Plan Risk Response...
Question 341: Two team members on your project often disagree. You need a ...
Question 342: Approved change requests, approved corrective actions, and u...
Question 343: While processes in the Planning Process Group seek to collec...
Question 344: An input of the Control Schedule process is the:...
Question 345: On a large medical billing system project, the team is large...
Question 346: As you prepare to close your project, which of the following...
Question 347: You have been assigned as the project manager for a major pr...
Question 348: Project or phase closure guidelines or requirements, histori...
Question 349: Which process group contains the processes performed to fina...
Question 350: Your firm specializes in roller-coaster construction. It rec...
Question 351: You finally have been appointed project manager for a major ...
Question 352: Which of the following is a tool and technique used in all p...
Question 353: Your project has an EV of 100 work-days, an AC of 120 work-d...
Question 354: A supporting input for controlling stakeholder engagement is...
Question 355: Lessons learned are created and project resources are releas...
Question 356: Which of the following is a schedule network analysis techni...
Question 357: Procurement audits, negotiated settlements, and a records ma...
Question 358: An output of the Plan Quality Management process is:...
Question 359: Working to foster stakeholder engagement, as the project man...
Question 360: You are leading a team to review and improve the project sel...
Question 361: Which of the following processes are within the Initiating P...
Question 362: The traditional organization chart structure that can be use...
Question 363: To identify inefficient and ineffective policies, processes,...
Question 364: You realize that on projects, some stakeholders will not be ...
Question 365: The plan quality management process includes all the followi...
Question 366: Which of the following is not a regulation?...
Question 367: As you are working on your telecommunications project, even ...
Question 368: Modifications may be needed to the WBS and WBS dictionary be...
Question 369: Which of the following factors contributes the most to team ...
Question 370: The team members on your project have been complaining that ...
Question 371: As project manager, you identified a number of acceptable to...
Question 372: All of the following are examples of good control procuremen...
Question 373: Communication is important when setting and managing expecta...
Question 374: Which organizational process assets update is performed duri...
Question 375: Assume your construction project is for a small city with on...
Question 376: When does Monitor and Control Risks occur?...
Question 377: You are leading a project team to identify potential new pro...
Question 378: Which of the following is a tool or technique of the Define ...
Question 379: Work performance information is an output of which process?...
Question 380: Those who enter into a contractual agreement to provide serv...
Question 381: Which earned value management (EVM) metric is a measure of t...
Question 382: Assume your stakeholder management plan has been approved. Y...
Question 383: Your company decided to award a contract for project managem...
Question 384: Which process involves identifying and documenting the logic...
Question 385: The most commonly used type of precedence relationship in th...
Question 386: The group technique that enhances brainstorming with a votin...
Question 387: What is one of the MAJOR outputs of activity sequencing?...
Question 388: An input to the Perform Integrated Change Control process is...
Question 389: In which Process Group are lessons learned documented?...
Question 390: What is a tool to improve team performance?...
Question 391: Before considering a project closed, what document should be...
Question 392: A general contingency is used for______________...
Question 393: A change log for communications can be used to communicate t...
Question 394: All projects involve some extent of change, because they inv...
Question 395: Which technique is commonly used for the Quantitative Risk A...
Question 396: In which phase of team building activities do team members b...
Question 397: Which tool or technique allows a large number of ideas to be...
Question 398: Which tool or technique is used in the Perform Integrated Ch...
Question 399: An output of the Validate Scope process is:...
Question 400: The ISO 9000 standards provide______________...
Question 401: Having worked previously as a software project manager, you ...
Question 402: The project is progressing well but has begun to experience ...
Question 403: The process improvement plan details the steps for analyzing...
Question 404: The chart below is an example of a: (Exhibit)...
Question 405: An imposed date for completion of the project by the custome...
Question 406: Your project is proceeding according to schedule. You have j...
Question 407: Quality and credibility of the qualitative risk analysis pro...
Question 408: Projects are particularly susceptible to risk because_______...
Question 409: On a wireless internet access project, the team is large wit...
Question 410: The software development project is going through planning. ...
Question 411: Which tool or technique is used in Close Procurements?...
Question 412: What do composite organizations involve?...
Question 413: Today, the primary cause of why projects are not completed o...
Question 414: A key member of your project has deep technical skills and m...
Question 415: Which tool or technique measures performance of the project ...
Question 416: After Define Activities and Sequence Activities, the next pr...
Question 417: What is the estimate at completion (EAC) if the budget at co...
Question 418: Your project is using complex, unproven technology. Your tea...
Question 419: An example of a group decision-making technique is:...
Question 420: The company is implementing a quality improvement standard o...
Question 421: On your project to construct a new runway for your City's ai...
Question 422: Which of the following would a team create as a result of us...
Question 423: A tool and technique used during the Perform Qualitative Ris...
Question 424: Which of the following correctly lists the configuration man...
Question 425: Which of the following involves making information available...
Question 426: What is the term assigned to products or services having the...
Question 427: When a permitting agency takes longer than planned to issue ...
Question 428: Which type of project management office (PMO) supplies templ...
Question 429: What is the name of a graphic display of project team member...
Question 430: You are a project manager for residential construction. As a...
Question 431: Job satisfaction, challenging work, and sufficient financial...
Question 432: The precedence diagramming method (PDM) is also known as:...
Question 433: Assume that you are a major subcontractor doing work for a p...
Question 434: You are responsible for a project in your organization that ...
Question 435: A project requires a component with well-understood specific...
Question 436: Significant differences between the seller's price and your ...
Question 437: When cost variance is negative and schedule variance is posi...
Question 438: In defining a milestone, which of the following is correct?...
Question 439: An output of the Develop Project Team process is:...
Question 440: (Exhibit) Which of the following is the correct network diag...
Question 441: What quality control tool graphically represents how various...
Question 442: You have decided to use a fishbone diagram to identify the r...
Question 443: Work completed, key performance indicators, technical perfor...
Question 444: A project has a current cost performance index (CPI) of 1.25...
Question 445: In organizing a project, a project manager must deal with co...
Question 446: You are identifying possible risks to your project concernin...
Question 447: All of the following are typically part of the project manag...
Question 448: A reward can only be effective if it is:...
Question 449: Which group is formally chartered and responsible for review...
Question 450: A logical relationship in which a successor activity cannot ...
Question 451: Which is a tool used in monitoring and controlling project w...
Question 452: Which term is NOT a common name for a procurement document t...
Question 453: Which of the following is a tool or technique for the Plan P...
Question 454: Work performance information is an output of control stakeho...
Question 455: A Project Manager has completed the Scope Definition process...
Question 456: Activity A is worth $200, is 100% complete, and actually cos...
Question 457: It is expensive to lease office space in cities around the w...
Question 458: Updates to organizational process assets such as procurement...
Question 459: In a typical project, project managers spend most of their t...
Question 460: As you prepare your human resource plan, you need to determi...
Question 461: You recognize the importance of quality control on your proj...
Question 462: When closing a project, it is a best practice to____________...
Question 463: Which Control Quality tool is also known as an arrow diagram...
Question 464: The team is involved in defining what is needed to ensure th...
Question 465: You are managing a project with team members located at cust...
Question 466: It is critical during the proposal preparation stage that___...
Question 467: Although your company's project life cycle does not mandate ...
Question 468: A project manager needs to deliver the project 2 weeks befor...
Question 469: Which of the following choices is a contract closure tool or...
Question 470: Typically, the statement "no one likes to estimate, because ...
Question 471: One of the fundamental tenets of modern quality management s...
Question 472: When a process is within acceptable limits, it______________...
Question 473: Your customer signed off on the requirements document and sc...
Question 474: The quality function deployment process is used to__________...
Question 475: The project manager needs to review the templates in use. Th...
Question 476: The links between the processes in the Process Groups are of...
Question 477: Which Process Group typically consumes the bulk of a project...
Question 478: The close project or phase process addresses actions and act...
Question 479: The CPI is .92, and the EV is US$172,500.What is the actual ...
Question 480: Project Scope Management is characterized by processes in th...
Question 481: Rather than use a WBS, your team developed a bill of materia...
Question 482: Calculate the standard deviation for the following: Pessimis...
Question 483: Assume your company is a leader in the market in production ...
Question 484: Which of the following techniques is used during Control Sco...
Question 485: The cost benefit analysis tool is used for creating:...
Question 486: Progressive elaboration of product characteristics on your p...
Question 487: Which of the following is an estimating technique that uses ...
Question 488: Which process is responsible for monitoring the status of th...
Question 489: Historical information is used______________...
Question 490: Which knowledge area employs the processes required to ensur...
Question 491: You are managing a project in an organization is characteriz...
Question 492: Assume you want to optimize the work performance reports you...
Question 493: The approaches, tools, and data sources that will be used to...
Question 494: During which process would stakeholders provide formal accep...
Question 495: When painting a bedroom, preparing the walls can be done whi...
Question 496: Which output is the approved version of the time-phased proj...
Question 497: Recently your company introduced a new set of "metal woods" ...
Question 498: Working on your project to design and construct five new bri...
Question 499: You are developing a project charter and want to ensure that...
Question 500: Issue change requests and adapt approved changes into the pr...
Question 501: Specification of both the deliverables and the processes is ...
Question 502: Having worked as a project manager for nine years, you know ...
Question 503: Work performance information and cost forecasts are outputs ...
Question 504: You are the Project Manager for a high speed data communicat...
Question 505: What is used to define the accounts that the WBS and organiz...
Question 506: All of the following are true about a work breakdown structu...
Question 507: Which tool or technique is used in validating the scope of a...
Question 508: Which of the following formulas calculates the number of com...
Question 509: One of the tools and techniques of the Manage Project Team p...
Question 510: The baseline for evaluating whether requests for changes or ...
Question 511: Recognizing operations management is different than project ...
Question 512: Which output of Project Cost Management consists of quantita...
Question 513: Which Process Group's purpose is to track, review, and regul...
Question 514: An example of an organizational process asset that could aff...
Question 515: Which of the following are the components of the scope basel...
Question 516: You are responsible for a project in your organization that ...
Question 517: The cumulative CPI has been shown to be relatively stable af...
Question 518: The purpose of work performance data in control communicatio...
Question 519: The end point of a project phase can be referred to as:...
Question 520: During which process does a project manager review all prior...
Question 521: You are the Project Manager on a merger and acquisition proj...
Question 522: Types of internal failure costs include:...
Question 523: Quality assurance promotes quality improvement. A "breakthro...
Question 524: The three processes of Project Cost Management are:...
Question 525: Who determines which dependencies are mandatory during the S...
Question 526: What is the number of stakeholders, if the project has 28 po...
Question 527: The purpose of the Taguchi method is to______________...
Question 528: During which process does the project team receive bids and ...
Question 529: Configuration identification, configuration status accountin...
Question 530: An associate who calculates fees daily to support the depart...
Question 531: Performance review meetings are held to assess schedule acti...
Question 532: You are implementing a project management methodology for yo...
Question 533: A tool or technique used during the Administer Procurements ...
Question 534: Outputs of the Control Communications process include:...
Question 535: As you work on your project to update its software training ...
Question 536: You are developing radio frequency (RF) technology that will...
Question 537: Team performance assessments is an output of which of the fo...
Question 538: Perform Integrated Change Control is the process of:...
Question 539: Which of the following are inputs to the Plan Procurements p...
Question 540: You and your project team recognize the importance of projec...
Question 541: Which enterprise environmental factors may influence Plan Sc...
Question 542: The project management plan contains all of the following ex...
Question 543: In quality management, the practice "rework" is_____________...
Question 544: The development team is building a new product for their com...
Question 545: The performance measurement baseline consists of all the fol...
Question 546: Which of the following are examples of interactive communica...
Question 547: A technique used to determine the cause and degree of differ...
Question 548: The project team is developing rules for reporting status on...
Question 549: Which of the following is not a regulation?...
Question 550: A car company authorized a project to build more fuel-effici...
Question 551: When does risk monitoring and control occur?...
Question 552: The technique of subdividing project deliverables into small...
Question 553: The chances for successful completion of a multidisciplinary...
Question 554: Which Develop Schedule tool and technique produces a theoret...
Question 555: Change is inevitable on projects. Uncontrolled changes are o...
Question 556: The Project Manager is working with the customer to gain for...
Question 557: Which key interpersonal skill of a project manager is define...
Question 558: In project communications, the first step in a written commu...
Question 559: Which item is an input to the Define Activities process?...
Question 560: A buyer has negotiated a fixed-price-incentive-fee contract ...
Question 561: Information collected on the status of project activities be...
Question 562: If a business venture has a 60-percent chance to earn $2 mil...
Question 563: You have decided to award a contract to a seller that has pr...
Question 564: Which one of the following represents a constraint on the ac...
Question 565: The electrical engineer has recently been promoted from lead...
Question 566: A purchase order for a specified item to be delivered by a s...
Question 567: Rank ordering of defects should be used to guide corrective ...
Question 568: Which tool within the Perform Quality Control process identi...
Question 569: As a project manager, you believe in using a "personal touch...
Question 570: An input to the Perform Quantitative Risk Analysis process i...
Question 571: You are working on a long-term project that has a number of ...
Question 572: To please the customer, a project team member delivers a req...
Question 573: The printing company is putting a policy in place to use jus...
Question 574: A purchase order is a good example of which form of contract...
Question 575: Given that you are neighbors, you and the CEO of your compan...
Question 576: Each one of the following statements about risk avoidance is...
Question 577: The key benefit of the control communications process is to_...
Question 578: You have heard recently that the client calls your progress ...
Question 579: All the following are project baselines that are generally p...
Question 580: What is the name of the statistical method that helps identi...
Question 581: Cost aggregation is typically performed by aggregating work ...
Question 582: Which process in Project Time Management includes reserve an...
Question 583: A workaround is______________
Question 584: The salience model is one way to classify stakeholders. In i...
Question 585: You are the project manager in charge of developing a new sh...
Question 586: A key benefit of the Manage Communications process is that i...
Question 587: If you want to calculate the ETC based on your expectations ...
Question 588: An output of the Perform Integrated Change Control process i...
Question 589: A project manager requesting industry groups and consultants...
Question 590: Managing procurement relationships and monitoring contract p...
Question 591: Which of the following is a component of three-point estimat...
Question 592: If you apply the configuration management system along with ...
Question 593: A project manager should communicate to stakeholders about r...
Question 594: What is the schedule performance index (SPI) using the follo...
Question 595: Which tool or technique of the Define Activities process all...
Question 596: Configuration management describes procedures for applying t...
Question 597: Which process involves aggregating the estimated costs of th...
Question 598: The customer has requested a five-week delay on the project ...
Question 599: Assume you are managing a project to implement an electronic...
Question 600: The three types of estimates that PERT uses to define an app...
Question 601: Which of the Perform Quality Assurance tools and techniques ...
Question 602: Which category of contracts are sellers legally obligated to...
Question 603: A recent earned value analysis shows that your project is 20...
Question 604: Success is measured by benefits realization for a:...
Question 605: The Monitoring and Controlling Process Group includes proces...
Question 606: The project management team has performed earned value analy...
Question 607: Calculate the variance for the following: Pessimistic=20, Op...
Question 608: When sequencing activities, what does the common acronym FF ...
Question 609: How is the schedule variance calculated using the earned val...
Question 610: Analyzing stakeholders is a part of the identify stakeholder...
Question 611: The project is nearing completion. The team is involved in a...
Question 612: What is the main output of Monitoring and Controlling?...
Question 613: The key benefit of the Monitoring and Controlling Process Gr...
Question 614: Which change request is an intentional activity that realign...
Question 615: A Project Manager was assigned to manage a project to develo...
Question 616: Analyzing the strengths, weaknesses, opportunities, and thre...
Question 617: You have been directed to establish a change control system ...
Question 618: When a seller breaches a contract, the buyer cannot receive_...
Question 619: The Process Group that involves coordinating people and reso...
Question 620: What is an objective of the Developing Project Team Process?...
Question 621: Results of quality control measurements are used____________...
Question 622: The workaround that you used to deal with a risk that occurr...
Question 623: An effective technique for resolving conflict that incorpora...
Question 624: Which of the following types of contracts has the least risk...
Question 625: Which Activity Duration Estimating technique incorporates ad...
Question 626: Sample attributes of a communications management plan includ...
Question 627: The company is in the testing phase of its project. It is tr...
Question 628: You are putting together the final schedule on your security...
Question 629: You are working on a project with 15 stakeholders. The numbe...
Question 630: Assume you are managing the development of a construction pr...
Question 631: The contract in which the seller is reimbursed for all allow...
Question 632: Facilitation techniques are used throughout project manageme...
Question 633: An output of the Create WBS process is:...
Question 634: The Delphi technique is a particularly useful method for ide...
Question 635: Which type of dependency is legally or contractually require...
Question 636: A number of items in the stakeholder management plan are sim...
Question 637: Which estimating technique uses the actual costs of previous...
Question 638: Which standard examines an enterprise's project management p...
Question 639: As an output from control communications, it may be necessar...
Question 640: Any step recommended to bring expected future performance in...
Question 641: When managing current projects, it is important to use lesso...
Question 642: A project health check identified a risk that your project w...
Question 643: Requirements for formal deliverable acceptance are defined i...
Question 644: You are managing a major international project, and your con...
Question 645: In a weak matrix, the project managers role is:...
Question 646: Which written document helps monitor who is responsible for ...
Question 647: What scope definition technique is used to generate differen...
Question 648: Different types of project phases are used on projects, and ...
Question 649: Because risk management is relatively new on projects in you...
Question 650: The reason that the cost performance index (CPI) is shown as...
Question 651: Which of the following events would result in a baseline upd...
Question 652: The run chart created during the Perform Quality Control pro...
Question 653: Which tool and technique identifies inefficient and ineffect...
Question 654: All of the following statements concerning validate scope an...
Question 655: An output of Control Schedule is:...
Question 656: The cost baseline and project funding requirements are outpu...
Question 657: When calculating the cost of quality (COQ) for a product or ...
Question 658: Which of the following is a tool or technique used in the De...
Question 659: Who is responsible for developing the project management pla...
Question 660: Which type of elaboration allows a project management team t...
Question 661: What are the key components of the communication model?...
Question 662: Quality objectives of the project are recorded in___________...
Question 663: You are beginning a new project staffed with a virtual team ...
Question 664: Based on the following metrics: EV=$20,000, AC=$22,000, and ...
Question 665: Processes in the Initiating Process Group may be completed a...
Question 666: Which of the following calculations CANNOT be used to determ...
Question 667: Which illustrates the connection between work that needs to ...
Question 668: What are seven consecutive data points on either side of the...
Question 669: All of the following are objectives of a quality audit______...
Question 670: In plan stakeholder management, all organizational assets ar...
Question 671: Activity A is worth $300, is 100% complete, and actually cos...
Question 672: Assume that your project in the food service industry involv...
Question 673: An intentional activity to modify a nonconforming product or...
Question 674: Projects can intersect with an organization's operations at ...
Question 675: Which process requires implementation of approved changes?...
Question 676: A new manufacturing facility is being built for a consumer e...
Question 677: Plan Schedule Management is a process in which Knowledge Are...
Question 678: Which tool or technique used in the Control Procurements pro...
Question 679: Improvement to the processes and the product is a goal of pr...
Question 680: You are project manager on a systems engineering project des...
Question 681: Your organization has decided to use project management for ...
Question 682: Which of the following are inputs into the Administer Procur...
Question 683: Which of the following tools will be used to produce perform...
Question 684: Contract negotiations are NOT required when______________...
Question 685: Assume you have identified your stakeholders and are prepari...
Question 686: A structured review of the seller's progress to deliver proj...
Question 687: Which Process Group contains the processes performed to comp...
Question 688: A project manager who communicates to the project team thoug...
Question 689: You plan to award a contract to provide project management t...
Question 690: What is the best reason to create a work breakdown structure...
Question 691: Calculate the standard deviation for the following: Pessimis...
Question 692: The team you have organized for your new project consists of...
Question 693: Statements of organizational policies and philosophies, posi...
Question 694: Oftentimes when a project is terminated, senior managers wil...
Question 695: The following chart contains information about the tasks in ...
Question 696: The Project Manager is working with the customer to gain for...
Question 697: You are managing a project in which your team members all wo...
Question 698: During the closing phase of the project, the top-ranked sour...
Question 699: As project manager, you have assembled the team to prepare a...
Question 700: Requirements for formal contract acceptance and closure usua...
Question 701: You receive a frantic phone call from your vice president wh...
Question 702: The Project Manager is involved in Project Scope Management....
Question 703: You are in the initial phase of a project and are doing an e...
Question 704: Long-term contracting is an important aspect of project qual...
Question 705: The PV is $1000, EV is $2000, and AC is $1500. What is CPI?...
Question 706: Because communications planning often is linked tightly with...
Question 707: Which of the following is a conflict resolution technique th...
Question 708: What is the primary benefit of meeting quality requirements?...
Question 709: As an output of plan communications, it may be necessary to ...
Question 710: Which type of manager is assigned by the performing organiza...
Question 711: You have been a project manager for seven years. You now are...
Question 712: Organizational process assets can be divided into which of t...
Question 713: Updates of organizational process assets that are an output ...
Question 714: At the completion of a project, a report is prepared that de...
Question 715: Resource calendars are included in the:...
Question 716: The estimate costs process uses all the following tools and ...
Question 717: You are working on identifying possible risks to your projec...
Question 718: Based on the following metrics: EV= $20,000, AC= $22,000, an...
Question 719: General management skills relevant to the manage communicati...
Question 720: Having prepared stakeholder management plans on previous pro...
Question 721: Your DVD training project is almost complete. You have outso...
Question 722: Having worked previously on projects as a team member, you a...
Question 723: A disadvantage associated with virtual teams is that they:...
Question 724: A project manager at a publishing company decides to initiat...
Question 725: You want to structure your project so that each project team...
Question 726: Which process occurs within the Monitoring and Controlling P...
Question 727: Reserve analysis is a tool and technique used in which proce...
Question 728: The process of monitoring the status of the project to updat...
Question 729: You work for a software development company that has followe...
Question 730: Alternatives generation often is useful in defining project ...
Question 731: The definition of operations is a/an:...
Question 732: You want to minimize the impact of changes on your project, ...
Question 733: Which of the following procurement processes results in the ...
Question 734: Research has shown that during the execution phase of the pr...
Question 735: You are a goal-oriented project manager who is more interest...
Question 736: The primary result of effective team development is_________...
Question 737: Project A has a NPV of $275K US over 2.5 years. Project B ha...
Question 738: The primary advantage of using decision-tree analysis in pro...
Question 739: Which of the following is not a human resources process?...
Question 740: The person assigned by the performing organization to be res...
Question 741: Scope, schedule, and cost parameters are integrated in the:...
Question 742: Often in working as a project manager, it is easy to overloo...
Question 743: As you work with your team to prepare your stakeholder manag...
Question 744: A procurement management plan is a subsidiary of which other...
Question 745: An input of the Plan Procurement Management process is:...
Question 746: Which type of contract is most commonly used by buying organ...
Question 747: A tool or technique in Perform Quality Control that a projec...
Question 748: A marketing campaign is being built to support a new product...
Question 749: Which of the following are outputs of the Monitor and Contro...
Question 750: The control chart is a tool used primarily to help__________...
Question 751: Which document describes the procurement item in sufficient ...
Question 752: Which is a communication method used in the Report Performan...
Question 753: Using parametric estimating, if an assigned resource is capa...
Question 754: Deming's Fourteen Points provide a way for an organization t...
Question 755: Which of the following is an input to Direct and Manage Proj...
Question 756: Assume that your actual costs are $800; your planned value i...
Question 757: The CPI is .92, and the EV is US$172,500. What is the actual...
Question 758: A Project Manager has completed the Scope Planning process. ...
Question 759: You are working on a project that needs approval from your C...
Question 760: Which of the following characteristics are found in a functi...
Question 761: The project scope statement should be used in the identify r...
Question 762: Which of the following is an output of Close Procurements?...
Question 763: As you prepare to close out contracts on your project, you s...
Question 764: Assume you are beginning your project to develop a series of...
Question 765: Assume that your company has a cost-plus-fixed-fee contract....
Question 766: The project is in a projectized environment. There are signi...
Question 767: The procurement process that documents agreements and relate...
Question 768: The CPI on your project is 0.84. This means that you should_...
Question 769: Which cost estimate technique includes contingencies to acco...
Question 770: There has been a great delay in waiting to get the charter a...
Question 771: Assume that the project cost estimates have been prepared fo...
Question 772: A project manager has created an issue log to document issue...
Question 773: Constant bickering, absenteeism, and substandard performance...
Question 774: During contract negotiations on large contracts, the negotia...
Question 775: All of the following could be considered functions of the GE...
Question 776: Projects are authorized by which of the following individual...
Question 777: Which of the following tools and techniques is used to estim...
Question 778: Crosswind Custom Homes is building a customer's dream house....
Question 779: The Plan Procurements process includes documenting project p...
Question 780: Under which type of contract does the seller receive reimbur...
Question 781: The sponsor on the airport runway project has just told the ...
Question 782: Which tool or technique is used in the Estimate Costs proces...
Question 783: The Human Resource Management processes are:...
Question 784: The project planning is progressing. The team has involved t...
Question 785: The customer has requested a five-week delay on the project ...
Question 786: The team is in the process of validating that the quality pl...
Question 787: In scope control it is important to determine the cause of a...
Question 788: Your organization is adopting a project-based approach to bu...
Question 789: The area where the project manager can have the greatest imp...
Question 790: The ways in which the roles and responsibilities, reporting ...
Question 791: According to Herzberg's Motivator-Hygiene Theory, when achie...
Question 792: The direct and manage project work process truly is importan...
Question 793: The project is going through Quality control. Which of the f...
Question 794: The process to ensure that appropriate quality standards and...
Question 795: According to learning curve theory, when many items are prod...
Question 796: To which process is work performance information an input?...
Question 797: The completion of the project scope is measured against the:...
Question 798: You are the finance controller with your company. Your job i...
Question 799: Which schedule development technique modifies the project sc...
Question 800: Which of the Project Time Management processes analyzes acti...
Question 801: What is a deliverable-oriented, hierarchical decomposition o...
Question 802: Even though your project is vastly different from a manufact...
Question 803: The project manager has requested all expert team members to...
Question 804: The integrative nature of project management requires which ...
Question 805: You are responsible for ensuring that your seller's performa...
Question 806: Projects are supposed to succeed, not fail. However, termina...
Question 807: Which of the following is a measure of the value of work com...
Question 808: A Project Manager has completed the scope statement of the p...
Question 809: Change requests are an output from which Project Integration...
Question 810: The purpose of the Project Communications Management Knowled...
Question 811: Which of the following ensures that requested changes to del...
Question 812: When a backward pass is calculated from a schedule constrain...
Question 813: Which is the correct formula for calculating expected activi...
Question 814: Which item is a cost of conformance?...
Question 815: An input to Close Project or Phase is:...
Question 816: Analogous cost estimating relies on which of the following t...
Question 817: How is quality control performed?...
Question 818: A cost management plan should establish and document the var...
Question 819: Consider a company that sells products to consumers: as one ...
Question 820: You are the Project Manager on the development of a 4-way fu...
Question 821: What are the formal and informal policies, procedures, and g...
Question 822: The cost performance baseline is typically displayed in the ...
Question 823: You are examining multiple scope change requests on a projec...
Question 824: For a stakeholder with low interest and high power, the proj...
Question 825: On your systems development project, you noted during a revi...
Question 826: There are a number of different earned value management rule...
Question 827: Which of the following is an input into the Develop Project ...
Question 828: A number of different decision-making styles can be used in ...
Question 829: Cost variance (CV) is equal to earned value:...
Question 830: The simplest form of quantitative risk analysis and modeling...
Question 831: At which stage of team development do members begin to work ...
Question 832: Conditions that are not under the control of the project tea...
Question 833: You are the project manager for a subcontractor on a major c...
Question 834: In complex projects/ initiating processes should be complete...
Question 835: The cumulative cost curve for planned and actual expenditure...
Question 836: You are working on a contract in a remote location. The cont...
Question 837: Objectives for conducting performance appraisals during the ...
Question 838: Although the project charter serves to state the project man...
Question 839: Constancy of purpose is a core concept for continuous improv...
Question 840: Organizational process assets, a lessons-learned database, a...
Question 841: Which conflict resolution technique searches for solutions t...
Question 842: On your project you want to avoid bureaucracy, so you adopt ...
Question 843: On what is project baseline development established?...
Question 844: A communications management plan includes which one of the f...
Question 845: The project is going through quality assurance. Which of the...
Question 846: A risk response strategy in which the project team shifts th...
Question 847: Labor, materials, equipment, and supplies are examples of:...
Question 848: Written change requests should be required on______________...
Question 849: What happens to a stakeholder's project influence over time?...
Question 850: When large or complex projects are separated into distinct p...
Question 851: Activity A is worth $400, is 95% complete, and actually cost...
Question 852: Which of the following is a means of reaching a group decisi...
Question 853: What is the minimum a project schedule must include?...
Question 854: You are managing a large project with 20 key internal stakeh...
Question 855: The degree, amount, or volume of risk that an organization o...
Question 856: Which of the following is an output of Direct and Manage Pro...
Question 857: Changes in the report formats and lessons learned documents ...
Question 858: Activity cost estimates and the project schedule are inputs ...
Question 859: In the initial stage of the project life cycle, the project'...
Question 860: When a control chart is used to monitor performance of a pro...
Question 861: A weighting system can be used for all but which one of the ...
Question 862: Identifying interrelationships and potential overlap between...
Question 863: The project is progressing. As the company starts to release...
Question 864: A no-cost settlement sometimes is used______________...
Question 865: Which tool and technique is used in Conduct Procurements?...
Question 866: The project scope baseline should be used in the identify ri...
Question 867: The Closing Process Group includes which of the following Kn...
Question 868: Using the following data, what is the Schedule Performance I...
Question 869: A simple performance report provides information on_________...
Question 870: The internet marketing project is evaluating the size of the...
Question 871: The purpose of inspection in Perform Quality Control is to k...
Question 872: Which degree of authority does a project manager have on a p...
Question 873: What does a CPI value greater than 1.0 indicate?...
Question 874: When writing payment terms in your fixed-price subcontracts ...
Question 875: At the start of a typical project life cycle, costs are:...
Question 876: The company is implementing an enterprise time system across...
Question 877: Which Process Group includes the Manage Stakeholder Engageme...
Question 878: What is a tool and technique used in the Develop Project Man...
Question 879: Which of the following change requests can bring expected fu...
Question 880: Market conditions and published commercial information are e...
Question 881: The networking company that won the procurement contract has...
Question 882: Which technique is utilized in the Control Schedule process?...
Question 883: Increased attention to return on investment (ROI) now requir...
Question 884: One way to develop an understanding of major project stakeho...
Question 885: Cost baseline is an output of which of the following process...
Question 886: You work for a telecommunications company, and when developi...
Question 887: Which of the following is an example of push communication?...
Question 888: When managing a project team, what helps to reduce the amoun...
Question 889: The process of developing a detailed description of the proj...
Question 890: You realize that leadership without management or management...
Question 891: Payment bonds are often required by the contract and require...
Question 892: Project A is being administered using a matrix form of organ...
Question 893: Which of the following is a ground rule for project team bui...
Question 894: You are leading a team to recommend an equitable reward and ...
Question 895: Which of the following strategic considerations often result...
Question 896: Which of the following is an enterprise environmental factor...
Question 897: Within project integration management, the statement of work...
Question 898: You have been assigned as project manager on what could be a...
Question 899: The process of obtaining seller responses, selecting a selle...
Question 900: The team is involved in defining what is needed to ensure pr...
Question 901: What is the main deliverable from the Planning phase of a pr...
Question 902: Perform Quality Control is accomplished by:...
Question 903: The first step in collecting requirements on any project, la...
Question 904: The e-commerce project has gone well other than the fact tha...
Question 905: Team building should be ongoing throughout the project life ...
Question 906: Which term describes an assessment of correctness?...
Question 907: An input to the Control Quality process is:...
Question 908: Which type of analysis would be used for the Plan Quality pr...
Question 909: The terms strong matrix, balanced matrix, and weak matrix wh...
Question 910: You are managing a project to introduce a new product to the...
Question 911: On large contracts, the contract administrator typically has...
Question 912: The following chart contains information about the tasks in ...
Question 913: Validate scope works hand-in-hand with control quality and g...
Question 914: Fishbone diagrams are also known as what?...
Question 915: The most common communication problem that occurs during neg...
Question 916: Company-wide software licensing fees are an example of what ...
Question 917: Buyers use a variety of methods to provide incentives to a s...
Question 918: Variance and trend analysis is a tool and technique used in ...
Question 919: Project managers for international projects should recognize...
Question 920: You and your team are documenting requirements on you projec...
Question 921: During which process would you obtain stakeholders' formal a...
Question 922: You have been appointed project manager for a new project in...
Question 923: You are fairly new to managing a project but have been a tea...
Question 924: What is the difference between the critical path and the cri...
Question 925: Who is responsible for reviewing change requests and approvi...
Question 926: You are the Project Manager on a merger and acquisition proj...
Question 927: Which of the following correctly describes when organization...
Question 928: The Project Management Process Group in which performance is...
Question 929: Which of the following factors is lowest at the start of the...
Question 930: A project manager builds consensus and overcomes obstacles b...
Question 931: Assume you are working on a multi-phase project as your proj...
Question 932: When closing a project or phase, part of the process may req...
Question 933: You are working on the next generation of software for mobil...
Question 934: The key way for a project manager to promote optimum team pe...
Question 935: A weighting system is a tool for which area of procurement?...
Question 936: Behavior roles of team members influence the team's process,...
Question 937: Within your company's portfolio, your project is ranked in t...
Question 938: A risk may be graded into different priorities by which proc...
Question 939: What type of reward can hurt team cohesiveness?...
Question 940: Procurement documents are used in the identify stakeholder p...
Question 941: A team-building approach that facilitates concurrent enginee...
Question 942: Which of the following outputs from the Schedule Control pro...
Question 943: Which activity may occur at project or phase closure?...
Question 944: What is the critical chain method?...
Question 945: If the most likely duration of an activity is five weeks, th...
Question 946: Which process involves monitoring the status of the project ...
Question 947: A method to manage stakeholder expectations in the scope sta...
Question 948: Each project can benefit from stakeholder involvement; howev...
Question 949: You have a number of costs to track and manage because your ...
Question 950: How is scheduled variance calculated using the earned value ...
Question 951: Which process involves aggregating the estimated costs of th...
Question 952: The project team has just started breaking down the componen...
Question 953: Which of the following is an output from Control Scope?...
Question 954: An input to the Estimate Activity Resources process is:...
Question 955: You are managing the construction of a highly sophisticated ...
Question 956: Which Perform Quality Assurance tool or technique is used to...
Question 957: Schedule milestones and a predefined budget are examples of:...
Question 958: Your project management office implemented a project managem...
Question 959: Although there are various tools and techniques to consider ...
Question 960: Managing ongoing production of goods and services to ensure ...
Question 961: A process is defined as:
Question 962: Which of the following schedule network analysis techniques ...
Question 963: Which Knowledge Areas include processes from the Closing Pro...
Question 964: A conflict resolution approach that is NOT considered to be ...
Question 965: Fast tracking is a schedule compression technique used to sh...
Question 966: The construction engineer is doing questionable work on his ...
Question 967: The Project Manager and Functional Manager are having a disa...
Question 968: The Project Human Resource Management process that involves ...
Question 969: The risk urgency assessment is a tool and technique used for...
Question 970: Assume you are managing an international project. Your team ...
Question 971: Sharing good practices introduced or implemented in similar ...
Question 972: Design of experiments (DOE) should be used during which of t...
Question 973: Requirements typically are classified into product requireme...
Question 974: Working on your project management training curricula projec...
Question 975: Float on a Network diagram is also known as:...
Question 976: Which process involves applying budget amounts to the indivi...
Question 977: The primary benefit of contract control procurements is to e...
Question 978: In the Develop Project Team process, which of the following ...
Question 979: The stakeholder register should not be prepared only one tim...
Question 980: Your quality assurance department recently performed a quali...
Question 981: Conflicts in which following three areas represent the major...
Question 982: Project quality management was once thought to include only ...
Question 983: Managing change to the scope baseline is the main objective ...
Question 984: As the project manager, you have the option of proposing one...
Question 985: You are responsible for a project management training curric...
Question 986: Quality is very important to your company. Each project has ...
Question 987: You are leading a research project that will require between...
Question 988: You are managing a contact management software project and s...
Question 989: Control accounts______________
Question 990: The project manager for XYZ stationers is sequencing the act...
Question 991: Which of the following is an input of the Define Activities ...
Question 992: Change requests are processed for review and disposition acc...
Question 993: Which quality control technique illustrates the 80/20 princi...
Question 994: Project Management Process Groups are linked by:...
Question 995: Tools and techniques used in Direct and Manage Project Work ...
Question 996: As project manager, you plan to conduct a "kickoff" meeting ...
Question 997: The sponsor plays a key role in project success. Which of th...
Question 998: The major difference between the project coordinator and pro...
Question 999: Who provides the inputs for the original estimates of activi...
Question 1000: As a Project Manager you are managing a project that has man...
Question 1001: You are working on a new project in your organization. You n...
Question 1002: As a result of the control stakeholder expectations process,...
Question 1003: Which following item is NOT an input to control scope?...
Question 1004: The method of calculating the EAC by assuming the ETC work w...
Question 1005: The individual or group that provides resources and support ...
Question 1006: Constraints common to projects include______________...
Question 1007: There are three uses and types of Pareto analysis. If you wi...
Question 1008: As part of a mid-project evaluation, your project sponsor ha...
Question 1009: Because you are working under a firm-fixed-price contract, m...
Question 1010: The Project Manager is creating an estimate for building a c...
Question 1011: Your cost control specialist has developed a budget plan for...
Question 1012: The project team should have a working knowledge of statisti...
Question 1013: Which of the following best describes utilizing program mana...
Question 1014: Which type of estimating is used to improve the accuracy of ...
Question 1015: Lessons learned documentation is gathered during which of th...
Question 1016: Your company is embarking on a project to launch a new produ...
Question 1017: Work performance information includes all the following EXCE...
Question 1018: Which of the following is an output of the Monitor and Contr...
Question 1019: As you manage the railroad switching station project, you ar...
Question 1020: Which technique is utilized in the Schedule Control process?...
Question 1021: Which of the following is an output of the Perform Integrate...
Question 1022: The following chart contains information about the tasks in ...
Question 1023: How many Project Management Process Groups are there?...
Question 1024: The iterative and interactive nature of the Process Groups c...
Question 1025: Which of the following makes changes to formally control doc...
Question 1026: Which stakeholder communicates with higher levels of managem...
Question 1027: A Project Manager is assigned to a project that is in the co...
Question 1028: By reviewing cumulative cost curves, the project manager can...
Question 1029: Which process documents the business needs of a project and ...
Question 1030: The key inputs to the validate scope process include all the...