<< Prev Question Next Question >>

Question 122/342

Which are purposes of the quality theme?
1. To implement continuous improvement during the project
2. To establish how the project will ensure that products created will be acceptable to key stakeholders
3. To ensure that the project is desirable and achievable
4. To identify, assess and control uncertainty

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (342q)
Question 1: Which is a purpose of the Directing a Project process?...
Question 2: Which is a benefit of using PRINCE2?...
Question 3: What is established during the 'initiating a project' proces...
Question 4: Which statement applies to Stage Plans?...
Question 5: What must be produced to meet the minimum requirements when ...
Question 6: Which does NOT reflect the PRINCE2 principle of continued bu...
Question 7: Which should be provided by a project mandate?...
Question 8: What is used to identify any organization or interested part...
Question 9: Which is a typical core activity within configuration manage...
Question 10: Which of the following refers to the actions identified to b...
Question 11: Which is a purpose of the change theme?...
Question 12: What is the project manager role responsible for?...
Question 13: Where can people who join a project after initiation quickly...
Question 14: Identify the missing words in the following sentence. A bene...
Question 15: In which product does a Project Manager define the time and ...
Question 16: Which is a purpose of a Risk Register?...
Question 17: Identify the missing words in the following sentence. The ro...
Question 18: Which product is created in the 'starting up a project' proc...
Question 19: What needs to be in place to ensure effective issue and chan...
Question 20: According to PRINCE2, which characteristic is necessary for ...
Question 21: What action is taken as part of the 'controlling a stage' pr...
Question 22: Identify the missing words in the following sentence. A Proj...
Question 23: Which statement about stages is true?...
Question 24: Which role is responsible for the management of a risk assig...
Question 25: Which is a purpose of the Initiating a Project process?...
Question 26: Which is NOT an objective of the Controlling a Stage process...
Question 27: Identify the missing words in the following sentence. Projec...
Question 28: Where should the names of those who are to approve a product...
Question 29: Identify the missing words in the following sentence. A proj...
Question 30: Which is NOT a purpose of the Initiating a Project process?...
Question 31: Which step in the issue and change control procedure conside...
Question 32: Which statement about stages is true?...
1 commentQuestion 33: Where should decisions regarding the tailoring of the projec...
1 commentQuestion 34: Which is a minimum requirement for applying the change theme...
Question 35: Which theme provides all management levels within the projec...
Question 36: Identify the missing word in the following sentence. A proje...
Question 37: Which theme defines the accountability for realization of th...
Question 38: Which describes a characteristic of a project?...
Question 39: What is an advantage of dividing the project into stages?...
1 commentQuestion 40: What information about benefits management must be documente...
Question 41: From whom does a Team Manager obtain approval for a complete...
Question 42: Which are advantages of a clear end to a project? 1. No furt...
Question 43: In a commercial environment, which process links the team ma...
Question 44: Why is the 'initiating a project' process used?...
Question 45: Which is a purpose of the 'identify the risks' step within t...
Question 46: Which is part of quality control?...
Question 47: Which should be provided by a project mandate?...
Question 48: Which is a purpose of a lessons log?...
Question 49: Identify the missing word in the following sentence, A purpo...
1 commentQuestion 50: Which is an objective of the 'initiating a project' process?...
Question 51: Which is a benefit of using PRINCE2?...
1 commentQuestion 52: Which level of management sets the project level tolerances?...
Question 53: According to the 'defined roles and responsibilities' princi...
Question 54: Which statement about risks is FALSE?...
Question 55: Which process is triggered towards the end of the final stag...
Question 56: Which document should record the agreed amount of risk budge...
1 commentQuestion 57: Which process is used to define how baselines will be establ...
Question 58: Who represents the three project interests on a project?...
Question 59: Which statement about the quality review technique is FALSE?...
Question 60: When should the Project Board refer to corporate or programm...
Question 61: Identify the missing word(s) in the following sentence, PRIN...
Question 62: Which is an objective of the Directing a Project process?...
Question 63: Which is an objective of the Starting up a Project process?...
Question 64: Which is a purpose of the 'controlling a stage' process?...
Question 65: Why is the Initiating a Project process used?...
Question 66: Which are benefits of using PRINCE2? 1. It removes the need ...
Question 67: What product is used to maintain a record of those who have ...
Question 68: What theme provides all management levels within the project...
Question 69: If a project's benefit tolerance is forecast to be exceeded,...
Question 70: According to PRINCE2, which characteristic is necessary for ...
Question 71: Which is a benefit of using PRINCE2?...
Question 72: Which statement defines a risk?...
Question 73: Which product defines how the project board should approve t...
Question 74: Which does the Executive need to ensure is in place before t...
Question 75: Which is NOT a purpose of a Benefits Review Plan?...
Question 76: Which is one of the six aspects of project performance to be...
Question 77: Which of the following statements about customer's quality e...
Question 78: Which is a minimum requirement for applying the risk theme?...
Question 79: Which statement defines a risk?...
Question 80: Which describes a project benefit?...
Question 81: Which of the following is NOT an event-driven control?...
Question 82: What needs to be in place to ensure effective issue and chan...
Question 83: Which theme provides the controls to escalate any forecast b...
Question 84: Which is a task of product-based planning?...
Question 85: Why is the 'learn from experience' principle applied to a pr...
Question 86: Which role is responsible for appointing the senior user in ...
Question 87: Which process provides the Project Board with the informatio...
Question 88: Which is a purpose of the Controlling a Stage process?...
Question 89: What process provides the information required to decide whe...
Question 90: Identify the missing word(s) in the following sentence. Duri...
Question 91: Which describes risk probability?...
Question 92: Identify the missing word in the following sentence. [ ? ] i...
Question 93: Which is a benefit of applying the 'tailor to suit the proje...
Question 94: Which aspect of project performance must be managed to ensur...
Question 95: Which is a valid statement about the Project Support role?...
Question 96: Why is the 'learn from experience' principle applied to a pr...
Question 97: Which is a minimum requirement for applying the quality them...
Question 98: Which characteristic of a project reflects that there are di...
Question 99: Who is responsible for documenting any tailoring of the busi...
Question 100: Which may be funded from a risk budget?...
Question 101: Which is a type of issue?
Question 102: What is the definition of a project outcome?...
Question 103: Identify the missing words in the following sentence. A purp...
Question 104: What may be funded from a risk budget?...
Question 105: Which role is responsible for the quality of the specialist ...
Question 106: Which control must be used as a minimum requirement for appl...
Question 107: Identify the missing words in the following sentence. The ro...
Question 108: What theme provides the justification for the project?...
Question 109: Identify the missing product in the following sentence. When...
Question 110: Which is a purpose of the change theme?...
Question 111: Identify the missing words in the following sentence. A Chan...
Question 112: Which is assumed to be a customer's responsibility in the PR...
Question 113: How does the use of product descriptions support the 'focus ...
Question 114: What needs to be in place to ensure effective issue and chan...
Question 115: In what product should the quality criteria for a specialist...
Question 116: Which is a recommended quality review team role?...
Question 117: According to the 'defined roles and responsibilities' princi...
Question 118: In a commercial environment, which process links the team ma...
Question 119: Which is a typical core activity within configuration manage...
Question 120: Who carries out audits that are independent of the project?...
Question 121: Which is a purpose of the Risk theme?...
Question 122: Which are purposes of the quality theme? 1. To implement con...
Question 123: Which is the first task of PRINCE2's recommended approach to...
Question 124: Which product identifies how often stakeholders require info...
Question 125: What product records any time tolerances agreed between the ...
Question 126: Identify the missing words in the following sentence. A purp...
Question 127: Who is responsible for documenting any tailoring of the busi...
Question 128: Which product is NOT created in the Managing a Stage Boundar...
Question 129: In which product does a Project Manager define the time and ...
Question 130: Which is part of the PRINCE2 definition of a project?...
Question 131: Which is a minimum requirement for applying the quality them...
Question 132: Which is NOT a true statement about the Managing a Stage Bou...
Question 133: Which is a true statement about management stages and techni...
Question 134: Which is an objective of the Directing a Project process?...
Question 135: Which describes the 'Identify Risks' step within the recomme...
Question 136: If an informal issue is defined as a problem or concern, whe...
Question 137: Where should a Team Manager look for information on the qual...
Question 138: Which regular report provides the Project Board with a summa...
Question 139: Which is an objective of the Managing Product Delivery proce...
Question 140: Which product summarizes progress and is used to decide whet...
Question 141: Which is a responsibility of a risk owner?...
Question 142: Identify the missing words in the following sentence. The ro...
Question 143: Which is a minimum requirement for applying the change theme...
Question 144: Which is assumed to be a customer's responsibility in the PR...
Question 145: Which activity takes place within the Managing a Stage Bound...
Question 146: Which is a purpose of the Plans theme?...
Question 147: Which is a purpose of the 'initiating a project' process?...
Question 148: What should be considered when defining the number of manage...
Question 149: How does the project board use the 'manage by stages' princi...
Question 150: Identify the missing words in the following sentence. A purp...
Question 151: How does the 'managing product delivery' process achieve its...
Question 152: Identify the missing word in the following sentence. The gui...
Question 153: Who should use the information in a Lessons Report to refine...
Question 154: Which is a purpose of the plans theme?...
Question 155: Which statement defines a risk?...
Question 156: How does the project plan help to support the 'manage by sta...
Question 157: Which product describes the roles and responsibilities for a...
Question 158: Which is a purpose of the Quality theme?...
Question 159: Which are reasons for a benefits management approach? 1. To ...
Question 160: Which process is used to define how baselines will be establ...
Question 161: Which is a minimum requirement for applying the quality them...
Question 162: From whom does a Team Manager obtain approval for a complete...
Question 163: Which is a purpose of an Issue Report?...
Question 164: Which is a type of issue?
Question 165: What is the result of the change derived from using the proj...
Question 166: Which is a purpose of the Controlling a Stage process?...
Question 167: What theme provides the justification for the project?...
Question 168: Which is a purpose of the plans theme?...
Question 169: Identify the missing word in the following sentence. The PRI...
Question 170: How many tasks does the product-based planning technique des...
Question 171: What must be produced to meet the minimum requirements when ...
Question 172: How is the tailoring approach defined for a project?...
Question 173: Which is a purpose of the Controlling a Stage process?...
Question 174: Which is an objective of the 'initiating a project' process?...
Question 175: Which risk response type is appropriate to respond to an opp...
Question 176: Identify the missing words in the following sentence. The 'd...
Question 177: Who should act as the communication channel between a projec...
Question 178: Identify the missing words in the following sentence. The ro...
Question 179: How many management stages should a PRINCE2 project consist ...
Question 180: Whose approval is needed to replace a Stage Plan with an Exc...
Question 181: Which is an assumption about the PRINCE2 customer/supplier e...
Question 182: Which is a purpose of a project brief?...
Question 183: Which is a purpose of a Risk Register?...
Question 184: Which process is used to define how baselines will be establ...
Question 185: What may be funded from a risk budget?...
Question 186: Which product documents the information needed to demonstrat...
Question 187: Identify the missing word in the following sentence. The gui...
Question 188: Identify the missing words in the following sentence. A proj...
Question 189: How many tasks does the product-based planning technique des...
Question 190: Which are benefits of using PRINCE2? 1. It removes the need ...
Question 191: Which is a purpose of the quality theme?...
Question 192: Which is shown in a product breakdown structure?...
Question 193: What is an advantage of dividing the project into stages?...
Question 194: Which is a type of issue?
Question 195: Which is a purpose of the Starting up a Project process?...
Question 196: Which statements about quality assurance and project assuran...
Question 197: Which is a benefit of applying the 'tailor to suit the proje...
Question 198: Which statement about time-driven controls is CORRECT?...
Question 199: Which characteristic distinguishes a project from regular bu...
Question 200: Which is a purpose of the plans theme?...
Question 201: Identify the missing words in the following sentence. The 'm...
Question 202: Which is a purpose of the 'closing a project' process?...
Question 203: Identify the missing words in the following sentence. When p...
Question 204: Which is an objective of the 'directing a project' process?...
Question 205: Which is one of the three levels of plan in PRINCE2?...
Question 206: Which is an objective of the Initiating a Project process?...
Question 207: What is described as an organization's unique attitude towar...
Question 208: Which is a minimum requirement for applying the quality them...
Question 209: Which describes risk probability?...
Question 210: How does the use of product descriptions support the 'focus ...
Question 211: Which is a purpose of an End Project Report?...
Question 212: Which is a purpose of a project brief?...
Question 213: According to the 'continued business justification' principl...
Question 214: Which process is triggered towards the end of the final stag...
Question 215: Which of the following statements about quality assurance an...
Question 216: Which of the following is NOT part of quality planning?...
Question 217: Which is a true statement about time-driven controls?...
Question 218: Which step in the issue and change control procedure conside...
Question 219: Which is a minimum requirement for applying the change theme...
Question 220: Which is a purpose of a Configuration Management Strategy?...
Question 221: Which is a purpose of a Project Product Description?...
Question 222: Why is a Project Brief produced?...
Question 223: Why would the Project Manager escalate an issue to the Proje...
Question 224: Which is a responsibility of the managing level within the p...
Question 225: What theme provides all management levels within the project...
Question 226: Which is a minimum requirement for applying the organization...
Question 227: If the Project Board instructs the Project Manager to implem...
Question 228: Which approach must be followed as a minimum requirement for...
Question 229: Which of the following can be done to control the size of th...
Question 230: What product is used to maintain a record of those who have ...
Question 231: Which statement about applying the 'tailor to suit the proje...
Question 232: Identify the missing word in the following sentence. The pur...
Question 233: Which is one of the three levels of plan in PRINCE2?...
Question 234: Why is the Initiating a Project process used?...
Question 235: Which is a true statement about time-driven controls?...
Question 236: Which is a purpose of a project brief?...
Question 237: When considering how long the project stages should be, whic...
Question 238: Why is it crucial that the Project Product Description clear...
Question 239: Why does PRINCE2 recommend three different levels of plans?...
Question 240: Which is an objective of the 'starting up a project' process...
Question 241: Which does the Executive need to ensure is in place before t...
Question 242: Which is NOT considered when defining risk tolerance?...
Question 243: Which is a typical core activity within configuration manage...
Question 244: What product would enable the Project Manager to review how ...
Question 245: Which is part of quality control?...
Question 246: During the Managing a Stage Boundary process, what is review...
Question 247: Which is a minimum requirement for applying the organization...
Question 248: Which role represents the stakeholders who will operate the ...
Question 249: Which is an objective of the Managing Product Delivery proce...
Question 250: Which describes risk impact?
Question 251: If a project is part of a programme, which 'starting up a pr...
Question 252: Which approach must be followed as a minimum requirement for...
Question 253: When should the level of tailoring be defined?...
Question 254: Identify the missing word(s) in the following sentence. The ...
Question 255: Which process ensures focus on the delivery of a stage's pro...
Question 256: What is a supplier of a PRINCE2 project responsible for?...
Question 257: Which PRINCE2 principle helps to address a concern that the ...
Question 258: Which may be funded from a risk budget?...
Question 259: Which should be funded by a change budget?...
Question 260: Which is NOT obtained from a product's Product Description?...
Question 261: Identify the missing words in the following sentence. A prob...
Question 262: What should influence the Project Board's decision whether t...
Question 263: Which provides a single source of reference that may be used...
Question 264: Which is a purpose of a Risk Register?...
Question 265: Which is an objective of the 'managing a product delivery' p...
Question 266: Which PRINCE2 integrated element includes the good practices...
Question 267: During the 'initiating a project' process, who specifies the...
Question 268: Identify the missing words in the following sentence. A risk...
Question 269: Which describes a risk effect?
Question 270: What plan is created, and submitted for approval, during the...
Question 271: Identify the missing words in the following sentence. When p...
Question 272: What should the 'managing product delivery' process ensure? ...
Question 273: Which theme verifies that a project's products are fit for p...
Question 274: Identify the missing word(s) in the following sentence, PRIN...
Question 275: Which of the following statements about the Closing a Projec...
Question 276: Which should be funded by a change budget?...
Question 277: Which should be used to document any uncompleted work that n...
Question 278: Identify the missing word in the following sentence. A proje...
Question 279: Which process is used to define how baselines will be establ...
Question 280: How does the 'managing product delivery' process ensure that...
Question 281: Identify the missing words in the following sentence. The pr...
Question 282: Which is NOT a purpose of the Initiating a Project process?...
Question 283: Which is a purpose of an End Stage Report?...
Question 284: Which PRINCE2 principle is supported by the setting of toler...
Question 285: When tailoring PRINCE2 to suit the project, [?] may be chang...
Question 286: Which is a recommended quality review team role?...
Question 287: Which is a purpose of a quality register?...
Question 288: Which are advantages of a clear end to a project? 1. No furt...
Question 289: Which is a minimum requirement for applying the change theme...
Question 290: Which should be funded from a change budget?...
Question 291: Which is a purpose of the Risk theme?...
Question 292: Which is NOT one of the PRINCE2 integrated elements?...
Question 293: Which is created during the Starting up a Project process?...
Question 294: Which activity takes place within the Managing a Stage Bound...
Question 295: Which describes risk probability?...
Question 296: What information should be recorded in the quality register?...
Question 297: Which risk response type is appropriate to respond to an opp...
Question 298: Which is a purpose of a Project Brief?...
Question 299: What do acceptance criteria identify?...
Question 300: Which is an objective of the Starting up a Project process?...
Question 301: Which is NOT represented by one of the three primary categor...
Question 302: What is the first task of product-based planning?...
Question 303: Which product records any project outcomes perceived as nega...
Question 304: Which statement is CORRECT about the customer and suppliers ...
Question 305: Why can PRINCE2 be applied to any type of project?...
Question 306: Identify the missing words in the following sentence. The si...
Question 307: Which are advantages of a clear end to a project? 1. No furt...
Question 308: Who should use the information in a Lessons Report to refine...
Question 309: Which is the Change Authority role permitted to authorize?...
Question 310: Which does the Executive need to ensure is in place before t...
Question 311: What is performed as part of the recommended risk management...
Question 312: Which document should record the agreed amount of risk budge...
Question 313: Which describes an off-specification?...
Question 314: What is a purpose of a Benefits Review Plan?...
Question 315: When should the Project Board refer to corporate or programm...
Question 316: Which should be funded by a change budget?...
Question 317: Which theme verifies that a project's products are fit for p...
Question 318: Which is a benefit of using PRINCE2?...
Question 319: Which is a typical core activity within configuration manage...
Question 320: Which is a purpose of quality planning?...
Question 321: When considering how long the project stages should be, whic...
Question 322: Which task is performed by the Change Authority?...
Question 323: Who should use the information in a Lessons Report to refine...
Question 324: Which process provides information for the project board to ...
Question 325: Which theme addresses the need to have a strategy for commun...
Question 326: Identify the missing words in the following sentence. An obj...
Question 327: Which of the following take place before the initiation of a...
Question 328: Which describes risk appetite?
Question 329: Which is a purpose of the plans theme?...
Question 330: Which product defines how the project board should approve t...
Question 331: Which is a purpose of the Directing a Project process?...
Question 332: What is the first task of product-based planning?...
Question 333: What process aims to ensure accurate progress information is...
Question 334: Identify the missing word in the following sentence. A membe...
Question 335: Who represents the three project interests on a project?...
Question 336: Which risk response type is appropriate to respond to an opp...
Question 337: Which is a step in the recommended approach to 'defining and...
Question 338: Which is a purpose of the 'controlling a stage' process?...
Question 339: Which process provides information for the project board to ...
Question 340: Which should be funded from a change budget?...
Question 341: Which is a purpose of the business case theme?...
Question 342: Which is a task of product-based planning?...