A supply manager for an electronics manufacturer is asked to source packaging for the company's new printed circuit board. The specifications recommend 0.50 mm tolerances, with a projected breakage ratio of 0.50%, at a cost of $1.00 each. The supply manager finds an alternative source that is specified at 0.60 mm tolerances, with a projected breakage ratio of 0.75%, at a cost of $0.80 each. If the cost of the new circuit board is $120 per unit, which packaging should the supply manager recommend and why?
Correct Answer: C
To determine the most cost-effective packaging option, we need to consider both the cost per packaging unit and the projected breakage ratio. Here are the calculations: For 0.50 mm packaging: * Cost per unit: $1.00 * Breakage ratio: 0.50% * Effective cost considering breakage: $1.00 * (1 + 0.005) = $1.005 For 0.60 mm packaging: * Cost per unit: $0.80 * Breakage ratio: 0.75% * Effective cost considering breakage: $0.80 * (1 + 0.0075) = $0.806 Comparing $1.005 to $0.806, the 0.60 mm packaging is more cost-effective. Therefore, the supply manager should recommend the 0.60 mm packaging. References * Supply Chain Management principles regarding cost analysis. * Basic breakage and cost calculations used in supply chain decision-making.