<< Prev Question Next Question >>

Question 73/134

Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (134q)
Question 1: Which of the following statements are true for Erosion and S...
Question 2: For schools intended for grades eight and below (or ages 14 ...
Question 3: Which federal agency designates Federal Renewal Community si...
Question 4: Which principal areas must the LEED AP focus on to attain th...
Question 5: Where must a building's no-smoking signage be posted?...
Question 6: Sustainable Sites Credit, Site Assessment requires evaluatio...
Question 7: Short-term bicycle storage in Location and Transportation Cr...
Question 8: A project team is attempting Location and Transportation Cre...
Question 9: A project has a potable water source as well as two alternat...
Question 10: A LEED AP is evaluating whether Indoor Environmental Quality...
Question 11: The intent of the Sustainable Sites Prerequisite, Constructi...
Question 12: For Energy and Atmosphere Credit, Advanced Energy Metering, ...
Question 13: What is the first step to earn the Water Efficiency Credit, ...
Question 14: A project attempting to meet the preferred parking requireme...
Question 15: A project's massing and site orientation can have a direct i...
Question 16: A design team is pursuing Indoor Environmental Quality Credi...
Question 17: An owner has requested that the project team redesign a larg...
Question 18: A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 ...
Question 19: Which of the following actions should be taken to ensure tha...
Question 20: Which of the following is true regarding LEED Pilot Credits?...
Question 21: A project team has installed a rainwater harvesting system o...
Question 22: For Indoor Environmental Quality Credit, Construction Indoor...
Question 23: Every location in the U.S. identifies how many regional cred...
Question 24: What are the requirements of commercial projects for long-te...
Question 25: Which one of the following represents quality transit servic...
Question 26: According to the Integrative Process Credit, Integrative Pro...
Question 27: Water Efficiency Prerequisite, Outdoor Water Use Reduction, ...
Question 28: When a project team sustainably develops a project site, the...
Question 29: Which of the following should be analyzed when pursuing an I...
Question 30: What is a viable strategy for optimizing open space under Su...
Question 31: Which of these is a method to assess the regional context of...
Question 32: Which rating system is appropriate for a new mixed-use build...
Question 33: When considering the Indoor Environmental Quality Credit, Th...
Question 34: A building owner is considering the installation of a solar ...
Question 35: Which of the following strategies is allowed under Energy At...
Question 36: Which of the following would be most useful to a school proj...
Question 37: According to the Integrative Process Credit, Integrative Pro...
Question 38: The project team wants to modify the design of an office bui...
Question 39: A LEED Building Design and Construction: New Construction of...
Question 40: A topographic assessment of a project site located 150 ft. (...
Question 41: In the Indoor Environmental Quality Credit, Low-Emitting Mat...
Question 42: Green Infrastructure (GI) and Low-Impact Development (LID) r...
Question 43: The design team has specified products to achieve Materials ...
Question 44: Which of the following is the location of CO2 sensors in nat...
Question 45: A decorative overhead light fixture is specified for a proje...
Question 46: When planning a water-efficient landscape design, the design...
Question 47: For a task chair purchased for a healthcare facility, which ...
Question 48: What requirement must be met when creating a Demand Response...
Question 49: When preparing the Sustainable Sites Prerequisite, Construct...
Question 50: Which of the following documents detail the ideas, concepts,...
Question 51: For a bicycle network to demonstrate compliance with Locatio...
Question 52: A commercial office building with a footprint of 70,000 ft2 ...
Question 53: Several Materials and Resources credits give a bonus locatio...
Question 54: When calculating the reverberation time of a room, which of ...
Question 55: A project in a cold climate does not want a highly reflectiv...
Question 56: Which of the following items must have safe collection, stor...
Question 57: When measuring sound pressure levels in a classroom to deter...
Question 58: When the project occupancy is not known, which method is rec...
Question 59: What is the maximum number of points a project pursuing LEED...
Question 60: A comprehensive rainwater management plan may include design...
Question 61: The results of a building energy model show that a building ...
Question 62: A construction manager is looking for a project management t...
Question 63: Which of the following project types is required to consider...
Question 64: Qualifying spaces for the Sustainable Sites Credit, Places o...
Question 65: Which of the following is required to earn Energy and Atmosp...
Question 66: A building owner in an arid climate is trying to design an o...
Question 67: Which of the following transit modes is considered to be wal...
Question 68: A LEED Building Design and Construction project includes an ...
Question 69: Which of the following are control measures recommended by t...
Question 70: U.S. Green Building Council (USGBC)'s vision for using LEED ...
Question 71: A school project is located in a basin. Snow melts in the sp...
Question 72: A commercial new construction project consists of mixed spac...
Question 73: Which of the following project types is required to consider...
Question 74: During the early stages of a LEED for Schools project, the t...
Question 75: A project team develops a site plan for a school project wit...
Question 76: The LEED project has a main entrance and two service entranc...
Question 77: The Required Breathing Zone Outdoor Airflow Vbz for a new ba...
Question 78: Which of the following methods is the referenced standard fo...
Question 79: A facility manager cleaning highly reflective paving materia...
Question 80: A newly constructed school has installed solar thermal syste...
Question 81: Which of the following project team members should be integr...
Question 82: Under the Building Design and Construction rating systems, p...
Question 83: Which of the following statements is correct when defining t...
Question 84: What is the basis of energy consumption in determining the p...
Question 85: A Healthcare Project is constructing a new building adjacent...
Question 86: What aspects of each space should the LEED consultant consid...
Question 87: A design team pursuing LEED for a new office building projec...
Question 88: What is the minimum number of members of the integrated proj...
Question 89: For Location and Transportation Credit, Access to Quality Tr...
Question 90: A mixed-use development is located 1/2 mi. (0.80 km) from a ...
Question 91: A project is designed to remodel an existing warehouse into ...
Question 92: A project's total site area is 240,000 ft2 (22 297 m2) and t...
Question 93: The Solar Reflectance Index (SRI) includes the measure of a ...
Question 94: The owner of a large multi-building property is seeking LEED...
Question 95: Smoking is prohibited inside LEED-certified buildings in ord...
Question 96: Which rating system is being used if all of the credits belo...
Question 97: The use of lead, mercury, copper and cadmium should be limit...
Question 98: The material cost for a project is $100,000. What is the min...
Question 99: To achieve the Sustainable Sites Credit, Light Pollution Red...
Question 100: What credit rewards customers who change their normal consum...
Question 101: The owner has stated a desire to provide a variety of non-au...
Question 102: An office project has the following items in its break room ...
Question 103: Which of the following Sustainable Sites credits are eligibl...
Question 104: A project team compares a life-cycle assessment (LCA) model ...
Question 105: For Energy and Atmosphere Credit, Advanced Energy Metering, ...
Question 106: A new Science Education Center is pursuing LEED certificatio...
Question 107: The scope of analysis in Materials and Resources Credit, Bui...
Question 108: Which of the following strategies can be used to reduce the ...
Question 109: In the energy modeling of a building envelope, which of the ...
Question 110: What is the sequence of the process for LEED certification?...
Question 111: Discussing the project goals to help identify the credits an...
Question 112: What are the Storage and Collection of Recyclables requireme...
Question 113: When attempting Regional Priority Credit, what must be provi...
Question 114: Which of the following criteria does a project need to imple...
Question 115: Building Product Disclosure and Optimization is based on mar...
Question 116: The contractor has submitted waste hauling reports for revie...
Question 117: What is a benefit of including the public in a charrette for...
Question 118: A request to change the lighting fixtures in a conference ro...
Question 119: The required minimum scope of analysis for a product-specifi...
Question 120: In order to achieve Indoor Environmental Quality Credit, Qua...
Question 121: The maximum number of points for Water Efficiency Credit, Co...
Question 122: Which individual occupant lighting control meets the require...
Question 123: Showers are addressed under which prerequisites and/or credi...
Question 124: A tenant of a new office building will require 100 workstati...
Question 125: A project design team for an elementary school project is at...
Question 126: Which of the following characteristics are a requirement of ...
Question 127: Which of the following strategies can be used to decrease th...
Question 128: When working on a renovation project, asbestos containing ma...
Question 129: A LEED AP submitted a Preliminary Design and Construction re...
Question 130: Which of the following strategies would be considered an acc...
Question 131: Which group of chemicals emitted by some building materials ...
Question 132: In order to comply with Indoor Environmental Quality Credit,...
Question 133: What is the definition of the evapotranspiration rate?...
Question 134: Which system is eligible for the Energy and Atmosphere Credi...