Valid CRISC Dumps shared by ExamDiscuss.com for Helping Passing CRISC Exam! ExamDiscuss.com now offer the newest CRISC exam dumps, the ExamDiscuss.com CRISC exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com CRISC dumps with Test Engine here:
You are the project manager of GHT project. Your project utilizes a machine for production of goods. This machine has the specification that if its temperature would rise above 450 degree Fahrenheit then it may result in burning of windings. So, there is an alarm which blows when machine's temperature reaches 430 degree Fahrenheit and the machine is shut off for 1 hour. What role does alarm contribute here?
Correct Answer: A
is incorrect. The temperature 430 degree in scenario is the risk trigger. A risk trigger is a warning sign or condition that a risk event is about to happen. As in this scenario the 430 degree temperature is the indication of upcoming risks, hence 430 degree temperature is a risk trigger. Answer:D is incorrect. Risk response is the action taken to reduce the risk event occurrence. Hence here risk response is shutting off of machine. Answer:B is incorrect. The first thing we must do in risk management is to identify the areas of the project where the risks can occur. This is termed as risk identification. Listing all the possible risks is proved to be very productive for the enterprise as we can cure them before it can occur. In risk identification both threats and opportunities are considered, as both carry some level of risk with them.