<< Prev Question Next Question >>

Question 49/93

Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx.
328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its employee benefits and organizational policies. As an example, they offer a 50% discount on several mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Which design element would need to be included to meet the requirements of Feature L05 Daylight Design Strategies. Part 2: Integrate Solar Shading?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (93q)
Question 1: Feature C07: Enhanced Health and Wellness Promotion requires...
Question 2: The WELL project administrator realizes that a project's spe...
Question 3: The guiding principle for promoting optimal circadian entrai...
Question 4: A client seeking WELL Certification would like to reduce wor...
Question 5: Which of the following Air features is a precondition that a...
Question 6: A WELL AP is advising a project team about the benefits and ...
Question 7: A well-being team in a commercial office building is interes...
Question 8: An open office has an overhead T8 Fluorescent lighting syste...
Question 9: A building operations staff and a WELL AP are developing a c...
Question 10: Please click on the Project Scenario B button to review the ...
Question 11: A WELL AP is advising a project in achieving Feature W06: Dr...
Question 12: The Brightside Company is pursuing WELL Certification under ...
Question 13: Which of the following ingredients is restricted in building...
Question 14: Which of the following chemicals can be added to the public ...
Question 15: The office manager has received several complaints that staf...
Question 16: According to Feature: T04 Individual Thermal Control, which ...
Question 17: A WELL project for a first recertification elects to be revi...
Question 18: A WELL AP offers design guidance to support active occupants...
Question 19: The design team for a new office building protect is trying ...
Question 20: The project's property management team is discussing ways to...
Question 21: To achieve Feature C04: Occupant Survey, Part 2: Administer ...
Question 22: A shopping center wants to comply with W08: Hygiene Support ...
Question 23: A design for a WELL building has a dry-bulb temperature and ...
Question 24: A WELL AP is monitoring the ongoing submission of documents ...
Question 25: A project's site previously housed a fuel station and an aut...
Question 26: A project administrator is preparing documentation for a pro...
Question 27: A food services company is trying to meet the health goals o...
Question 28: A design team is considering the WELL Building Standard to i...
Question 29: A project failed performance verification of the PM 2.5 thre...
Question 30: The Airside Organization's Human Resources department recent...
Question 31: For which parameters does the WELL Building Standard™ set p...
Question 32: The annual average particulate matter (PM2.5) outside of an ...
Question 33: A project's interior designer is designing a room that will ...
Question 34: There is evidence to suggest that environments with poor aco...
Question 35: A WELL AP is coordinating feature documentation from various...
Question 36: Which of the following hazardous materials have been restric...
Question 37: Occupants of a WELL Certified building are unfamiliar with W...
Question 38: Which of the following is an accurate list of the core param...
Question 39: A project team conducts a daylight simulation for an office ...
Question 40: Under which of the following circumstances must projects pro...
Question 41: In addition to Feature M02: Nature and Place, the installati...
Question 42: Which of the following is an effective measure for a new con...
Question 43: Studies indicate that the use of antibiotics in livestock an...
Question 44: A consultant on a WELL project is working with the design te...
Question 45: A WELL AP offers design guidance to support active occupants...
Question 46: A WELL AP is reviewing the color temperature of lights used ...
Question 47: A WELL AP is working on a renovation project in an existing ...
Question 48: The food service manager for a corporate headquarters office...
Question 49: Please click on the Project Scenario A button to review the ...
Question 50: The WELL Building Standard™ (WELL™) requires a project tea...
Question 51: According to Feature M02: Nature and Place, what is one way ...
Question 52: A team is seeking to satisfy Feature A01: Air Quality, Part ...
Question 53: A project team performed quarterly water testing and determi...
Question 54: Which of the following layouts would meet the requirements t...
Question 55: A project team tested their building water supply and found ...
Question 56: A new employee indicates to the human resources department o...
Question 57: A WELL AP analyzes the water quality results from on-site mo...
Question 58: Which of the following circumstances would best justify a pr...
Question 59: For an office building with 1,500 regular occupants and 500 ...
Question 60: What is a key factor in promoting proper hydration?...
Question 61: As a part of a new initiative of a hospital, the program lea...
Question 62: A project team 13 pursuing Feature A08 Air Quality Monitorin...
Question 63: At what stage are documents created that represent policies ...
Question 64: Which of the following hazardous materials is known to impai...
Question 65: Which of the following should a project team provide near th...
Question 66: The WELL AP notices mold and fungal growth on some indoor wa...
Question 67: The space layout plan of a Commercial project has been provi...
Question 68: A project in a defined WELL Portfolio achieved all 24 precon...
Question 69: What is the minimum number of responses required for a proje...
Question 70: indoor air tests for a project show high levels of carbon mo...
Question 71: Which of the following are short-term effects of poor indoor...
Question 72: Thermal Comfort is known to impact which of the following...
Question 73: The production of polychlorinated biphenyls (PCBs) has been ...
Question 74: An operations manager intends to support employees' well-bei...
Question 75: What is the value of performance verification in the certifi...
Question 76: Which of the following ergonomic design strategies would a p...
Question 77: Which of the following describes the effects of insufficient...
Question 78: Which of the following environmental cues is most important ...
Question 79: The intent of Feature X01: Material Restrictions is to reduc...
Question 80: What is the maximum number of points that projects registere...
Question 81: Which of the following strategies can be used to improve the...
Question 82: A WELL AP is reviewing a client's waste management plan for ...
Question 83: Please click on the Project Scenario A button to review the ...
Question 84: Based on the WELL Building Standard™, what is a possible co...
Question 85: A new retail pharmacy is designing a healthy entryway to ach...
Question 86: Which of the following techniques is used to remove pollutan...
Question 87: A WELL Certified space has a quiet room that can be utilized...
Question 88: A project successfully received both LEED and BREEAM certifi...
Question 89: A small family-run business owned by an accredited nutrition...
Question 90: The Project must provide which of the following pieces of in...
Question 91: A project registered under WELL Core Certification has a tot...
Question 92: Please click on the Project Scenario B button to review the ...
Question 93: A team is developing a health-oriented mission statement. Wh...