Valid LEED-AP-BD-C Dumps shared by ExamDiscuss.com for Helping Passing LEED-AP-BD-C Exam! ExamDiscuss.com now offer the newest LEED-AP-BD-C exam dumps, the ExamDiscuss.com LEED-AP-BD-C exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com LEED-AP-BD-C dumps with Test Engine here:

Access LEED-AP-BD-C Dumps Premium Version
(339 Q&As Dumps, 35%OFF Special Discount Code: freecram)

Online Access Free LEED-AP-BD-C Exam Questions

Exam Code:LEED-AP-BD-C
Exam Name:LEED AP Building Design + Construction (LEED AP BD+C)
Certification Provider:USGBC
Free Question Number:134
Version:v2025-07-02
Rating:
# of views:155
# of Questions views:2476
Go To LEED-AP-BD-C Questions

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Other Version
401 viewsUSGBC.LEED-AP-BD-C.v2024-05-17.q106
485 viewsUSGBC.LEED-AP-BD-C.v2024-02-05.q40
Exam Question List
Question 1: Which of the following statements are true for Erosion and S...
Question 2: For schools intended for grades eight and below (or ages 14 ...
Question 3: Which federal agency designates Federal Renewal Community si...
Question 4: Which principal areas must the LEED AP focus on to attain th...
Question 5: Where must a building's no-smoking signage be posted?...
Question 6: Sustainable Sites Credit, Site Assessment requires evaluatio...
Question 7: Short-term bicycle storage in Location and Transportation Cr...
Question 8: A project team is attempting Location and Transportation Cre...
Question 9: A project has a potable water source as well as two alternat...
Question 10: A LEED AP is evaluating whether Indoor Environmental Quality...
Question 11: The intent of the Sustainable Sites Prerequisite, Constructi...
Question 12: For Energy and Atmosphere Credit, Advanced Energy Metering, ...
Question 13: What is the first step to earn the Water Efficiency Credit, ...
Question 14: A project attempting to meet the preferred parking requireme...
Question 15: A project's massing and site orientation can have a direct i...
Question 16: A design team is pursuing Indoor Environmental Quality Credi...
Question 17: An owner has requested that the project team redesign a larg...
Question 18: A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 ...
Question 19: Which of the following actions should be taken to ensure tha...
Question 20: Which of the following is true regarding LEED Pilot Credits?...
Question 21: A project team has installed a rainwater harvesting system o...
Question 22: For Indoor Environmental Quality Credit, Construction Indoor...
Question 23: Every location in the U.S. identifies how many regional cred...
Question 24: What are the requirements of commercial projects for long-te...
Question 25: Which one of the following represents quality transit servic...
Question 26: According to the Integrative Process Credit, Integrative Pro...
Question 27: Water Efficiency Prerequisite, Outdoor Water Use Reduction, ...
Question 28: When a project team sustainably develops a project site, the...
Question 29: Which of the following should be analyzed when pursuing an I...
Question 30: What is a viable strategy for optimizing open space under Su...
Question 31: Which of these is a method to assess the regional context of...
Question 32: Which rating system is appropriate for a new mixed-use build...
Question 33: When considering the Indoor Environmental Quality Credit, Th...
Question 34: A building owner is considering the installation of a solar ...
Question 35: Which of the following strategies is allowed under Energy At...
Question 36: Which of the following would be most useful to a school proj...
Question 37: According to the Integrative Process Credit, Integrative Pro...
Question 38: The project team wants to modify the design of an office bui...
Question 39: A LEED Building Design and Construction: New Construction of...
Question 40: A topographic assessment of a project site located 150 ft. (...
Question 41: In the Indoor Environmental Quality Credit, Low-Emitting Mat...
Question 42: Green Infrastructure (GI) and Low-Impact Development (LID) r...
Question 43: The design team has specified products to achieve Materials ...
Question 44: Which of the following is the location of CO2 sensors in nat...
Question 45: A decorative overhead light fixture is specified for a proje...
Question 46: When planning a water-efficient landscape design, the design...
Question 47: For a task chair purchased for a healthcare facility, which ...
Question 48: What requirement must be met when creating a Demand Response...
Question 49: When preparing the Sustainable Sites Prerequisite, Construct...
Question 50: Which of the following documents detail the ideas, concepts,...
Question 51: For a bicycle network to demonstrate compliance with Locatio...
Question 52: A commercial office building with a footprint of 70,000 ft2 ...
Question 53: Several Materials and Resources credits give a bonus locatio...
Question 54: When calculating the reverberation time of a room, which of ...
Question 55: A project in a cold climate does not want a highly reflectiv...
Question 56: Which of the following items must have safe collection, stor...
Question 57: When measuring sound pressure levels in a classroom to deter...
Question 58: When the project occupancy is not known, which method is rec...
Question 59: What is the maximum number of points a project pursuing LEED...
Question 60: A comprehensive rainwater management plan may include design...
Question 61: The results of a building energy model show that a building ...
Question 62: A construction manager is looking for a project management t...
Question 63: Which of the following project types is required to consider...
Question 64: Qualifying spaces for the Sustainable Sites Credit, Places o...
Question 65: Which of the following is required to earn Energy and Atmosp...
Question 66: A building owner in an arid climate is trying to design an o...
Question 67: Which of the following transit modes is considered to be wal...
Question 68: A LEED Building Design and Construction project includes an ...
Question 69: Which of the following are control measures recommended by t...
Question 70: U.S. Green Building Council (USGBC)'s vision for using LEED ...
Question 71: A school project is located in a basin. Snow melts in the sp...
Question 72: A commercial new construction project consists of mixed spac...
Question 73: Which of the following project types is required to consider...
Question 74: During the early stages of a LEED for Schools project, the t...
Question 75: A project team develops a site plan for a school project wit...
Question 76: The LEED project has a main entrance and two service entranc...
Question 77: The Required Breathing Zone Outdoor Airflow Vbz for a new ba...
Question 78: Which of the following methods is the referenced standard fo...
Question 79: A facility manager cleaning highly reflective paving materia...
Question 80: A newly constructed school has installed solar thermal syste...
Question 81: Which of the following project team members should be integr...
Question 82: Under the Building Design and Construction rating systems, p...
Question 83: Which of the following statements is correct when defining t...
Question 84: What is the basis of energy consumption in determining the p...
Question 85: A Healthcare Project is constructing a new building adjacent...
Question 86: What aspects of each space should the LEED consultant consid...
Question 87: A design team pursuing LEED for a new office building projec...
Question 88: What is the minimum number of members of the integrated proj...
Question 89: For Location and Transportation Credit, Access to Quality Tr...
Question 90: A mixed-use development is located 1/2 mi. (0.80 km) from a ...
Question 91: A project is designed to remodel an existing warehouse into ...
Question 92: A project's total site area is 240,000 ft2 (22 297 m2) and t...
Question 93: The Solar Reflectance Index (SRI) includes the measure of a ...
Question 94: The owner of a large multi-building property is seeking LEED...
Question 95: Smoking is prohibited inside LEED-certified buildings in ord...
Question 96: Which rating system is being used if all of the credits belo...
Question 97: The use of lead, mercury, copper and cadmium should be limit...
Question 98: The material cost for a project is $100,000. What is the min...
Question 99: To achieve the Sustainable Sites Credit, Light Pollution Red...
Question 100: What credit rewards customers who change their normal consum...
Question 101: The owner has stated a desire to provide a variety of non-au...
Question 102: An office project has the following items in its break room ...
Question 103: Which of the following Sustainable Sites credits are eligibl...
Question 104: A project team compares a life-cycle assessment (LCA) model ...
Question 105: For Energy and Atmosphere Credit, Advanced Energy Metering, ...
Question 106: A new Science Education Center is pursuing LEED certificatio...
Question 107: The scope of analysis in Materials and Resources Credit, Bui...
Question 108: Which of the following strategies can be used to reduce the ...
Question 109: In the energy modeling of a building envelope, which of the ...
Question 110: What is the sequence of the process for LEED certification?...
Question 111: Discussing the project goals to help identify the credits an...
Question 112: What are the Storage and Collection of Recyclables requireme...
Question 113: When attempting Regional Priority Credit, what must be provi...
Question 114: Which of the following criteria does a project need to imple...
Question 115: Building Product Disclosure and Optimization is based on mar...
Question 116: The contractor has submitted waste hauling reports for revie...
Question 117: What is a benefit of including the public in a charrette for...
Question 118: A request to change the lighting fixtures in a conference ro...
Question 119: The required minimum scope of analysis for a product-specifi...
Question 120: In order to achieve Indoor Environmental Quality Credit, Qua...
Question 121: The maximum number of points for Water Efficiency Credit, Co...
Question 122: Which individual occupant lighting control meets the require...
Question 123: Showers are addressed under which prerequisites and/or credi...
Question 124: A tenant of a new office building will require 100 workstati...
Question 125: A project design team for an elementary school project is at...
Question 126: Which of the following characteristics are a requirement of ...
Question 127: Which of the following strategies can be used to decrease th...
Question 128: When working on a renovation project, asbestos containing ma...
Question 129: A LEED AP submitted a Preliminary Design and Construction re...
Question 130: Which of the following strategies would be considered an acc...
Question 131: Which group of chemicals emitted by some building materials ...
Question 132: In order to comply with Indoor Environmental Quality Credit,...
Question 133: What is the definition of the evapotranspiration rate?...
Question 134: Which system is eligible for the Energy and Atmosphere Credi...