Improvements in the design and implementation of a control will MOST likely result in an update to:
Correct Answer: B
Residual risk is the risk that remains after applying controls to mitigate the inherent risk. Inherent risk is the risk that exists before considering the controls. Risk appetite is the amount and type of risk that an organization is willing to accept in pursuit of its objectives. Risk tolerance is the acceptable level of variation from the risk appetite. Improvements in the design and implementation of a control will most likely result in an update to the residual risk, because they will reduce the likelihood and impact of the risk event, and therefore lower the risk exposure and value. By improving the design and implementation of a control, the organization can enhance the effectiveness and efficiency of the control, and ensure that it is aligned with the risk objectives, expectations, and outcomes. The improvement can also address any gaps, overlaps, redundancies, or conflicts among the controls, and any changes or enhancements that are needed to optimize the controls. The other options are less likely to be updated due to improvements in the design and implementation of a control. The inherent risk will not change, as it is based on the nature and value of the asset and the threats and vulnerabilities that exist. The risk appetite and the risk tolerance will also not change, as they are based on the organization's culture, strategy, and stakeholder expectations. Therefore, the most likely factor to be updated is the residual risk, as it reflects the actual risk level that the organization faces after applying the controls. References = Risk IT Framework, ISACA, 2022, p. 131