Question 276/722

Which of the following is the GREATEST benefit to an organization when updates to the risk register are made promptly after the completion of a risk assessment?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (722q)
Question 1: Which of the following would MOST likely cause a risk practi...
Question 2: A recent big data project has resulted in the creation of an...
Question 3: An organization wants to grant remote access to a system con...
Question 4: Which of the following is the MOST important objective of em...
Question 5: An organization has just implemented changes to close an ide...
Question 6: Which of the following would present the GREATEST challenge ...
Question 7: Which of The following should be of GREATEST concern for an ...
Question 8: Which of the following practices BEST mitigates risk related...
Question 9: An IT risk practitioner has been asked to regularly report o...
Question 10: Which of the following is the BEST method to ensure a termin...
Question 11: Which of the following is the MOST effective control to ensu...
Question 12: Which of the following is the BEST key performance indicator...
Question 13: An organization has determined a risk scenario is outside th...
Question 14: To help ensure all applicable risk scenarios are incorporate...
Question 15: Which of the following is performed after a risk assessment ...
Question 16: Which of the following is BEST used to aggregate data from m...
Question 17: A risk practitioner has collaborated with subject matter exp...
Question 18: Which of the following is a KEY responsibility of the second...
Question 19: Which of the following criteria associated with key risk ind...
Question 20: An organization recently experienced a cyber attack that res...
Question 21: A risk practitioner has identified that the agreed recovery ...
Question 22: An organization's Internet-facing server was successfully at...
Question 23: Which of the following is the PRIMARY objective of a risk aw...
Question 24: When formulating a social media policy lo address informatio...
Question 25: Which of the following risk activities is BEST facilitated b...
Question 26: Which of the following roles should be assigned accountabili...
Question 27: Which of the following would be MOST important for a risk pr...
Question 28: Which of the following should be an element of the risk appe...
Question 29: Who should be responsible for approving the cost of controls...
Question 30: Which of the following trends would cause the GREATEST conce...
Question 31: Which of the following is MOST useful when communicating ris...
Question 32: Which of the following MUST be assessed before considering r...
Question 33: The PRIMARY benefit of classifying information assets is tha...
Question 34: The PRIMARY purpose of using control metrics is to evaluate ...
Question 35: Which of the following should be the PRIMARY objective of pr...
Question 36: For a large software development project, risk assessments a...
Question 37: After an annual risk assessment is completed, which of the f...
Question 38: The PRIMARY objective of testing the effectiveness of a new ...
Question 39: Which of the following BEST helps to identify significant ev...
Question 40: Which of the following should be initiated when a high numbe...
Question 41: Which of the following is the PRIMARY role of the board of d...
Question 42: Which key performance efficiency IKPI) BEST measures the eff...
Question 43: Which of the following is the BEST way to ensure adequate re...
Question 44: Which of the following is the BEST approach for an organizat...
Question 45: Which of the following is the BEST key performance indicator...
Question 46: An effective control environment is BEST indicated by contro...
Question 47: Which of the following BEST measures the efficiency of an in...
Question 48: What is MOST important for the risk practitioner to understa...
Question 49: Which of the following is the BEST method to mitigate the ri...
Question 50: Who is MOST likely to be responsible for the coordination be...
Question 51: Several network user accounts were recently created without ...
Question 52: The percentage of unpatched systems is a:...
Question 53: An organization is planning to acquire a new financial syste...
Question 54: A control owner identifies that the organization's shared dr...
Question 55: An organization has recently been experiencing frequent data...
Question 56: Which of the following is MOST important to update when an o...
Question 57: An organization uses a web application hosted by a cloud ser...
Question 58: An organization is adopting block chain for a new financial ...
Question 59: Which of the following is the MOST important reason to revis...
Question 60: When developing risk treatment alternatives for a Business c...
Question 61: Which of the following should be a risk practitioner's NEXT ...
Question 62: Which of the following activities BEST facilitates effective...
Question 63: Which of the following would be MOST beneficial as a key ris...
Question 64: Which of the following statements BEST illustrates the relat...
Question 65: A key risk indicator (KRI) that incorporates data from exter...
Question 66: Which of the following is the MAIN reason for analyzing risk...
Question 67: An organization must make a choice among multiple options to...
Question 68: Within the three lines of defense model, the responsibility ...
Question 69: A service provider is managing a client's servers. During an...
Question 70: Which of the following is the GREATEST concern if user accep...
Question 71: Which of the following statements describes the relationship...
Question 72: Which of the following is MOST important for an organization...
Question 73: Which of the following would BEST help to ensure that identi...
Question 74: A failure in an organization s IT system build process has r...
Question 75: A risk practitioner notices a trend of noncompliance with an...
Question 76: Which of the following is the MOST important outcome of a bu...
Question 77: Which of the following is MOST important when developing key...
Question 78: An external security audit has reported multiple findings re...
Question 79: A hospital recently implemented a new technology to allow vi...
Question 80: Recovery the objectives (RTOs) should be based on...
Question 81: Which of the following is the MOST important reason to creat...
Question 82: Which of the following would be the result of a significant ...
Question 83: An application runs a scheduled job that compiles financial ...
Question 84: Which of the following BEST enables the risk profile to serv...
Question 85: Sensitive data has been lost after an employee inadvertently...
Question 86: When establishing leading indicators for the information sec...
Question 87: Which of the following would provide the MOST useful informa...
Question 88: IT risk assessments can BEST be used by management:...
Question 89: A risk practitioner has been asked to evaluate the adoption ...
Question 90: The acceptance of control costs that exceed risk exposure is...
Question 91: The PRIMARY benefit of maintaining an up-to-date risk regist...
Question 92: A risk practitioner has been notified that an employee sent ...
Question 93: Which of the following is MOST important to the effective mo...
Question 94: Which of the following is the GREATEST benefit of analyzing ...
Question 95: Risk acceptance of an exception to a security control would ...
Question 96: Which of the following activities is PRIMARILY the responsib...
Question 97: Which of the following should be determined FIRST when a new...
Question 98: Which of the following is the BEST way to confirm whether ap...
Question 99: Which of the following will BEST help an organization select...
Question 100: Which of the following is the MOST useful information for a ...
Question 101: A risk assessment has revealed that the probability of a suc...
Question 102: When defining thresholds for control key performance indicat...
Question 103: Which of the following is the BEST course of action for a sy...
Question 104: Which of the following is a drawback in the use of quantitat...
Question 105: A risk practitioner discovers that an IT operations team man...
Question 106: An organization is developing a risk universe to create a ho...
Question 107: Which of the following situations would BEST justify escalat...
Question 108: Which of the following BEST enforces access control for an o...
Question 109: During testing, a risk practitioner finds the IT department'...
Question 110: A department allows multiple users to perform maintenance on...
Question 111: Which of the following should a risk practitioner do NEXT af...
Question 112: An organization is considering allowing users to access comp...
Question 113: Implementing which of the following will BEST help ensure th...
Question 114: Accountability for a particular risk is BEST represented in ...
Question 115: A segregation of duties control was found to be ineffective ...
Question 116: Which of the following is the BEST source for identifying ke...
Question 117: Which of the following is the BEST indication of an effectiv...
Question 118: What is the MOST important consideration when aligning IT ri...
Question 119: An organization operates in an environment where reduced tim...
Question 120: Which of the following s MOST likely to deter an employee fr...
Question 121: To reduce the risk introduced when conducting penetration te...
Question 122: Which of the following is the MOST important consideration w...
Question 123: The PRIMARY reason for tracking the status of risk mitigatio...
Question 124: Which of the following is the PRIMARY factor in determining ...
Question 125: Which of the following would require updates to an organizat...
Question 126: A risk practitioner shares the results of a vulnerability as...
Question 127: While reviewing an organization's monthly change management ...
Question 128: Which of the following is MOST important to review when eval...
Question 129: Which of the following scenarios presents the GREATEST risk ...
Question 130: Which of the following practices MOST effectively safeguards...
Question 131: Which of the following is the PRIMARY reason to update a ris...
Question 132: The PRIMARY focus of an ongoing risk awareness program shoul...
Question 133: An organization learns of a new ransomware attack affecting ...
Question 134: Which of the following is the MOST critical factor to consid...
Question 135: Calculation of the recovery time objective (RTO) is necessar...
Question 136: An organization has agreed to a 99% availability for its onl...
Question 137: Which of the following controls will BEST detect unauthorize...
Question 138: A newly enacted information privacy law significantly increa...
Question 139: An audit reveals that there are changes in the environment t...
Question 140: An organization has granted a vendor access to its data in o...
Question 141: An IT organization is replacing the customer relationship ma...
Question 142: Which of the following BEST confirms the existence and opera...
Question 143: The BEST key performance indicator (KPI) to measure the effe...
Question 144: Management has required information security awareness train...
Question 145: The MAJOR reason to classify information assets is...
Question 146: Which of the following is the PRIMARY reason to establish th...
Question 147: Which of the following would BEST enable mitigation of newly...
Question 148: Which of the following BEST provides an early warning that n...
Question 149: An organization has recently updated its disaster recovery p...
Question 150: A PRIMARY advantage of involving business management in eval...
Question 151: An organization's internal audit department is considering t...
Question 152: A recent risk workshop has identified risk owners and respon...
Question 153: Which of the following should be of GREATEST concern to a ri...
Question 154: Which of the following is MOST helpful in preventing risk ev...
Question 155: An organization uses one centralized single sign-on (SSO) co...
Question 156: Prudent business practice requires that risk appetite not ex...
Question 157: An organization wants to launch a campaign to advertise a ne...
Question 158: An organization has provided legal text explaining the right...
Question 159: Warning banners on login screens for laptops provided by an ...
Question 160: The PRIMARY purpose of IT control status reporting is to:...
Question 161: Reviewing historical risk events is MOST useful for which of...
Question 162: An assessment of information security controls has identifie...
Question 163: Which of the following provides the MOST helpful reference p...
Question 164: In an organization with a mature risk management program, wh...
Question 165: Which of the following would BEST facilitate the maintenance...
Question 166: A third-party vendor has offered to perform user access prov...
Question 167: Who should be responsible for determining which stakeholders...
Question 168: Which of the following is the BEST way to determine the pote...
Question 169: Which of the following controls are BEST strengthened by a c...
Question 170: Because of a potential data breach, an organization has deci...
Question 171: Who is BEST suited to determine whether a new control proper...
Question 172: Which of the following is the GREATEST risk associated with ...
Question 173: Which of the following provides the MOST useful information ...
Question 174: Which of the following BEST helps to identify significant ev...
Question 175: Which of the following is the GREATEST concern when establis...
Question 176: Which of the following should be the risk practitioner s FIR...
Question 177: Which of the following scenarios represents a threat?...
Question 178: Which of the following is the MOST important benefit of key ...
Question 179: Which of the following is the MOST important consideration w...
Question 180: The MOST important consideration when selecting a control to...
Question 181: Which of the following is the MOST important reason to link ...
Question 182: A key risk indicator (KRI) threshold has reached the alert l...
Question 183: An organization has updated its acceptable use policy to mit...
Question 184: Which of the following BEST facilitates the development of r...
Question 185: A risk practitioners PRIMARY focus when validating a risk re...
Question 186: Which of the following would be a risk practitioners' BEST r...
Question 187: Which of the following would be MOST helpful when estimating...
Question 188: A review of an organization s controls has determined its da...
Question 189: Which of the following should be the FIRST course of action ...
Question 190: Which of the following is the MOST important course of actio...
Question 191: A financial institution has identified high risk of fraud in...
Question 192: In a public company, which group is PRIMARILY accountable fo...
Question 193: For no apparent reason, the time required to complete daily ...
Question 194: Which of the following is the MOST relevant information to i...
Question 195: The GREATEST benefit of including low-probability, high-impa...
Question 196: Which types of controls are BEST used to minimize the risk a...
Question 197: A large organization is replacing its enterprise resource pl...
Question 198: A risk practitioner is performing a risk assessment of recen...
Question 199: To help identify high-risk situations, an organization shoul...
Question 200: An organization has allowed several employees to retire earl...
Question 201: Which of the following should be the MAIN consideration when...
Question 202: Using key risk indicators (KRIs) to illustrate changes in th...
Question 203: During implementation of an intrusion detection system (IDS)...
Question 204: IT stakeholders have asked a risk practitioner for IT risk p...
Question 205: An organization has detected unauthorized logins to its clie...
Question 206: Senior management wants to increase investment in the organi...
Question 207: Which of the following is MOST important when defining contr...
Question 208: Which of the following is the MOST important step to ensure ...
Question 209: A risk practitioner is organizing a training session lo comm...
Question 210: The risk to an organization's reputation due to a recent cyb...
Question 211: An organization allows programmers to change production syst...
Question 212: Employees are repeatedly seen holding the door open for othe...
Question 213: Which of the following is the FIRST step in managing the ris...
Question 214: The PRIMARY reason for periodic penetration testing of Inter...
Question 215: Which of the following would be considered a vulnerability?...
Question 216: An organization's IT team has proposed the adoption of cloud...
Question 217: When creating a separate IT risk register for a large organi...
Question 218: Which of the following is the MOST effective control to main...
Question 219: Which of the following is the BEST approach when a risk trea...
Question 220: Which of the following BEST represents a critical threshold ...
Question 221: The number of tickets to rework application code has signifi...
Question 222: A PRIMARY function of the risk register is to provide suppor...
Question 223: Which of the following will BEST quantify the risk associate...
Question 224: A risk assessment indicates the residual risk associated wit...
Question 225: When developing a new risk register, a risk practitioner sho...
Question 226: Risk management strategies are PRIMARILY adopted to:...
Question 227: An organization has been made aware of a newly discovered cr...
Question 228: A risk practitioner has received an updated enterprise risk ...
Question 229: The PRIMARY reason for prioritizing risk scenarios is to:...
Question 230: Which of the following is the BEST key control indicator (KC...
Question 231: Which of the following is MOST effective against external th...
Question 232: Which of the following is the BEST metric to demonstrate the...
Question 233: Which of the following is MOST helpful to management when de...
Question 234: Which of the following is the MOST common concern associated...
Question 235: Reviewing which of the following BEST helps an organization ...
Question 236: A risk practitioner has been asked by executives to explain ...
Question 237: A company has located its computer center on a moderate eart...
Question 238: Which of the following should be the PRIMARY basis for decid...
Question 239: Which of the following will help ensure the elective decisio...
Question 240: Which of the following should be the risk practitioner s PRI...
Question 241: Which of the following is the GREATEST risk associated with ...
Question 242: What is the PRIMARY purpose of a business impact analysis (B...
Question 243: Which of the following would be- MOST helpful to understand ...
Question 244: Which of the following would be MOST relevant to stakeholder...
Question 245: Which of the following should be done FIRST when information...
Question 246: A highly regulated organization acquired a medical technolog...
Question 247: Who is BEST suited to provide information to the risk practi...
Question 248: An organization has experienced a cyber-attack that exposed ...
Question 249: Who is the MOST appropriate owner for newly identified IT ri...
Question 250: Which of the following is necessary to enable an IT risk reg...
Question 251: An identified high probability risk scenario involving a cri...
Question 252: Controls should be defined during the design phase of system...
Question 253: When evaluating a number of potential controls for treating ...
Question 254: When implementing an IT risk management program, which of th...
Question 255: Which of the following is the MOST important requirement for...
Question 256: Which of the following poses the GREATEST risk to an organiz...
Question 257: While reviewing the risk register, a risk practitioner notic...
Question 258: Which of the following is the PRIMARY purpose of creating an...
Question 259: Which of the following should be a risk practitioner's MOST ...
Question 260: Which of the following should be included in a risk scenario...
Question 261: Which of the following is the BEST way to support communicat...
Question 262: The software version of an enterprise's critical business ap...
Question 263: An organization is concerned that its employees may be unint...
Question 264: Which of the following is the BEST way to determine software...
Question 265: The purpose of requiring source code escrow in a contractual...
Question 266: Which of the following would BEST enable a risk-based decisi...
Question 267: Which of the following is the MOST effective way to help ens...
Question 268: Read" rights to application files in a controlled server env...
Question 269: When documenting a risk response, which of the following pro...
Question 270: Which of the following would be the GREATEST concern for an ...
Question 271: An organization has completed a risk assessment of one of it...
Question 272: Which of the following should a risk practitioner do FIRST w...
Question 273: In an organization dependent on data analytics to drive deci...
Question 274: An organization is considering outsourcing user administrati...
Question 275: Which of the following is the PRIMARY consideration when est...
Question 276: Which of the following is the GREATEST benefit to an organiz...
Question 277: During a risk assessment, a key external technology supplier...
Question 278: Which of the following should be of MOST concern to a risk p...
Question 279: An IT control gap has been identified in a key process. Who ...
Question 280: Which of the following is MOST important to communicate to s...
Question 281: Which of the following techniques would be used during a ris...
Question 282: Of the following, whose input is ESSENTIAL when developing r...
Question 283: Which of the following BEST mitigates reputational risk asso...
Question 284: Which of the following should be the PRIMARY consideration w...
Question 285: Which of the following provides the BEST evidence that robus...
Question 286: Which of the following criteria is MOST important when devel...
Question 287: The risk associated with inadvertent disclosure of database ...
Question 288: Which organizational role should be accountable for ensuring...
Question 289: Which of the following is MOST important to determine as a r...
Question 290: Which of the following is the PRIMARY benefit of stakeholder...
Question 291: A rule-based data loss prevention {DLP) tool has recently be...
Question 292: Which of the following is the BEST key performance indicator...
Question 293: A poster has been displayed in a data center that reads. "An...
Question 294: Which of the following is MOST helpful to review when identi...
Question 295: Which of the following is a risk practitioner's BEST course ...
Question 296: Which of the following would BEST facilitate the implementat...
Question 297: During the initial risk identification process for a busines...
Question 298: An organization is increasingly concerned about loss of sens...
Question 299: A risk assessment has identified that an organization may no...
Question 300: An organization is concerned that a change in its market sit...
Question 301: The analysis of which of the following will BEST help valida...
Question 302: Which of the following issues should be of GREATEST concern ...
Question 303: When presenting risk, the BEST method to ensure that the ris...
Question 304: An organization's recovery team is attempting to recover cri...
Question 305: Which of the following activities is a responsibility of the...
Question 306: Which of the following is MOST important when developing ris...
Question 307: The objective of aligning mitigating controls to risk appeti...
Question 308: Which of the following observations from a third-party servi...
Question 309: Print jobs containing confidential information are sent to a...
Question 310: Which of the following would be MOST helpful when communicat...
Question 311: A global organization has implemented an application that do...
Question 312: A department has been granted an exception to bypass the exi...
Question 313: Which of the following is the BEST way to promote adherence ...
Question 314: Which of the following is MOST important to the effectivenes...
Question 315: Which of the following is the MOST important consideration w...
Question 316: A risk owner should be the person accountable for:...
Question 317: Which of the following is the MOST effective way to incorpor...
Question 318: Which of the following would BEST indicate to senior managem...
Question 319: Which of the following is the MOST important criteria for se...
Question 320: Which of the following is the MOST comprehensive resource fo...
Question 321: Which of the following is the BEST control to detect an adva...
Question 322: Which of the following indicates an organization follows IT ...
Question 323: Which of the following BEST indicates effective information ...
Question 324: An application development team has a backlog of user requir...
Question 325: The PRIMARY reason for establishing various Threshold levels...
Question 326: Which of the following is MOST important to include in a ris...
Question 327: When reviewing a risk response strategy, senior management's...
Question 328: Which of the following is the BEST way to identify changes t...
Question 329: Which of the following is the MOST appropriate action when a...
Question 330: Which of the following is MOST important for a risk practiti...
Question 331: Which of the following would be a weakness in procedures for...
Question 332: The PRIMARY purpose of using a framework for risk analysis i...
Question 333: The PRIMARY benefit associated with key risk indicators (KRl...
Question 334: Which of the following is the MOST effective way to mitigate...
Question 335: Zero Trust architecture is designed and deployed with adhere...
Question 336: Which of the following is the BEST way to assess the effecti...
Question 337: An organization is planning to outsource its payroll functio...
Question 338: Who is MOST important lo include in the assessment of existi...
Question 339: Which of the following is the MOST likely reason an organiza...
Question 340: Which group has PRIMARY ownership of reputational risk stemm...
Question 341: Which of the following is the GREATEST risk associated with ...
Question 342: Which of the following should be the GREATEST concern to a r...
Question 343: Which of the following is the GREATEST risk associated with ...
Question 344: Which of the following is the MOST important document regard...
Question 345: Which of the following is the PRIMARY reason to perform ongo...
Question 346: Which of the following should be the PRIMARY consideration w...
Question 347: An enterprise has taken delivery of software patches that ad...
Question 348: Which of the following is the BEST method for determining an...
Question 349: An organization recently implemented a machine learning-base...
Question 350: Which of the following is the PRIMARY responsibility of the ...
Question 351: Which of the following is the GREATEST risk of relying on ar...
Question 352: After the implementation of internal of Things (IoT) devices...
Question 353: Which of the following is the PRIMARY reason for an organiza...
Question 354: It is MOST important for a risk practitioner to have an awar...
Question 355: A change management process has recently been updated with n...
Question 356: Which of the following actions should a risk practitioner do...
Question 357: Which of the following helps ensure compliance with a nonrep...
Question 358: An organization is unable to implement a multi-factor authen...
Question 359: Within the three lines of defense model, the accountability ...
Question 360: Which of the following is the MOST important consideration f...
Question 361: Which of the following is the PRIMARY reason to use key cont...
Question 362: Which of the following should be the PRIMARY focus of an ind...
Question 363: Key control indicators (KCls) help to assess the effectivene...
Question 364: Which of the following is the MOST important benefit of repo...
Question 365: Numerous media reports indicate a recently discovered techni...
Question 366: Which of the following is the BEST way to mitigate the risk ...
Question 367: After the announcement of a new IT regulatory requirement, i...
Question 368: Which of the following provides the BEST evidence that a sel...
Question 369: A control process has been implemented in response to a new ...
Question 370: Well-developed, data-driven risk measurements should be:...
Question 371: When using a third party to perform penetration testing, whi...
Question 372: An IT license audit has revealed that there are several unli...
Question 373: Which of the following is the MOST important consideration w...
Question 374: Which of the following will BEST help mitigate the risk asso...
Question 375: Which of the following is the MOST important consideration w...
Question 376: Which of the following is the MOST important consideration f...
Question 377: Which of the following should a risk practitioner do FIRST t...
Question 378: An organization has been notified that a disgruntled, termin...
Question 379: When a high-risk security breach occurs, which of the follow...
Question 380: Which of the following presents the GREATEST privacy risk re...
Question 381: Which of the following will BEST mitigate the risk associate...
Question 382: Which of the following should be considered FIRST when asses...
Question 383: Which of the following is MOST important for management to c...
Question 384: Which of the following is MOST helpful when prioritizing act...
Question 385: Who should be accountable for ensuring effective cybersecuri...
Question 386: It is MOST appropriate for changes to be promoted to product...
Question 387: Which of the following provides the BEST measurement of an o...
Question 388: Which of the following is MOST important to consider before ...
Question 389: Which of the following proposed benefits is MOST likely to i...
Question 390: Which of the following provides the MOST useful input to the...
Question 391: A risk practitioner has been asked to propose a risk accepta...
Question 392: Which of the following is the BEST indicator of the effectiv...
Question 393: Which strategy employed by risk management would BEST help t...
Question 394: A data center has recently been migrated to a jurisdiction w...
Question 395: A maturity model will BEST indicate:...
Question 396: A MAJOR advantage of using key risk indicators (KRis) is tha...
Question 397: Which of the following sources is MOST relevant to reference...
Question 398: A vulnerability assessment of a vendor-supplied solution has...
Question 399: The operational risk associated with attacks on a web applic...
Question 400: Which of the following will BEST ensure that information sec...
Question 401: An online payment processor would be severely impacted if th...
Question 402: Which of the following is the MOST important consideration f...
Question 403: A company has located its computer center on a moderate eart...
Question 404: Which of the following would provide the BEST guidance when ...
Question 405: Which of the following should management consider when selec...
Question 406: Which of the following is the BEST method to track asset inv...
Question 407: During a risk assessment, the risk practitioner finds a new ...
Question 408: Which of the following is MOST important for a risk practiti...
Question 409: Which of the following is the MOST useful indicator to measu...
Question 410: The MAIN purpose of conducting a control self-assessment (CS...
Question 411: Which of the following provides the MOST useful information ...
Question 412: Which of the following will BEST help to ensure new IT polic...
Question 413: An organization has experienced several incidents of extende...
Question 414: Which of the following would be the BEST key performance ind...
Question 415: An organization has built up its cash reserves and has now b...
Question 416: A multinational organization is considering implementing sta...
Question 417: Which of the following is the GREATEST benefit of having a m...
Question 418: What should be the PRIMARY driver for periodically reviewing...
Question 419: A risk practitioner has determined that a key control does n...
Question 420: Which of the following would be a risk practitioner'$ BEST r...
Question 421: Reviewing which of the following BEST helps an organization ...
Question 422: Which of the following is the BEST recommendation to senior ...
Question 423: Which of the following is the BEST recommendation to address...
Question 424: Determining if organizational risk is tolerable requires:...
Question 425: Which of the following should be a risk practitioner's GREAT...
Question 426: A risk practitioner has discovered a deficiency in a critica...
Question 427: What is the MAIN benefit of using a top-down approach to dev...
Question 428: The BEST way to justify the risk mitigation actions recommen...
Question 429: Which of the following controls BEST enables an organization...
Question 430: Which of the following offers the SIMPLEST overview of chang...
Question 431: Reviewing results from which of the following is the BEST wa...
Question 432: An organization's board of directors is concerned about rece...
Question 433: An organization plans to migrate sensitive information to a ...
Question 434: Which of the following should be the PRIMARY input to determ...
Question 435: When reviewing management's IT control self-assessments, a r...
Question 436: Which of the following emerging technologies is frequently u...
Question 437: Which of the following provides the MOST useful information ...
Question 438: Which of the following is the BEST way to help ensure risk w...
Question 439: Which of the following is MOST likely to introduce risk for ...
Question 440: Whether the results of risk analyses should be presented in ...
Question 441: WhichT5f the following is the MOST effective way to promote ...
Question 442: Who is accountable for risk treatment?...
Question 443: Which of the following BEST protects an organization against...
Question 444: The effectiveness of a control has decreased. What is the MO...
Question 445: Which of the following is the GREATEST benefit of a three li...
Question 446: Which of the following is the MOST important information to ...
Question 447: What is the PRIMARY reason an organization should include ba...
Question 448: Which of the following is MOST important for an organization...
Question 449: Which of the following approaches BEST identifies informatio...
Question 450: From a business perspective, which of the following is the M...
Question 451: The PRIMARY reason for periodically monitoring key risk indi...
Question 452: Which of the following is the PRIMARY benefit of consistentl...
Question 453: An organization has outsourced its backup and recovery proce...
Question 454: A bank wants to send a critical payment order via email to o...
Question 455: Which of the following is the FIRST step in managing the sec...
Question 456: Which of the following is the PRIMARY reason to have the ris...
Question 457: During an IT department reorganization, the manager of a ris...
Question 458: Which of the following should an organization perform to for...
Question 459: A risk practitioner has been asked to evaluate the adoption ...
Question 460: Which of the following is a KEY outcome of risk ownership?...
Question 461: An organization moved its payroll system to a Software as a ...
Question 462: The implementation of a risk treatment plan will exceed the ...
Question 463: A risk practitioner is reviewing accountability assignments ...
Question 464: Which stakeholders are PRIMARILY responsible for determining...
Question 465: An unauthorized individual has socially engineered entry int...
Question 466: Which of the following will BEST help ensure that risk facto...
Question 467: Which of the following would be of MOST concern to a risk pr...
Question 468: An organization's risk register contains a large volume of r...
Question 469: Which of the following would BEST assist in reconstructing t...
Question 470: Which of the following is MOST important to the effectivenes...
Question 471: After a risk has been identified, who is in the BEST positio...
Question 472: Which of the following is the MOST important objective of es...
Question 473: Which of the following will MOST improve stakeholders' under...
Question 474: Which of the following should be the PRIMARY consideration w...
Question 475: Of the following, who is BEST suited to assist a risk practi...
Question 476: Which of the following aspects of an IT risk and control sel...
Question 477: it was determined that replication of a critical database us...
Question 478: Which of the following should be a risk practitioner's NEXT ...
Question 479: Following a review of a third-party vendor, it is MOST impor...
Question 480: Which of the following would be the BEST way to help ensure ...
Question 481: Which of the following is a crucial component of a key risk ...
Question 482: What is the BEST information to present to business control ...
Question 483: Which of the following is the PRIMARY accountability for a c...
Question 484: Which of the following would BEST help minimize the risk ass...
Question 485: The PRIMARY benefit of conducting a risk workshop using a to...
Question 486: A business unit is updating a risk register with assessment ...
Question 487: An organization has implemented a preventive control to lock...
Question 488: The BEST metric to demonstrate that servers are configured s...
Question 489: Which of the following BEST prevents control gaps in the Zer...
Question 490: It is MOST important that security controls for a new system...
Question 491: The MAIN purpose of reviewing a control after implementation...
Question 492: Which of the following would be the BEST justification to in...
Question 493: Establishing and organizational code of conduct is an exampl...
Question 494: Which of the following would BEST indicate to senior managem...
Question 495: The risk associated with data loss from a website which cont...
Question 496: An incentive program is MOST likely implemented to manage th...
Question 497: Which of the following BEST enables an organization to deter...
Question 498: During a review of the asset life cycle process, a risk prac...
Question 499: Which of the following is the BEST indication of the effecti...
Question 500: Which of the following is MOST important to determine when a...
Question 501: An internally developed payroll application leverages Platfo...
Question 502: A penetration test reveals several vulnerabilities in a web-...
Question 503: Which of the following approaches will BEST help to ensure t...
Question 504: What is the BEST recommendation to reduce the risk associate...
Question 505: A key performance indicator (KPI) shows that a process is op...
Question 506: Which of the following is the BEST way to determine whether ...
Question 507: Of the following, who is responsible for approval when a cha...
Question 508: An organization has four different projects competing for fu...
Question 509: Which of the following IT controls is MOST useful in mitigat...
Question 510: Which of the following should be the GREATEST concern for an...
Question 511: Which of the following activities should only be performed b...
Question 512: Business management is seeking assurance from the CIO that I...
Question 513: An organization has initiated a project to implement an IT r...
Question 514: Which of the following is the PRIMARY role of a data custodi...
Question 515: Which of the following is the BEST way to determine whether ...
Question 516: Which of the following BEST helps to balance the costs and b...
Question 517: An organization's IT department wants to complete a proof of...
Question 518: To communicate the risk associated with IT in business terms...
Question 519: Which of the following is MOST likely to cause a key risk in...
Question 520: Risk aggregation in a complex organization will be MOST succ...
Question 521: When communicating changes in the IT risk profile, which of ...
Question 522: A business impact analysis (BIA) enables an organization to ...
Question 523: Which of the following is MOST helpful in developing key ris...
Question 524: An organization automatically approves exceptions to securit...
Question 525: Which of the following BEST indicates how well a web infrast...
Question 526: Which of the following is a PRIMARY benefit of engaging the ...
Question 527: Which of the following is the MOST effective key performance...
Question 528: Who should be PRIMARILY responsible for establishing an orga...
Question 529: The MOST important reason to aggregate results from multiple...
Question 530: Which of the following is the ULTIMATE objective of utilizin...
Question 531: Which of the following is MOST helpful in determining the ef...
Question 532: An IT risk practitioner has determined that mitigation activ...
Question 533: Which of the following is the BEST method for identifying vu...
Question 534: In order to determining a risk is under-controlled the risk ...
Question 535: After a high-profile systems breach at an organization s key...
Question 536: An organization practices the principle of least privilege. ...
Question 537: Which of the following is the PRIMARY purpose of periodicall...
Question 538: Which of the following will BEST help to improve an organiza...
Question 539: What should a risk practitioner do FIRST when vulnerability ...
Question 540: Which of the following management actions will MOST likely c...
Question 541: A large organization needs to report risk at all levels for ...
Question 542: Which of the following is the MOST important consideration f...
Question 543: Which of the following would be of GREATEST concern to a ris...
Question 544: An organization has an internal control that requires all ac...
Question 545: A risk practitioner has just learned about new malware that ...
Question 546: When reviewing a business continuity plan (BCP). which of th...
Question 547: Which of the following will BEST communicate the importance ...
Question 548: Which of the following is the BEST method to identify unnece...
Question 549: When prioritizing risk response, management should FIRST:...
Question 550: A risk practitioner is reviewing a vendor contract and finds...
Question 551: Which of the following would MOST effectively enable a busin...
Question 552: Which of the following BEST supports ethical IT risk managem...
Question 553: Which of the following is MOST important when developing key...
Question 554: Following a significant change to a business process, a risk...
Question 555: Which of the following is the PRIMARY reason to establish th...
Question 556: Which of the following should be the MOST important consider...
Question 557: A company has recently acquired a customer relationship mana...
Question 558: Which of the following events is MOST likely to trigger the ...
Question 559: When updating a risk register with the results of an IT risk...
Question 560: Which of the following would BEST provide early warning of a...
Question 561: Which of the following would be a risk practitioner's GREATE...
Question 562: The PRIMARY goal of a risk management program is to:...
Question 563: Reviewing which of the following provides the BEST indicatio...
Question 564: A new regulator/ requirement imposes severe fines for data l...
Question 565: Which of the following will MOST likely change as a result o...
Question 566: A contract associated with a cloud service provider MUST inc...
Question 567: Which of the following is the MAIN reason to continuously mo...
Question 568: Which of the following is the MOST important characteristic ...
Question 569: Which of the following BEST enables detection of ethical vio...
Question 570: Which of the following will BEST help to ensure the continue...
Question 571: Which of the following BEST enables risk-based decision maki...
Question 572: Which of the following should be the PRIMARY input when desi...
Question 573: Which of the following methods is the BEST way to measure th...
Question 574: The BEST way for an organization to ensure that servers are ...
Question 575: Continuous monitoring of key risk indicators (KRIs) will:...
Question 576: IT disaster recovery point objectives (RPOs) should be based...
Question 577: During the creation of an organization's IT risk management ...
Question 578: Which of the following techniques is MOST helpful when quant...
Question 579: A large organization recently restructured the IT department...
Question 580: It was discovered that a service provider's administrator wa...
Question 581: A migration from an in-house developed system to an external...
Question 582: The BEST key performance indicator (KPI) for monitoring adhe...
Question 583: An organization has asked an IT risk practitioner to conduct...
Question 584: Which of the following is MOST important for senior manageme...
Question 585: Which of the following is the MAIN benefit of involving stak...
Question 586: Improvements in the design and implementation of a control w...
Question 587: An organization wants to assess the maturity of its internal...
Question 588: Which of the following risk scenarios would be the GREATEST ...
Question 589: An organization's business gap analysis reveals the need for...
Question 590: One of an organization's key IT systems cannot be patched be...
Question 591: An organization has decided to implement a new Internet of T...
Question 592: After mapping generic risk scenarios to organizational secur...
Question 593: The BEST metric to monitor the risk associated with changes ...
Question 594: The BEST key performance indicator (KPI) to measure the effe...
Question 595: Which of the following is the MOST important consideration w...
Question 596: Which of the following is the BEST key performance indicator...
Question 597: What should a risk practitioner do FIRST when a shadow IT ap...
Question 598: A payroll manager discovers that fields in certain payroll r...
Question 599: Which of the following is MOST important for an organization...
Question 600: All business units within an organization have the same risk...
Question 601: A failed IT system upgrade project has resulted in the corru...
Question 602: Which of the following is the MOST important update for keep...
Question 603: Which of the following is a risk practitioner's BEST recomme...
Question 604: Which of the following would be the GREATEST challenge when ...
Question 605: An organization is implementing internet of Things (loT) tec...
Question 606: An organization has decided to outsource a web application, ...
Question 607: A risk practitioner has been asked to evaluate a new cloud-b...
Question 608: An organization has identified a risk exposure due to weak t...
Question 609: A recent regulatory requirement has the potential to affect ...
Question 610: Which element of an organization's risk register is MOST imp...
Question 611: Which of the following should be the PRIMARY focus of a risk...
Question 612: Which of the following will BEST help to ensure that informa...
Question 613: Which of the following will BEST support management repottin...
Question 614: An organization operates in an environment where the impact ...
Question 615: The PRIMARY objective for selecting risk response options is...
Question 616: Which of the following provides The BEST information when de...
Question 617: Which of the following would be MOST helpful to a risk pract...
Question 618: Which of the following BEST enables an organization to deter...
Question 619: Which of the following is MOST important when conducting a p...
Question 620: Which of the following BEST enables a proactive approach to ...
Question 621: Which of the following is the GREATEST benefit of using IT r...
Question 622: Which of the following is MOST helpful to ensure effective s...
Question 623: Which of the following deficiencies identified during a revi...
Question 624: Which of the following is MOST helpful in identifying gaps b...
Question 625: The MAIN reason for creating and maintaining a risk register...
Question 626: Which of the following would MOST likely result in updates t...
Question 627: The acceptance of control costs that exceed risk exposure MO...
Question 628: Which of the following is MOST important for a risk practiti...
Question 629: The PRIMARY objective of collecting information and reviewin...
Question 630: A risk practitioner observes that hardware failure incidents...
Question 631: Which of the following is MOST important to update following...
Question 632: Which of the following is the GREATEST risk associated with ...
Question 633: Mapping open risk issues to an enterprise risk heat map BEST...
Question 634: When developing risk scenario using a list of generic scenar...
Question 635: Within the three lines of defense model, the PRIMARY respons...
Question 636: Winch of the following can be concluded by analyzing the lat...
Question 637: Which of the following is the BEST method for assessing cont...
Question 638: Which of the following information is MOST useful to a risk ...
Question 639: Which of the following is the PRIMARY objective of maintaini...
Question 640: Which of the following MUST be updated to maintain an IT ris...
Question 641: When testing the security of an IT system, il is MOST import...
Question 642: A risk practitioner identifies an increasing trend of employ...
Question 643: Which of the following is MOST important when discussing ris...
Question 644: An organization is conducting a review of emerging risk. Whi...
Question 645: From a risk management perspective, the PRIMARY objective of...
Question 646: Which of the following is MOST useful for measuring the exis...
Question 647: Which of the following is the MAIN benefit to an organizatio...
Question 648: The FIRST task when developing a business continuity plan sh...
Question 649: Which of the following BEST enables the timely detection of ...
Question 650: A management team is on an aggressive mission to launch a ne...
Question 651: Which of the following is the GREATEST concern associated wi...
Question 652: A control for mitigating risk in a key business area cannot ...
Question 653: Which of the following BEST supports the management of ident...
Question 654: Which of the following is the BEST indicator of executive ma...
Question 655: Which of the following is a detective control?...
Question 656: The PRIMARY goal of conducting a business impact analysis (B...
Question 657: What information is MOST helpful to asset owners when classi...
Question 658: Which of the following is MOST helpful in providing an overv...
Question 659: An organization recently implemented a cybersecurity awarene...
Question 660: Which of the following is the MOST important component in a ...
Question 661: Legal and regulatory risk associated with business conducted...
Question 662: Which of the following is MOST important to ensure when cont...
Question 663: Which of the following should be the starting point when per...
Question 664: A key risk indicator (KRI) indicates a reduction in the perc...
Question 665: Which of the following is MOST important to include in a Sof...
Question 666: Which of the following would MOST likely cause management to...
Question 667: Which of the following is the PRIMARY reason for monitoring ...
Question 668: An organization has outsourced its billing function to an ex...
Question 669: Which of the following describes the relationship between ri...
Question 670: An internal audit report reveals that not all IT application...
Question 671: An organization has initiated a project to launch an IT-base...
Question 672: Which of the following should be used as the PRIMARY basis f...
Question 673: Which of the following is the MOST important consideration w...
Question 674: Which of the following is the BEST way to manage the risk as...
Question 675: An organization is planning to move its application infrastr...
Question 676: An organization is moving its critical assets to the cloud. ...
Question 677: Days before the realization of an acquisition, a data breach...
Question 678: Which of the following BEST enables a risk practitioner to i...
Question 679: Which of the following is the BEST way to protect sensitive ...
Question 680: A risk practitioner is assisting with the preparation of a r...
Question 681: The MOST important reason to monitor key risk indicators (KR...
Question 682: A risk practitioner is reporting on an increasing trend of r...
Question 683: Which of the following will BEST help in communicating strat...
Question 684: Which of the following should be a risk practitioner's PRIMA...
Question 685: An organization's risk management team wants to develop IT r...
Question 686: An insurance company handling sensitive and personal informa...
Question 687: The MOST effective approach to prioritize risk scenarios is ...
Question 688: Which of the following is MOST important to promoting a risk...
Question 689: Which of the following provides the BEST evidence that risk ...
Question 690: A web-based service provider with a low risk appetite for sy...
Question 691: Which of the following is the PRIMARY benefit of integrating...
Question 692: Which of the following BEST enables the development of a suc...
Question 693: Which of the following is the BEST way to identify changes i...
Question 694: Which of the following BEST indicates the effective implemen...
Question 695: Which of the following is the PRIMARY purpose of a risk regi...
Question 696: Which of the following would qualify as a key performance in...
Question 697: A newly incorporated enterprise needs to secure its informat...
Question 698: Which type of indicators should be developed to measure the ...
Question 699: An organization recently received an independent security au...
Question 700: Which of the following should be management's PRIMARY consid...
Question 701: Which of the following key risk indicators (KRIs) is MOST ef...
Question 702: To reduce costs, an organization is combining the second and...
Question 703: When classifying and prioritizing risk responses, the areas ...
Question 704: Which of the following is of GREATEST concern when uncontrol...
Question 705: Which of the following is the result of a realized risk scen...
Question 706: An organization has raised the risk appetite for technology ...
Question 707: Which of the following observations would be GREATEST concer...
Question 708: Which of the following is the BEST way to mitigate the risk ...
Question 709: Which of the following would BEST help secure online financi...
Question 710: Which of the following is the MOST important objective of re...
Question 711: An organization has operations in a location that regularly ...
Question 712: A business unit is updating a risk register with assessment ...
Question 713: The head of a business operations department asks to review ...
Question 714: Which of the following is the MOST important data source for...
Question 715: Which of the following facilitates a completely independent ...
Question 716: Which of the following is the BEST key performance indicator...
Question 717: Which of the following stakeholders define risk tolerance fo...
Question 718: When a risk practitioner is determining a system's criticali...
Question 719: An audit reveals that several terminated employee accounts m...
Question 720: A risk practitioner is defining metrics for security threats...
Question 721: A risk practitioner is developing a set of bottom-up IT risk...
Question 722: A risk practitioner is reviewing the status of an action pla...