Valid C_TS414_2023 Dumps shared by ExamDiscuss.com for Helping Passing C_TS414_2023 Exam! ExamDiscuss.com now offer the newest C_TS414_2023 exam dumps, the ExamDiscuss.com C_TS414_2023 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com C_TS414_2023 dumps with Test Engine here:
You have configured the system so that inspection lots are created for delivery items automatically. What does the system do if no results for the inspection lot have been recorded, and you change the material quantity in the delivery item?
Correct Answer: A
For an existing inspection lot tied to a delivery item (e.g., inspection type 10) with no results recorded: * Change the Actual Lot Quantity of the Current Inspection Lot (A): If the delivery item quantity changes (VL02N), the system updates the inspection lot's quantity to match (status CRTD or INSP), as long as no results are recorded. This maintains synchronization without creating a new lot (SPRO > QM > Quality Inspection > Inspection Lot Creation > Define Inspection Lot Update). * Cancel and Create a New One (B): Cancellation and recreation occur only if the item is deleted, not just quantity-changed. * Create a New Inspection Lot (C): A new lot isn't created for a quantity change; the existing lot adjusts. * Block the Current Inspection Lot (D): Blocking isn't triggered by quantity changes in this scenario. Thus, "Change the actual lot quantity of the current inspection lot" is the correct answer.References: SAP Help Portal - "Inspection Lot Updates"; SAP S/4HANA QM User Guide - "Delivery Integration".