Valid C_TS414_2023 Dumps shared by ExamDiscuss.com for Helping Passing C_TS414_2023 Exam! ExamDiscuss.com now offer the newest C_TS414_2023 exam dumps, the ExamDiscuss.com C_TS414_2023 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com C_TS414_2023 dumps with Test Engine here:
Which of the following production-related events can trigger the creation of an inspection lot? Note: There are 2 correct answers to this question.
Correct Answer: A,D
In SAP S/4HANA QM, inspection lots for production (inspection lot origin 03 or 04) are triggered by specific events in the production process: * Production Order Release (A): Releasing a production order (transaction CO02, status REL) can create an inspection lot of origin 03 for in-process inspections if QM is active in the material master (inspection type 03) and the routing includes QM operations. This is a standard trigger in discrete manufacturing. * Goods Movements for Production Order (D): Goods receipt from a production order (e.g., transaction MIGO, movement type 101) triggers an inspection lot of origin 04 if inspection type 04 is active in the material master. This is common for post-production quality checks. * Production Order Creation (B): Creating an order (status CRTD) does not typically trigger an inspection lot; it requires release or goods movement to activate QM. * Available-to-Promise (ATP) Check (C): ATP checks availability in sales or production planning but is unrelated to QM inspection lot creation. Thus, "Production order release" and "Goods movements for production order" are the correct answers. References: SAP Help Portal - "Inspection Lot Origins 03 and 04"; SAP S/4HANA QM User Guide - "Production Integration".