<< Prev Question Next Question >>

Question 10/93

Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B.Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
This project is located within a walking distance of less than 656 ft. (200 m) from the riverfront park with a clear view of a river. Which feature does this location contribute towards?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (93q)
Question 1: Feature C07: Enhanced Health and Wellness Promotion requires...
Question 2: The WELL project administrator realizes that a project's spe...
Question 3: The guiding principle for promoting optimal circadian entrai...
Question 4: A client seeking WELL Certification would like to reduce wor...
Question 5: Which of the following Air features is a precondition that a...
Question 6: A WELL AP is advising a project team about the benefits and ...
Question 7: A well-being team in a commercial office building is interes...
Question 8: An open office has an overhead T8 Fluorescent lighting syste...
Question 9: A building operations staff and a WELL AP are developing a c...
Question 10: Please click on the Project Scenario B button to review the ...
Question 11: A WELL AP is advising a project in achieving Feature W06: Dr...
Question 12: The Brightside Company is pursuing WELL Certification under ...
Question 13: Which of the following ingredients is restricted in building...
Question 14: Which of the following chemicals can be added to the public ...
Question 15: The office manager has received several complaints that staf...
Question 16: According to Feature: T04 Individual Thermal Control, which ...
Question 17: A WELL project for a first recertification elects to be revi...
Question 18: A WELL AP offers design guidance to support active occupants...
Question 19: The design team for a new office building protect is trying ...
Question 20: The project's property management team is discussing ways to...
Question 21: To achieve Feature C04: Occupant Survey, Part 2: Administer ...
Question 22: A shopping center wants to comply with W08: Hygiene Support ...
Question 23: A design for a WELL building has a dry-bulb temperature and ...
Question 24: A WELL AP is monitoring the ongoing submission of documents ...
Question 25: A project's site previously housed a fuel station and an aut...
Question 26: A project administrator is preparing documentation for a pro...
Question 27: A food services company is trying to meet the health goals o...
Question 28: A design team is considering the WELL Building Standard to i...
Question 29: A project failed performance verification of the PM 2.5 thre...
Question 30: The Airside Organization's Human Resources department recent...
Question 31: For which parameters does the WELL Building Standard™ set p...
Question 32: The annual average particulate matter (PM2.5) outside of an ...
Question 33: A project's interior designer is designing a room that will ...
Question 34: There is evidence to suggest that environments with poor aco...
Question 35: A WELL AP is coordinating feature documentation from various...
Question 36: Which of the following hazardous materials have been restric...
Question 37: Occupants of a WELL Certified building are unfamiliar with W...
Question 38: Which of the following is an accurate list of the core param...
Question 39: A project team conducts a daylight simulation for an office ...
Question 40: Under which of the following circumstances must projects pro...
Question 41: In addition to Feature M02: Nature and Place, the installati...
Question 42: Which of the following is an effective measure for a new con...
Question 43: Studies indicate that the use of antibiotics in livestock an...
Question 44: A consultant on a WELL project is working with the design te...
Question 45: A WELL AP offers design guidance to support active occupants...
Question 46: A WELL AP is reviewing the color temperature of lights used ...
Question 47: A WELL AP is working on a renovation project in an existing ...
Question 48: The food service manager for a corporate headquarters office...
Question 49: Please click on the Project Scenario A button to review the ...
Question 50: The WELL Building Standard™ (WELL™) requires a project tea...
Question 51: According to Feature M02: Nature and Place, what is one way ...
Question 52: A team is seeking to satisfy Feature A01: Air Quality, Part ...
Question 53: A project team performed quarterly water testing and determi...
Question 54: Which of the following layouts would meet the requirements t...
Question 55: A project team tested their building water supply and found ...
Question 56: A new employee indicates to the human resources department o...
Question 57: A WELL AP analyzes the water quality results from on-site mo...
Question 58: Which of the following circumstances would best justify a pr...
Question 59: For an office building with 1,500 regular occupants and 500 ...
Question 60: What is a key factor in promoting proper hydration?...
Question 61: As a part of a new initiative of a hospital, the program lea...
Question 62: A project team 13 pursuing Feature A08 Air Quality Monitorin...
Question 63: At what stage are documents created that represent policies ...
Question 64: Which of the following hazardous materials is known to impai...
Question 65: Which of the following should a project team provide near th...
Question 66: The WELL AP notices mold and fungal growth on some indoor wa...
Question 67: The space layout plan of a Commercial project has been provi...
Question 68: A project in a defined WELL Portfolio achieved all 24 precon...
Question 69: What is the minimum number of responses required for a proje...
Question 70: indoor air tests for a project show high levels of carbon mo...
Question 71: Which of the following are short-term effects of poor indoor...
Question 72: Thermal Comfort is known to impact which of the following...
Question 73: The production of polychlorinated biphenyls (PCBs) has been ...
Question 74: An operations manager intends to support employees' well-bei...
Question 75: What is the value of performance verification in the certifi...
Question 76: Which of the following ergonomic design strategies would a p...
Question 77: Which of the following describes the effects of insufficient...
Question 78: Which of the following environmental cues is most important ...
Question 79: The intent of Feature X01: Material Restrictions is to reduc...
Question 80: What is the maximum number of points that projects registere...
Question 81: Which of the following strategies can be used to improve the...
Question 82: A WELL AP is reviewing a client's waste management plan for ...
Question 83: Please click on the Project Scenario A button to review the ...
Question 84: Based on the WELL Building Standard™, what is a possible co...
Question 85: A new retail pharmacy is designing a healthy entryway to ach...
Question 86: Which of the following techniques is used to remove pollutan...
Question 87: A WELL Certified space has a quiet room that can be utilized...
Question 88: A project successfully received both LEED and BREEAM certifi...
Question 89: A small family-run business owned by an accredited nutrition...
Question 90: The Project must provide which of the following pieces of in...
Question 91: A project registered under WELL Core Certification has a tot...
Question 92: Please click on the Project Scenario B button to review the ...
Question 93: A team is developing a health-oriented mission statement. Wh...