<< Prev Question Next Question >>

Question 16/342

Which is a purpose of a Risk Register?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (342q)
Question 1: Which is a purpose of the Directing a Project process?...
Question 2: Which is a benefit of using PRINCE2?...
Question 3: What is established during the 'initiating a project' proces...
Question 4: Which statement applies to Stage Plans?...
Question 5: What must be produced to meet the minimum requirements when ...
Question 6: Which does NOT reflect the PRINCE2 principle of continued bu...
Question 7: Which should be provided by a project mandate?...
Question 8: What is used to identify any organization or interested part...
Question 9: Which is a typical core activity within configuration manage...
Question 10: Which of the following refers to the actions identified to b...
Question 11: Which is a purpose of the change theme?...
Question 12: What is the project manager role responsible for?...
Question 13: Where can people who join a project after initiation quickly...
Question 14: Identify the missing words in the following sentence. A bene...
Question 15: In which product does a Project Manager define the time and ...
Question 16: Which is a purpose of a Risk Register?...
Question 17: Identify the missing words in the following sentence. The ro...
Question 18: Which product is created in the 'starting up a project' proc...
Question 19: What needs to be in place to ensure effective issue and chan...
Question 20: According to PRINCE2, which characteristic is necessary for ...
Question 21: What action is taken as part of the 'controlling a stage' pr...
Question 22: Identify the missing words in the following sentence. A Proj...
Question 23: Which statement about stages is true?...
Question 24: Which role is responsible for the management of a risk assig...
Question 25: Which is a purpose of the Initiating a Project process?...
Question 26: Which is NOT an objective of the Controlling a Stage process...
Question 27: Identify the missing words in the following sentence. Projec...
Question 28: Where should the names of those who are to approve a product...
Question 29: Identify the missing words in the following sentence. A proj...
Question 30: Which is NOT a purpose of the Initiating a Project process?...
Question 31: Which step in the issue and change control procedure conside...
Question 32: Which statement about stages is true?...
1 commentQuestion 33: Where should decisions regarding the tailoring of the projec...
1 commentQuestion 34: Which is a minimum requirement for applying the change theme...
Question 35: Which theme provides all management levels within the projec...
Question 36: Identify the missing word in the following sentence. A proje...
Question 37: Which theme defines the accountability for realization of th...
Question 38: Which describes a characteristic of a project?...
Question 39: What is an advantage of dividing the project into stages?...
1 commentQuestion 40: What information about benefits management must be documente...
Question 41: From whom does a Team Manager obtain approval for a complete...
Question 42: Which are advantages of a clear end to a project? 1. No furt...
Question 43: In a commercial environment, which process links the team ma...
Question 44: Why is the 'initiating a project' process used?...
Question 45: Which is a purpose of the 'identify the risks' step within t...
Question 46: Which is part of quality control?...
Question 47: Which should be provided by a project mandate?...
Question 48: Which is a purpose of a lessons log?...
Question 49: Identify the missing word in the following sentence, A purpo...
1 commentQuestion 50: Which is an objective of the 'initiating a project' process?...
Question 51: Which is a benefit of using PRINCE2?...
1 commentQuestion 52: Which level of management sets the project level tolerances?...
Question 53: According to the 'defined roles and responsibilities' princi...
Question 54: Which statement about risks is FALSE?...
Question 55: Which process is triggered towards the end of the final stag...
Question 56: Which document should record the agreed amount of risk budge...
1 commentQuestion 57: Which process is used to define how baselines will be establ...
Question 58: Who represents the three project interests on a project?...
Question 59: Which statement about the quality review technique is FALSE?...
Question 60: When should the Project Board refer to corporate or programm...
Question 61: Identify the missing word(s) in the following sentence, PRIN...
Question 62: Which is an objective of the Directing a Project process?...
Question 63: Which is an objective of the Starting up a Project process?...
Question 64: Which is a purpose of the 'controlling a stage' process?...
Question 65: Why is the Initiating a Project process used?...
Question 66: Which are benefits of using PRINCE2? 1. It removes the need ...
Question 67: What product is used to maintain a record of those who have ...
Question 68: What theme provides all management levels within the project...
Question 69: If a project's benefit tolerance is forecast to be exceeded,...
Question 70: According to PRINCE2, which characteristic is necessary for ...
Question 71: Which is a benefit of using PRINCE2?...
Question 72: Which statement defines a risk?...
Question 73: Which product defines how the project board should approve t...
Question 74: Which does the Executive need to ensure is in place before t...
Question 75: Which is NOT a purpose of a Benefits Review Plan?...
Question 76: Which is one of the six aspects of project performance to be...
Question 77: Which of the following statements about customer's quality e...
Question 78: Which is a minimum requirement for applying the risk theme?...
Question 79: Which statement defines a risk?...
Question 80: Which describes a project benefit?...
Question 81: Which of the following is NOT an event-driven control?...
Question 82: What needs to be in place to ensure effective issue and chan...
Question 83: Which theme provides the controls to escalate any forecast b...
Question 84: Which is a task of product-based planning?...
Question 85: Why is the 'learn from experience' principle applied to a pr...
Question 86: Which role is responsible for appointing the senior user in ...
Question 87: Which process provides the Project Board with the informatio...
Question 88: Which is a purpose of the Controlling a Stage process?...
Question 89: What process provides the information required to decide whe...
Question 90: Identify the missing word(s) in the following sentence. Duri...
Question 91: Which describes risk probability?...
Question 92: Identify the missing word in the following sentence. [ ? ] i...
Question 93: Which is a benefit of applying the 'tailor to suit the proje...
Question 94: Which aspect of project performance must be managed to ensur...
Question 95: Which is a valid statement about the Project Support role?...
Question 96: Why is the 'learn from experience' principle applied to a pr...
Question 97: Which is a minimum requirement for applying the quality them...
Question 98: Which characteristic of a project reflects that there are di...
Question 99: Who is responsible for documenting any tailoring of the busi...
Question 100: Which may be funded from a risk budget?...
Question 101: Which is a type of issue?
Question 102: What is the definition of a project outcome?...
Question 103: Identify the missing words in the following sentence. A purp...
Question 104: What may be funded from a risk budget?...
Question 105: Which role is responsible for the quality of the specialist ...
Question 106: Which control must be used as a minimum requirement for appl...
Question 107: Identify the missing words in the following sentence. The ro...
Question 108: What theme provides the justification for the project?...
Question 109: Identify the missing product in the following sentence. When...
Question 110: Which is a purpose of the change theme?...
Question 111: Identify the missing words in the following sentence. A Chan...
Question 112: Which is assumed to be a customer's responsibility in the PR...
Question 113: How does the use of product descriptions support the 'focus ...
Question 114: What needs to be in place to ensure effective issue and chan...
Question 115: In what product should the quality criteria for a specialist...
Question 116: Which is a recommended quality review team role?...
Question 117: According to the 'defined roles and responsibilities' princi...
Question 118: In a commercial environment, which process links the team ma...
Question 119: Which is a typical core activity within configuration manage...
Question 120: Who carries out audits that are independent of the project?...
Question 121: Which is a purpose of the Risk theme?...
Question 122: Which are purposes of the quality theme? 1. To implement con...
Question 123: Which is the first task of PRINCE2's recommended approach to...
Question 124: Which product identifies how often stakeholders require info...
Question 125: What product records any time tolerances agreed between the ...
Question 126: Identify the missing words in the following sentence. A purp...
Question 127: Who is responsible for documenting any tailoring of the busi...
Question 128: Which product is NOT created in the Managing a Stage Boundar...
Question 129: In which product does a Project Manager define the time and ...
Question 130: Which is part of the PRINCE2 definition of a project?...
Question 131: Which is a minimum requirement for applying the quality them...
Question 132: Which is NOT a true statement about the Managing a Stage Bou...
Question 133: Which is a true statement about management stages and techni...
Question 134: Which is an objective of the Directing a Project process?...
Question 135: Which describes the 'Identify Risks' step within the recomme...
Question 136: If an informal issue is defined as a problem or concern, whe...
Question 137: Where should a Team Manager look for information on the qual...
Question 138: Which regular report provides the Project Board with a summa...
Question 139: Which is an objective of the Managing Product Delivery proce...
Question 140: Which product summarizes progress and is used to decide whet...
Question 141: Which is a responsibility of a risk owner?...
Question 142: Identify the missing words in the following sentence. The ro...
Question 143: Which is a minimum requirement for applying the change theme...
Question 144: Which is assumed to be a customer's responsibility in the PR...
Question 145: Which activity takes place within the Managing a Stage Bound...
Question 146: Which is a purpose of the Plans theme?...
Question 147: Which is a purpose of the 'initiating a project' process?...
Question 148: What should be considered when defining the number of manage...
Question 149: How does the project board use the 'manage by stages' princi...
Question 150: Identify the missing words in the following sentence. A purp...
Question 151: How does the 'managing product delivery' process achieve its...
Question 152: Identify the missing word in the following sentence. The gui...
Question 153: Who should use the information in a Lessons Report to refine...
Question 154: Which is a purpose of the plans theme?...
Question 155: Which statement defines a risk?...
Question 156: How does the project plan help to support the 'manage by sta...
Question 157: Which product describes the roles and responsibilities for a...
Question 158: Which is a purpose of the Quality theme?...
Question 159: Which are reasons for a benefits management approach? 1. To ...
Question 160: Which process is used to define how baselines will be establ...
Question 161: Which is a minimum requirement for applying the quality them...
Question 162: From whom does a Team Manager obtain approval for a complete...
Question 163: Which is a purpose of an Issue Report?...
Question 164: Which is a type of issue?
Question 165: What is the result of the change derived from using the proj...
Question 166: Which is a purpose of the Controlling a Stage process?...
Question 167: What theme provides the justification for the project?...
Question 168: Which is a purpose of the plans theme?...
Question 169: Identify the missing word in the following sentence. The PRI...
Question 170: How many tasks does the product-based planning technique des...
Question 171: What must be produced to meet the minimum requirements when ...
Question 172: How is the tailoring approach defined for a project?...
Question 173: Which is a purpose of the Controlling a Stage process?...
Question 174: Which is an objective of the 'initiating a project' process?...
Question 175: Which risk response type is appropriate to respond to an opp...
Question 176: Identify the missing words in the following sentence. The 'd...
Question 177: Who should act as the communication channel between a projec...
Question 178: Identify the missing words in the following sentence. The ro...
Question 179: How many management stages should a PRINCE2 project consist ...
Question 180: Whose approval is needed to replace a Stage Plan with an Exc...
Question 181: Which is an assumption about the PRINCE2 customer/supplier e...
Question 182: Which is a purpose of a project brief?...
Question 183: Which is a purpose of a Risk Register?...
Question 184: Which process is used to define how baselines will be establ...
Question 185: What may be funded from a risk budget?...
Question 186: Which product documents the information needed to demonstrat...
Question 187: Identify the missing word in the following sentence. The gui...
Question 188: Identify the missing words in the following sentence. A proj...
Question 189: How many tasks does the product-based planning technique des...
Question 190: Which are benefits of using PRINCE2? 1. It removes the need ...
Question 191: Which is a purpose of the quality theme?...
Question 192: Which is shown in a product breakdown structure?...
Question 193: What is an advantage of dividing the project into stages?...
Question 194: Which is a type of issue?
Question 195: Which is a purpose of the Starting up a Project process?...
Question 196: Which statements about quality assurance and project assuran...
Question 197: Which is a benefit of applying the 'tailor to suit the proje...
Question 198: Which statement about time-driven controls is CORRECT?...
Question 199: Which characteristic distinguishes a project from regular bu...
Question 200: Which is a purpose of the plans theme?...
Question 201: Identify the missing words in the following sentence. The 'm...
Question 202: Which is a purpose of the 'closing a project' process?...
Question 203: Identify the missing words in the following sentence. When p...
Question 204: Which is an objective of the 'directing a project' process?...
Question 205: Which is one of the three levels of plan in PRINCE2?...
Question 206: Which is an objective of the Initiating a Project process?...
Question 207: What is described as an organization's unique attitude towar...
Question 208: Which is a minimum requirement for applying the quality them...
Question 209: Which describes risk probability?...
Question 210: How does the use of product descriptions support the 'focus ...
Question 211: Which is a purpose of an End Project Report?...
Question 212: Which is a purpose of a project brief?...
Question 213: According to the 'continued business justification' principl...
Question 214: Which process is triggered towards the end of the final stag...
Question 215: Which of the following statements about quality assurance an...
Question 216: Which of the following is NOT part of quality planning?...
Question 217: Which is a true statement about time-driven controls?...
Question 218: Which step in the issue and change control procedure conside...
Question 219: Which is a minimum requirement for applying the change theme...
Question 220: Which is a purpose of a Configuration Management Strategy?...
Question 221: Which is a purpose of a Project Product Description?...
Question 222: Why is a Project Brief produced?...
Question 223: Why would the Project Manager escalate an issue to the Proje...
Question 224: Which is a responsibility of the managing level within the p...
Question 225: What theme provides all management levels within the project...
Question 226: Which is a minimum requirement for applying the organization...
Question 227: If the Project Board instructs the Project Manager to implem...
Question 228: Which approach must be followed as a minimum requirement for...
Question 229: Which of the following can be done to control the size of th...
Question 230: What product is used to maintain a record of those who have ...
Question 231: Which statement about applying the 'tailor to suit the proje...
Question 232: Identify the missing word in the following sentence. The pur...
Question 233: Which is one of the three levels of plan in PRINCE2?...
Question 234: Why is the Initiating a Project process used?...
Question 235: Which is a true statement about time-driven controls?...
Question 236: Which is a purpose of a project brief?...
Question 237: When considering how long the project stages should be, whic...
Question 238: Why is it crucial that the Project Product Description clear...
Question 239: Why does PRINCE2 recommend three different levels of plans?...
Question 240: Which is an objective of the 'starting up a project' process...
Question 241: Which does the Executive need to ensure is in place before t...
Question 242: Which is NOT considered when defining risk tolerance?...
Question 243: Which is a typical core activity within configuration manage...
Question 244: What product would enable the Project Manager to review how ...
Question 245: Which is part of quality control?...
Question 246: During the Managing a Stage Boundary process, what is review...
Question 247: Which is a minimum requirement for applying the organization...
Question 248: Which role represents the stakeholders who will operate the ...
Question 249: Which is an objective of the Managing Product Delivery proce...
Question 250: Which describes risk impact?
Question 251: If a project is part of a programme, which 'starting up a pr...
Question 252: Which approach must be followed as a minimum requirement for...
Question 253: When should the level of tailoring be defined?...
Question 254: Identify the missing word(s) in the following sentence. The ...
Question 255: Which process ensures focus on the delivery of a stage's pro...
Question 256: What is a supplier of a PRINCE2 project responsible for?...
Question 257: Which PRINCE2 principle helps to address a concern that the ...
Question 258: Which may be funded from a risk budget?...
Question 259: Which should be funded by a change budget?...
Question 260: Which is NOT obtained from a product's Product Description?...
Question 261: Identify the missing words in the following sentence. A prob...
Question 262: What should influence the Project Board's decision whether t...
Question 263: Which provides a single source of reference that may be used...
Question 264: Which is a purpose of a Risk Register?...
Question 265: Which is an objective of the 'managing a product delivery' p...
Question 266: Which PRINCE2 integrated element includes the good practices...
Question 267: During the 'initiating a project' process, who specifies the...
Question 268: Identify the missing words in the following sentence. A risk...
Question 269: Which describes a risk effect?
Question 270: What plan is created, and submitted for approval, during the...
Question 271: Identify the missing words in the following sentence. When p...
Question 272: What should the 'managing product delivery' process ensure? ...
Question 273: Which theme verifies that a project's products are fit for p...
Question 274: Identify the missing word(s) in the following sentence, PRIN...
Question 275: Which of the following statements about the Closing a Projec...
Question 276: Which should be funded by a change budget?...
Question 277: Which should be used to document any uncompleted work that n...
Question 278: Identify the missing word in the following sentence. A proje...
Question 279: Which process is used to define how baselines will be establ...
Question 280: How does the 'managing product delivery' process ensure that...
Question 281: Identify the missing words in the following sentence. The pr...
Question 282: Which is NOT a purpose of the Initiating a Project process?...
Question 283: Which is a purpose of an End Stage Report?...
Question 284: Which PRINCE2 principle is supported by the setting of toler...
Question 285: When tailoring PRINCE2 to suit the project, [?] may be chang...
Question 286: Which is a recommended quality review team role?...
Question 287: Which is a purpose of a quality register?...
Question 288: Which are advantages of a clear end to a project? 1. No furt...
Question 289: Which is a minimum requirement for applying the change theme...
Question 290: Which should be funded from a change budget?...
Question 291: Which is a purpose of the Risk theme?...
Question 292: Which is NOT one of the PRINCE2 integrated elements?...
Question 293: Which is created during the Starting up a Project process?...
Question 294: Which activity takes place within the Managing a Stage Bound...
Question 295: Which describes risk probability?...
Question 296: What information should be recorded in the quality register?...
Question 297: Which risk response type is appropriate to respond to an opp...
Question 298: Which is a purpose of a Project Brief?...
Question 299: What do acceptance criteria identify?...
Question 300: Which is an objective of the Starting up a Project process?...
Question 301: Which is NOT represented by one of the three primary categor...
Question 302: What is the first task of product-based planning?...
Question 303: Which product records any project outcomes perceived as nega...
Question 304: Which statement is CORRECT about the customer and suppliers ...
Question 305: Why can PRINCE2 be applied to any type of project?...
Question 306: Identify the missing words in the following sentence. The si...
Question 307: Which are advantages of a clear end to a project? 1. No furt...
Question 308: Who should use the information in a Lessons Report to refine...
Question 309: Which is the Change Authority role permitted to authorize?...
Question 310: Which does the Executive need to ensure is in place before t...
Question 311: What is performed as part of the recommended risk management...
Question 312: Which document should record the agreed amount of risk budge...
Question 313: Which describes an off-specification?...
Question 314: What is a purpose of a Benefits Review Plan?...
Question 315: When should the Project Board refer to corporate or programm...
Question 316: Which should be funded by a change budget?...
Question 317: Which theme verifies that a project's products are fit for p...
Question 318: Which is a benefit of using PRINCE2?...
Question 319: Which is a typical core activity within configuration manage...
Question 320: Which is a purpose of quality planning?...
Question 321: When considering how long the project stages should be, whic...
Question 322: Which task is performed by the Change Authority?...
Question 323: Who should use the information in a Lessons Report to refine...
Question 324: Which process provides information for the project board to ...
Question 325: Which theme addresses the need to have a strategy for commun...
Question 326: Identify the missing words in the following sentence. An obj...
Question 327: Which of the following take place before the initiation of a...
Question 328: Which describes risk appetite?
Question 329: Which is a purpose of the plans theme?...
Question 330: Which product defines how the project board should approve t...
Question 331: Which is a purpose of the Directing a Project process?...
Question 332: What is the first task of product-based planning?...
Question 333: What process aims to ensure accurate progress information is...
Question 334: Identify the missing word in the following sentence. A membe...
Question 335: Who represents the three project interests on a project?...
Question 336: Which risk response type is appropriate to respond to an opp...
Question 337: Which is a step in the recommended approach to 'defining and...
Question 338: Which is a purpose of the 'controlling a stage' process?...
Question 339: Which process provides information for the project board to ...
Question 340: Which should be funded from a change budget?...
Question 341: Which is a purpose of the business case theme?...
Question 342: Which is a task of product-based planning?...