A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review. To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted. Key project information includes: Brewing and distilling will operate year-round. Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales. Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required. Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site. Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity. The Market area will feature local farm products and is not conditioned. Entire building will be fully sprinklered. Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm. Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings. Public water and sewer is not available at the Project Site. Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements. The following resources are available for your reference: Architectural Drawings, including plans, elevations, sections, and schedules Consultant Drawings, including structural, HVAC, power distribution, and plumbing PEMB Shop Drawings Design and Construction Schedule Specification Excerpts, showing relevant spec sections IBC and ADA Excerpts, showing relevant code and accessibility sections After reviewing the documents, the architect discovers a coordination issue in the corridor. The architect is preparing the project manual. What section should be included?
Correct Answer: C
Understanding the Context When preparing the Project Manual in the Project Development & Documentation (PDD) section of the ARE 5.0 exam, you need to determine which specification sections are essential based on project requirements and conditions. The Project Manual organizes administrative and technical specifications into divisions, each serving a specific purpose. In this case, because construction will occur while farming operations continue uninterrupted-and public water and sewer services are unavailable on site-temporary utilities (such as water, power, and possibly sanitation) are a critical component that must be clearly addressed in the Project Manual. These provisions ensure the contractor understands how to support construction without disrupting farm operations and without relying on permanent utilities. Why "015000 Temporary Utilities" is Required Section 01 50 00 - Temporary Utilities (often numbered 015000) is part of Division 01: General Requirements in the Project Manual. It specifies requirements for establishing and maintaining temporary utility services (like water, electric, lighting, heating, cooling, toilets) during construction. It helps ensure the design and construction team address logistical needs amid the distinctive site conditions-namely the absence of public utilities and the necessity of continuous farm operations. As noted in a design and construction manual resource: "Section 01 51 00 - Temporary Utilities. This section is generally included in all projects; however, it must be carefully written so as to be applicable to the specific project conditions." This directly supports inclusion of Temporary Utilities in the Project Manual for this project scenario. Why Other Options Are Not Appropriate * A. 006113 Performance and Payment BondThese forms pertain to contract security and bonding requirements, which would be located in Division 00 (Procurement and Contracting Requirements), not Division 01. The question focuses on which section should be included in the Project Manual being prepared at this phase; the key imperative here is the temporary utility needs, not bonds. * B. 012300 AlternatesAlternates allow multiple pricing options for different project scopes, but there is no indication that alternate options (e.g., alternate spaces or functions) are being used in this design. There's no mention of bidding alternates. * D. 019113 General Commissioning RequirementsCommissioning provisions (often related to MEP system verification and performance) would only be required if commissioning is part of the project deliverables. The project brief doesn't indicate commissioning deliverables-only that mechanical and electrical systems are supported by the PEMB, and the focus here is continuity of operations and utilities during construction, not commissioning.