Valid C_TS422_2023 Dumps shared by ExamDiscuss.com for Helping Passing C_TS422_2023 Exam! ExamDiscuss.com now offer the newest C_TS422_2023 exam dumps, the ExamDiscuss.com C_TS422_2023 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com C_TS422_2023 dumps with Test Engine here:
which of the following automation options can you use for production orders? Note: There are 2 Correct answers to this question?
Correct Answer: A,C
You can use mass processing to set production orders to technically complete. Mass processing allows you to perform the same action for multiple production orders at once, such as changing the status, printing, or confirming. You can use the Set to Technically Complete action to close the production orders that are finished and do not require any further processing. This action updates the order status to TECO and prevents any further changes to the order12. You can use trigger points to automatically create rework orders via confirmation. Trigger points are predefined events that occur during the execution of a production order, such as reaching a certain operation or quantity. You can assign actions to trigger points, such as creating a notification, a rework order, or a quality inspection. For example, you can use a trigger point to automatically create a rework order for defective goods when you confirm an operation. The rework order is linked to the original order and inherits the relevant data from it3 . Reference: 1: SAP Help Portal: Mass Processing 2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 7: Process Orders 3: SAP Help Portal: Trigger Points 4: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 6: Production Orders