Valid CTFL_Syll2018 Dumps shared by ExamDiscuss.com for Helping Passing CTFL_Syll2018 Exam! ExamDiscuss.com now offer the newest CTFL_Syll2018 exam dumps, the ExamDiscuss.com CTFL_Syll2018 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com CTFL_Syll2018 dumps with Test Engine here:
A program is used to control a manufacturing line (turn machines on and off. start and stop conveyor belts, add raw materials to the flow, etc.) Not all actions are possible at all times For example, there are certain manufacturing stages that cannot be stopped - unless there is an emergency. A tester attempts to evaluate if all such cases (where a specific action is not allowed) are covered by the tests. Which coverage metric will provide the needed information for this analysis?
Correct Answer: D
Checking that at least 50% of decisions have been exercised by a test case suite is not a valid use of decision coverage, because it does not meet the minimum criterion of decision coverage, which is to exercise all possible outcomes of each decision in the software under test . Decision coverage is a technique that measures how much of the logic or branching of the software under test has been exercised by the test cases . The other options are valid uses of decision coverage. Option A is a valid use of decision coverage, because it can check that all decisions have been exercised in a single program . Option B is a valid use of decision coverage, because it can check that all decisions have been exercised in a business process . Option C is a valid use of decision coverage, because it can check that all calls from one program module to another have been made correctly .