Valid N10-008 Dumps shared by ExamDiscuss.com for Helping Passing N10-008 Exam! ExamDiscuss.com now offer the newest N10-008 exam dumps, the ExamDiscuss.com N10-008 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com N10-008 dumps with Test Engine here:
After installing a series of Cat 8 keystones, a data center architect notices higher than normal interference during tests. Which of the following steps should the architect take to troubleshoot the issue?
Correct Answer: A
Cat 8 keystones are shielded to prevent interference from external sources, but they also require proper grounding to avoid interference from within the cable. Wrapping the end connections with copper tape before terminating them is one way to ensure a good ground connection and reduce interference. Using passthrough modular crimping plugs, connecting the RX/TX wires to different pins, or running a speed test on a slow device are not relevant or effective steps to troubleshoot the issue. References: * CompTIA Network+ N10-008 Certification Study Guide, page 191 * CompTIA Network+ N10-008 Cert Guide, Deluxe Edition, page 362 * CAT8 RJ45 Keystone Problem : r/HomeNetworking2 * How to Terminate Cat8 Shielded Keystone Jacks3