A project team is developing a software system for a financial organization and is conducting a failure modes and effects analysis (FMEA) to identify and evaluate potential failure points. The risk manager must guide the team on how to prioritize risks based on FMEA results for effective risk management. What should the risk manager do?
Correct Answer: D
The correct answer is D. Advise the team to prioritize risks using severity, occurrence, and detection ratings. In Failure Modes and Effects Analysis (FMEA) , risks are commonly evaluated using three core factors: * Severity : how serious the effect would be if the failure occurs, * Occurrence : how likely the failure is to happen, * Detection : how likely it is that the failure will be detected before causing impact. These three ratings are used together to determine the relative priority of potential failure modes. That is the recognized logic of FMEA and is exactly what the risk manager should reinforce. Why the other options are incorrect: * A. Direct the team to prioritize risks based solely on their likelihood to streamline the analysis. FMEA does not rely only on likelihood. A low-likelihood failure may still deserve high attention if the impact is severe or difficult to detect. * B. Encourage the team to focus on documenting the most severe FMEA risks and disregard others. This is incomplete and poor practice. Risks should not be disregarded simply because they are less severe; occurrence and detection also matter. * C. Emphasize technical faults within the system as the highest priority for risk response planning. FMEA is broader than technical faults alone and should evaluate all relevant failure modes systematically. Reference-aligned basis: This answer is consistent with standard FMEA methodology and general risk analysis practice. References: FMEA standard practice: severity, occurrence, and detection rating model PMI, Practice Standard for Project Risk Management ISO 31000, risk analysis principles