Valid CFI-I Dumps shared by ExamDiscuss.com for Helping Passing CFI-I Exam! ExamDiscuss.com now offer the newest CFI-I exam dumps, the ExamDiscuss.com CFI-I exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com CFI-I dumps with Test Engine here:
During an inspection, it is determined that the installation of a new suppression system is significantly different from the one approved during plans review. What action should be taken by the inspector?
Correct Answer: C
When a significant deviation from the approved plans is discovered during an inspection, the appropriate action is to require a submittal of a set of corrected plans. This is necessary to ensure the system is reviewed and approved in compliance with the applicable codes and standards. Issue a violation notice (A): While this may be a secondary step if the system does not meet code, it is not the first step when encountering unapproved changes. Evaluate the installation for compliance (B): Inspectors cannot simply evaluate the installation without updated plans, as the plans serve as the approved baseline for design compliance. Require corrected plans (C): This step ensures that the new design is documented, reviewed, and approved before proceeding. It maintains compliance with NFPA standards. Indicate modifications on the approved plan (D): Altering plans without proper review is not acceptable and does not ensure the system meets the original intent. Reference: NFPA 1 and NFPA 13: Systems must comply with approved designs and significant changes require resubmittal for review.