Question 277/627

Which of the following risk register updates is MOST important for senior management to review?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (627q)
Question 1: Which of the following is the BEST indication of an improved...
Question 2: A risk assessment has identified increased losses associated...
Question 3: The MAIN purpose of having a documented risk profile is to:...
Question 4: Performing a background check on a new employee candidate be...
Question 5: A risk practitioner has been asked to evaluate a new cloud-b...
Question 6: Which of the following should be considered when selecting a...
Question 7: A rule-based data loss prevention {DLP) tool has recently be...
Question 8: Which of the following is the PRIMARY objective of risk mana...
Question 9: Which of the following is a risk practitioner's BEST recomme...
Question 10: Who is MOST important lo include in the assessment of existi...
Question 11: Which of the following has the GREATEST influence on an orga...
Question 12: Which of the following would BEST help to ensure that identi...
Question 13: Which of the following is the GREATEST benefit of analyzing ...
Question 14: Which of the following is MOST effective against external th...
Question 15: Reviewing results from which of the following is the BEST wa...
Question 16: Which of the following should be management's PRIMARY consid...
Question 17: Which of the following observations would be GREATEST concer...
Question 18: Which of the following BEST enables the integration of IT ri...
Question 19: The implementation of a risk treatment plan will exceed the ...
Question 20: An organization has introduced risk ownership to establish c...
Question 21: The BEST key performance indicator (KPI) to measure the effe...
Question 22: An identified high probability risk scenario involving a cri...
Question 23: Which of the following presents the GREATEST challenge for a...
Question 24: If concurrent update transactions to an account are not proc...
Question 25: Which of the following is MOST important when considering ri...
Question 26: The risk associated with inadvertent disclosure of database ...
Question 27: A large organization recently restructured the IT department...
Question 28: Which of the following is the PRIMARY responsibility of the ...
Question 29: An internally developed payroll application leverages Platfo...
Question 30: Which of the following is a risk practitioner's MOST importa...
Question 31: A key risk indicator (KRI) is reported to senior management ...
Question 32: Which of the following is the MOST important topic to cover ...
Question 33: An organization has been notified that a disgruntled, termin...
Question 34: Read" rights to application files in a controlled server env...
Question 35: Which of the following is the MOST relevant information to i...
Question 36: Which of the following is the BEST recommendation of a risk ...
Question 37: An information system for a key business operation is being ...
Question 38: When formulating a social media policy lo address informatio...
Question 39: Which of the following is the MAIN benefit to an organizatio...
Question 40: Which of the following, who should be PRIMARILY responsible ...
Question 41: Which of the following is the BEST indicator of an effective...
Question 42: An assessment of information security controls has identifie...
Question 43: Which of the following is the PRIMARY reason to use key cont...
Question 44: The annualized loss expectancy (ALE) method of risk analysis...
Question 45: Which of the following is MOST appropriate to prevent unauth...
Question 46: Which of the following is the MOST important success factor ...
Question 47: Which of the following would present the MOST significant ri...
Question 48: Which of the following will BEST help to ensure the continue...
Question 49: An organization has agreed to a 99% availability for its onl...
Question 50: Which of the following would BEST help identify the owner fo...
Question 51: Which type of indicators should be developed to measure the ...
Question 52: When developing risk treatment alternatives for a Business c...
Question 53: An organization is implementing internet of Things (loT) tec...
Question 54: When determining which control deficiencies are most signifi...
Question 55: Which of the following is the BEST way to identify changes i...
Question 56: Which of the following is MOST important for mitigating ethi...
Question 57: After the review of a risk record, internal audit questioned...
Question 58: After undertaking a risk assessment of a production system, ...
Question 59: Which of the following is the BEST control to detect an adva...
Question 60: What is a risk practitioner's BEST approach to monitor and m...
Question 61: Which of the following should be the MAIN consideration when...
Question 62: Which of the following BEST confirms the existence and opera...
Question 63: The operational risk associated with attacks on a web applic...
Question 64: Which of the following scenarios is MOST important to commun...
Question 65: A risk heat map is MOST commonly used as part of an IT risk ...
Question 66: Which of the following should be the PRIMARY focus of an IT ...
Question 67: Which of the following BEST mitigates ethical risk?...
Question 68: An internal audit report reveals that a legacy system is no ...
Question 69: Which stakeholders are PRIMARILY responsible for determining...
Question 70: Which strategy employed by risk management would BEST help t...
Question 71: A risk practitioner has just learned about new malware that ...
Question 72: Which of the following is MOST important to consider before ...
Question 73: Which of the following would BEST facilitate the implementat...
Question 74: When outsourcing a business process to a cloud service provi...
Question 75: Which of the following is MOST helpful in verifying that the...
Question 76: Which of the following is MOST important to determine when a...
Question 77: Which of the following BEST promotes commitment to controls?...
Question 78: Which of the following attributes of a key risk indicator (K...
Question 79: Which of the following aspects of an IT risk and control sel...
Question 80: Which of the following offers the SIMPLEST overview of chang...
Question 81: To help ensure all applicable risk scenarios are incorporate...
Question 82: After a risk has been identified, who is in the BEST positio...
Question 83: A risk practitioner is defining metrics for security threats...
Question 84: Implementing which of the following will BEST help ensure th...
Question 85: A financial institution has identified high risk of fraud in...
Question 86: After a high-profile systems breach at an organization s key...
Question 87: Which of the following should be the PRIMARY consideration w...
Question 88: Which of the following is MOST helpful in identifying new ri...
Question 89: The BEST reason to classify IT assets during a risk assessme...
Question 90: When implementing an IT risk management program, which of th...
Question 91: An online payment processor would be severely impacted if th...
Question 92: An organization has initiated a project to implement an IT r...
Question 93: In a public company, which group is PRIMARILY accountable fo...
Question 94: Which of the following is the MOST important reason to creat...
Question 95: The BEST indicator of the risk appetite of an organization i...
Question 96: Which of the following is the MOST appropriate key risk indi...
Question 97: Which of the following is the BEST indicator of the effectiv...
Question 98: A chief information officer (CIO) has identified risk associ...
Question 99: Which of the following is the BEST recommendation when a key...
Question 100: Which of the following should be of GREATEST concern when re...
Question 101: Which of the following should be the risk practitioner's FIR...
Question 102: Which of the following activities is PRIMARILY the responsib...
Question 103: A risk practitioner is reviewing the status of an action pla...
Question 104: The MOST effective approach to prioritize risk scenarios is ...
Question 105: Which of the following should be the HIGHEST priority when d...
Question 106: During an IT risk scenario review session, business executiv...
Question 107: Which of the following should be the starting point when per...
Question 108: Which of the following should be included in a risk assessme...
Question 109: An organization has established a contract with a vendor tha...
Question 110: Which of the following key risk indicators (KRIs) is MOST ef...
Question 111: The BEST metric to monitor the risk associated with changes ...
Question 112: Which of the following would be MOST helpful when communicat...
Question 113: The PRIMARY reason for tracking the status of risk mitigatio...
Question 114: Upon learning that the number of failed back-up attempts con...
Question 115: Which of the following should be the PRIMARY objective of a ...
Question 116: A third-party vendor has offered to perform user access prov...
Question 117: An organization allows programmers to change production syst...
Question 118: Which of the following is MOST important for the organizatio...
Question 119: The PRIMARY reason for prioritizing risk scenarios is to:...
Question 120: Which of the following should be the PRIMARY driver for an o...
Question 121: An organization has granted a vendor access to its data in o...
Question 122: Which of the following methods would BEST contribute to iden...
Question 123: An IT control gap has been identified in a key process. Who ...
Question 124: An organization's IT department wants to complete a proof of...
Question 125: Which of the following is the PRIMARY objective of aggregati...
Question 126: Which of the following is the BEST approach when a risk trea...
Question 127: A change management process has recently been updated with n...
Question 128: Which of the following can be interpreted from a single data...
Question 129: An organization has allowed several employees to retire earl...
Question 130: Reviewing which of the following would provide the MOST usef...
Question 131: Which of the following is the MOST effective control to main...
Question 132: Which of the following is the MOST important consideration w...
Question 133: Which of the following is the BEST way to support communicat...
Question 134: Which of the following should be included in a risk scenario...
Question 135: Which of the following is the MOST important step to ensure ...
Question 136: Which of the following is the PRIMARY benefit of using an en...
Question 137: Which of the following is the BEST indicator of the effectiv...
Question 138: The MAIN purpose of selecting a risk response is to....
Question 139: Senior management has asked a risk practitioner to develop t...
Question 140: Which of the following is the BEST key control indicator (KC...
Question 141: Which of the following changes would be reflected in an orga...
Question 142: Which of the following should be the PRIMARY focus of a risk...
Question 143: Which of the following would be MOST helpful to a risk owner...
Question 144: Which of the following provides the BEST evidence that risk ...
Question 145: Which of the following will BEST help to improve an organiza...
Question 146: Which of the following is MOST helpful to ensure effective s...
Question 147: An organization delegates its data processing to the interna...
Question 148: A systems interruption has been traced to a personal USB dev...
Question 149: Who is BEST suited to determine whether a new control proper...
Question 150: Which of the following would be MOST important for a risk pr...
Question 151: Which of the following should be done FIRST when a new risk ...
Question 152: Analyzing trends in key control indicators (KCIs) BEST enabl...
Question 153: Which of the following provides the MOST important informati...
Question 154: An organization must make a choice among multiple options to...
Question 155: An organization is adopting block chain for a new financial ...
Question 156: Which of the following tools is MOST effective in identifyin...
Question 157: Which of the following will BEST communicate the importance ...
Question 158: Which of the following BEST enables a risk practitioner to i...
Question 159: Which of the following provides the BEST evidence that risk ...
Question 160: Which of the following provides the BEST assurance of the ef...
Question 161: Which of the following is the MOST important reason to valid...
Question 162: A risk practitioner has collaborated with subject matter exp...
Question 163: Following an acquisition, the acquiring company's risk pract...
Question 164: Which of the following is the BEST method to identify unnece...
Question 165: Which of the following is the BEST method to mitigate the ri...
Question 166: Which of the following would be the BEST way for a risk prac...
Question 167: In an organization that allows employee use of social media ...
Question 168: Which of the following provides the MOST useful information ...
Question 169: Which of the following should a risk practitioner recommend ...
Question 170: A key risk indicator (KRI) threshold has reached the alert l...
Question 171: Which of the following is the BEST way for a risk practition...
Question 172: Which of the following is the MOST important key performance...
Question 173: Which of the following is MOST important when discussing ris...
Question 174: Which of the following is the BEST indication of the effecti...
Question 175: What should be the PRIMARY objective for a risk practitioner...
Question 176: The BEST way to justify the risk mitigation actions recommen...
Question 177: Which of the following would be the GREATEST concern for an ...
Question 178: When preparing a risk status report for periodic review by s...
Question 179: Which of the following is the MOST significant indicator of ...
Question 180: Which of the following is the MOST useful information an org...
Question 181: Which of the following is MOST important when identifying an...
Question 182: It is MOST important that security controls for a new system...
Question 183: Which of the following is the PRIMARY benefit of consistentl...
Question 184: Which of the following is the BEST method to maintain a comm...
Question 185: Which of the following is the GREATEST concern when establis...
Question 186: Which of the following is the MOST important objective from ...
Question 187: An organization's stakeholders are unable to agree on approp...
Question 188: Which of the following is the BEST way to confirm whether ap...
Question 189: A deficient control has been identified which could result i...
Question 190: Which of the following MUST be updated to maintain an IT ris...
Question 191: Which of the following should be a risk practitioner's NEXT ...
Question 192: Which of the following is the GREATEST benefit of a three li...
Question 193: In order to efficiently execute a risk response action plan,...
Question 194: Which of the following is MOST important to identify when de...
Question 195: Which of the following is the GREATEST benefit of updating t...
Question 196: Before assigning sensitivity levels to information it is MOS...
Question 197: Which of the following would BEST enable a risk practitioner...
Question 198: Which of the following is the BEST method for assessing cont...
Question 199: Which of the following is the BEST approach for selecting co...
Question 200: A newly incorporated enterprise needs to secure its informat...
Question 201: Which of the following scenarios is MOST likely to cause a r...
Question 202: Which of the following is the BEST way to ensure adequate re...
Question 203: Which of the following controls would BEST reduce the likeli...
Question 204: Which of the following is the BEST course of action for a sy...
Question 205: Which of the following is the BEST key performance indicator...
Question 206: Which of the following is MOST important to review when an o...
Question 207: Once a risk owner has decided to implement a control to miti...
Question 208: Which of the following would present the GREATEST challenge ...
Question 209: Who should be responsible for determining which stakeholders...
Question 210: A risk practitioner observed Vial a high number of pokey exc...
Question 211: Which stakeholder is MOST important to include when defining...
Question 212: Which of the following is the BEST approach to mitigate the ...
Question 213: Which of the following should be used as the PRIMARY basis f...
Question 214: What should a risk practitioner do FIRST when vulnerability ...
Question 215: Which of the following provides the MOST useful information ...
Question 216: A failure in an organization s IT system build process has r...
Question 217: Which of the following is the FIRST step in managing the ris...
Question 218: Which of the following BEST assists in justifying an investm...
Question 219: Which of the following BEST indicates whether security aware...
Question 220: Which of the following statements BEST illustrates the relat...
Question 221: Which of the following would MOST likely require a risk prac...
Question 222: The PRIMARY benefit of conducting a risk workshop using a to...
Question 223: Which of the following resources is MOST helpful when creati...
Question 224: Which type of cloud computing deployment provides the consum...
Question 225: Which of the following is a risk practitioner's BEST course ...
Question 226: Which of the following is the PRIMARY reason to ensure polic...
Question 227: An enterprise has taken delivery of software patches that ad...
Question 228: Which of the following is the MOST important consideration w...
Question 229: An organization has outsourced its billing function to an ex...
Question 230: What is the PRIMARY reason to periodically review key perfor...
Question 231: The PRIMARY benefit of classifying information assets is tha...
Question 232: Which of the following risk management practices BEST facili...
Question 233: Which of the following is the MOST important course of actio...
Question 234: Which of the following will BEST ensure that information sec...
Question 235: Which of the following provides the BEST evidence that a sel...
Question 236: During a risk assessment, the risk practitioner finds a new ...
Question 237: It was discovered that a service provider's administrator wa...
Question 238: Which of the following is the BEST method to track asset inv...
Question 239: A risk practitioner has reviewed new international regulatio...
Question 240: An organization wants to transfer risk by purchasing cyber i...
Question 241: Which of the following is the BEST way to detect zero-day ma...
Question 242: An internal audit report reveals that not all IT application...
Question 243: An organization plans to migrate sensitive information to a ...
Question 244: Which of the following should be management's PRIMARY focus ...
Question 245: The PRIMARY benefit of selecting an appropriate set of key r...
Question 246: Which of the following would MOST likely cause management to...
Question 247: The analysis of which of the following will BEST help valida...
Question 248: During the risk assessment of an organization that processes...
Question 249: A risk practitioner observes that hardware failure incidents...
Question 250: Which of the following will BEST support management repottin...
Question 251: Which of the following can be used to assign a monetary valu...
Question 252: Which of the following is the MOST effective way to reduce p...
Question 253: Which of the following would be of MOST concern to a risk pr...
Question 254: Which of the following should be a risk practitioner's NEXT ...
Question 255: Which of the following is the MOST important consideration f...
Question 256: When documenting a risk response, which of the following pro...
Question 257: The PRIMARY purpose of a maturity model is to compare the:...
Question 258: Which of the following is MOST helpful in aligning IT risk w...
Question 259: Which of the following would provide the BEST guidance when ...
Question 260: Which of these documents is MOST important to request from a...
Question 261: Which of the following is the PRIMARY reason for a risk prac...
Question 262: The PRIMARY advantage of involving end users in continuity p...
Question 263: Which of the following potential scenarios associated with t...
Question 264: Which of the following is the PRIMARY objective of maintaini...
Question 265: What should a risk practitioner do FIRST upon learning a ris...
Question 266: A recent regulatory requirement has the potential to affect ...
Question 267: A bank wants to send a critical payment order via email to o...
Question 268: Which of the following is the BEST response when a potential...
Question 269: Which of the following should be the GREATEST concern to a r...
Question 270: A root because analysis indicates a major service disruption...
Question 271: The PRIMARY reason for periodic penetration testing of Inter...
Question 272: The results of a risk assessment reveal risk scenarios with ...
Question 273: The PRIMARY objective of the board of directors periodically...
Question 274: What is the PRIMARY purpose of a business impact analysis (B...
Question 275: Which of the following is the PRIMARY benefit of integrating...
Question 276: Vulnerabilities have been detected on an organization's syst...
Question 277: Which of the following risk register updates is MOST importa...
Question 278: Which of the following is the BEST method for determining an...
Question 279: Controls should be defined during the design phase of system...
Question 280: The BEST indication that risk management is effective is whe...
Question 281: Which of the following is the GREATEST concern when an organ...
Question 282: Which of the following should management consider when selec...
Question 283: Which of the following is the MAIN reason for documenting th...
Question 284: Which of the following is the GREATEST benefit of centralizi...
Question 285: The BEST way to improve a risk register is to ensure the reg...
Question 286: Which of the following would prompt changes in key risk indi...
Question 287: After undertaking a risk assessment of a production system, ...
Question 288: An organization's Internet-facing server was successfully at...
Question 289: Which of The following is the MOST comprehensive input to th...
Question 290: Who is accountable for risk treatment?...
Question 291: Which of the following is the MOST important consideration f...
Question 292: An organization is moving its critical assets to the cloud. ...
Question 293: An IT risk practitioner has been asked to regularly report o...
Question 294: Which of the following is the PRIMARY benefit of stakeholder...
Question 295: Which of the following is the PRIMARY reason to perform ongo...
Question 296: Which of the following is the PRIMARY reason for an organiza...
Question 297: Which of The following BEST represents the desired risk post...
Question 298: Which of the following is the PRIMARY reason to update a ris...
Question 299: A global organization is planning to collect customer behavi...
Question 300: From a business perspective, which of the following is the M...
Question 301: Which of the following is MOST important for successful inci...
Question 302: Who should be accountable for monitoring the control environ...
Question 303: Which of the following is the MOST important responsibility ...
Question 304: The PRIMARY objective of a risk identification process is to...
Question 305: Which of the following proposed benefits is MOST likely to i...
Question 306: Which of the following BEST supports the management of ident...
Question 307: Who is the MOST appropriate owner for newly identified IT ri...
Question 308: Which of the following trends would cause the GREATEST conce...
Question 309: When establishing an enterprise IT risk management program, ...
Question 310: The MAIN reason for prioritizing IT risk responses is to ena...
Question 311: A global company s business continuity plan (BCP) requires t...
Question 312: Which of the following would provide executive management wi...
Question 313: An IT risk practitioner is evaluating an organization's chan...
Question 314: Which of the following provides The BEST information when de...
Question 315: Which of the following BEST indicates the risk appetite and ...
Question 316: Which of the following is the MOST important consideration w...
Question 317: An organization operates in an environment where reduced tim...
Question 318: The PRIMARY benefit of conducting continuous monitoring of a...
Question 319: Which of the following data would be used when performing a ...
Question 320: Who is BEST suited to provide objective input when updating ...
Question 321: During an IT department reorganization, the manager of a ris...
Question 322: Which of the following is MOST important for an organization...
Question 323: Which of the following management actions will MOST likely c...
Question 324: When classifying and prioritizing risk responses, the areas ...
Question 325: Which of the following BEST enables a risk practitioner to u...
Question 326: Which of the following BEST facilitates the mitigation of id...
Question 327: While reviewing the risk register, a risk practitioner notic...
Question 328: Which of the following is MOST important to include in a Sof...
Question 329: Which of the following should be a risk practitioner's GREAT...
Question 330: Which of the following would be a risk practitioner's GREATE...
Question 331: Which of the following is MOST helpful to understand the con...
Question 332: Which of the following analyses is MOST useful for prioritiz...
Question 333: A poster has been displayed in a data center that reads. "An...
Question 334: Which of the following is the MOST important consideration w...
Question 335: Which of the following would be the GREATEST concern related...
Question 336: Which of the following resources is MOST helpful to a risk p...
Question 337: Which of the following BEST indicates the effectiveness of a...
Question 338: Which of the following controls will BEST detect unauthorize...
Question 339: An application development team has a backlog of user requir...
Question 340: Which of the following is MOST important for a multinational...
Question 341: Which of the following is the BEST way to promote adherence ...
Question 342: Which of the following provides the BEST measurement of an o...
Question 343: Which of the following should be the FIRST consideration whe...
Question 344: It is MOST important for a risk practitioner to have an awar...
Question 345: An organization is implementing robotic process automation (...
Question 346: Which of the following is the PRIMARY objective of establish...
Question 347: Which of the following is the MOST important benefit of key ...
Question 348: Which of the following is the BEST method for assessing cont...
Question 349: Which of the following is the BEST recommendation to address...
Question 350: To communicate the risk associated with IT in business terms...
Question 351: An organization recently configured a new business division ...
Question 352: Which of the following presents the GREATEST privacy risk re...
Question 353: Which of the following would BEST help an enterprise priorit...
Question 354: A risk practitioner's BEST guidance to help an organization ...
Question 355: In response to the threat of ransomware, an organization has...
Question 356: Prior to selecting key performance indicators (KPIs), itis M...
Question 357: After an annual risk assessment is completed, which of the f...
Question 358: An organization retains footage from its data center securit...
Question 359: Which of the following should be implemented to BEST mitigat...
Question 360: Which of the following will BEST help ensure that risk facto...
Question 361: Which of the following is MOST important to ensure when revi...
Question 362: An IT risk practitioner has determined that mitigation activ...
Question 363: The BEST way to determine the likelihood of a system availab...
Question 364: A department has been granted an exception to bypass the exi...
Question 365: Which of the following should be accountable for ensuring th...
Question 366: Which of the following is a risk practitioner's BEST recomme...
Question 367: A contract associated with a cloud service provider MUST inc...
Question 368: Which of the following is the PRIMARY reason to establish th...
Question 369: Which of the following is the MOST important benefit of repo...
Question 370: Which of the following would MOST likely cause a risk practi...
Question 371: When defining thresholds for control key performance indicat...
Question 372: When developing risk scenario using a list of generic scenar...
Question 373: The BEST key performance indicator (KPI) for monitoring adhe...
Question 374: Which of the following is the MOST important consideration w...
Question 375: Which of the following is MOST useful for measuring the exis...
Question 376: Which of the following actions should a risk practitioner do...
Question 377: Which of the following should be the PRIMARY input when desi...
Question 378: An organization is preparing to transfer a large number of c...
Question 379: An audit reveals that there are changes in the environment t...
Question 380: Which of the following is the BEST course of action when an ...
Question 381: An organization has procured a managed hosting service and j...
Question 382: IT risk assessments can BEST be used by management:...
Question 383: Which of the following BEST protects an organization against...
Question 384: Which of the following would BEST prevent an unscheduled app...
Question 385: Which of the following is a KEY outcome of risk ownership?...
Question 386: The PRIMARY reason for establishing various Threshold levels...
Question 387: A risk practitioner is involved in a comprehensive overhaul ...
Question 388: Which of the following is the BEST key performance indicator...
Question 389: Which of the following is the BEST approach when a risk trea...
Question 390: Which group has PRIMARY ownership of reputational risk stemm...
Question 391: An incentive program is MOST likely implemented to manage th...
Question 392: Which of the following techniques would be used during a ris...
Question 393: In an organization dependent on data analytics to drive deci...
Question 394: A risk practitioner learns that the organization s industry ...
Question 395: After migrating a key financial system to a new provider, it...
Question 396: A risk practitioner learns that a risk owner has been accept...
Question 397: A recent internal risk review reveals the majority of core I...
Question 398: An organization plans to implement a new Software as a Servi...
Question 399: A company has recently acquired a customer relationship mana...
Question 400: The MOST essential content to include in an IT risk awarenes...
Question 401: A risk practitioner shares the results of a vulnerability as...
Question 402: Which of the following should be of MOST concern to a risk p...
Question 403: Which of the following criteria associated with key risk ind...
Question 404: Which of the following is MOST helpful in providing an overv...
Question 405: Which of the following would provide the MOST useful input w...
Question 406: An organization is developing a risk universe to create a ho...
Question 407: Which of the following is BEST used to aggregate data from m...
Question 408: Which of the following risk register elements is MOST likely...
Question 409: A control owner has completed a year-long project To strengt...
Question 410: An organization recently implemented new technologies that e...
Question 411: Management has noticed storage costs have increased exponent...
Question 412: A cote data center went offline abruptly for several hours a...
Question 413: Which of the following would be MOST useful when measuring t...
Question 414: Which of the following will MOST likely change as a result o...
Question 415: Reviewing historical risk events is MOST useful for which of...
Question 416: Which of the following should be the PRIMARY input to determ...
Question 417: Which of the following is the PRIMARY objective for automati...
Question 418: Which of the following is the BEST way to assess the effecti...
Question 419: Which of the following would present the GREATEST challenge ...
Question 420: Which of the following is the BEST way to mitigate the risk ...
Question 421: When reviewing management's IT control self-assessments, a r...
Question 422: Which of the following deficiencies identified during a revi...
Question 423: A risk practitioner is developing a set of bottom-up IT risk...
Question 424: Which of the following would be MOST beneficial as a key ris...
Question 425: If preventive controls cannot be Implemented due to technolo...
Question 426: The purpose of requiring source code escrow in a contractual...
Question 427: A risk practitioner is reviewing a vendor contract and finds...
Question 428: A new policy has been published to forbid copying of data on...
Question 429: Which of the following is a risk practitioner's BEST course ...
Question 430: After entering a large number of low-risk scenarios into the...
Question 431: Which of the following provides the BEST evidence that risk ...
Question 432: The number of tickets to rework application code has signifi...
Question 433: An IT department has organized training sessions to improve ...
Question 434: When of the following standard operating procedure (SOP) sta...
Question 435: Which of the following would provide the MOST helpful input ...
Question 436: An organization has been made aware of a newly discovered cr...
Question 437: Who is MOST likely to be responsible for the coordination be...
Question 438: Which of the following is the BEST method to track asset inv...
Question 439: Which of the following facilitates a completely independent ...
Question 440: Which of the following s MOST likely to deter an employee fr...
Question 441: An organization has made a decision to purchase a new IT sys...
Question 442: Which of the following is the GREATEST benefit to an organiz...
Question 443: Which of the following is a KEY consideration for a risk pra...
Question 444: Which of the following roles would be MOST helpful in provid...
Question 445: Which of the following is the MOST important consideration w...
Question 446: An upward trend in which of the following metrics should be ...
Question 447: Which of the following is the MAIN benefit to an organizatio...
Question 448: An organization's HR department has implemented a policy req...
Question 449: Which of the following BEST enables the development of a suc...
Question 450: Which of the following is MOST useful when communicating ris...
Question 451: The BEST key performance indicator (KPI) to measure the effe...
Question 452: Which of the following is the BEST criterion to determine wh...
Question 453: An organization's risk tolerance should be defined and appro...
Question 454: The maturity of an IT risk management program is MOST influe...
Question 455: The PRIMARY reason a risk practitioner would be interested i...
Question 456: Which of the following should a risk practitioner do NEXT af...
Question 457: Which of the following approaches to bring your own device (...
Question 458: For a large software development project, risk assessments a...
Question 459: Which of the following would BEST help minimize the risk ass...
Question 460: Which of the following is the GREATEST benefit of using IT r...
Question 461: Which of the following would BEST help to address the risk a...
Question 462: Which of the following is MOST important to review when eval...
Question 463: Which of the following BEST mitigates the risk associated wi...
Question 464: A control owner responsible for the access management proces...
Question 465: The PRIMARY benefit associated with key risk indicators (KRl...
Question 466: Which of the following would BEST mitigate the risk associat...
Question 467: Which of the following is MOST likely to cause a key risk in...
Question 468: Which element of an organization's risk register is MOST imp...
Question 469: An organization has an approved bring your own device (BYOD)...
Question 470: Which of the following is the BEST way to quantify the likel...
Question 471: Legal and regulatory risk associated with business conducted...
Question 472: Which of the following is MOST helpful in preventing risk ev...
Question 473: Which of the following would MOST likely result in updates t...
Question 474: Which of the following BEST represents a critical threshold ...
Question 475: To define the risk management strategy which of the followin...
Question 476: An organization has decided to outsource a web application, ...
Question 477: Who should be responsible for approving the cost of controls...
Question 478: Improvements in the design and implementation of a control w...
Question 479: An assessment of information security controls has identifie...
Question 480: Which of the following BEST reduces the probability of lapto...
Question 481: Which of the following is the MOST important consideration w...
Question 482: Which of the following would BEST enable a risk-based decisi...
Question 483: The BEST criteria when selecting a risk response is the:...
Question 484: Periodically reviewing and updating a risk register with det...
Question 485: Which of the following stakeholders are typically included a...
Question 486: A hospital recently implemented a new technology to allow vi...
Question 487: During a routine check, a system administrator identifies un...
Question 488: During an acquisition, which of the following would provide ...
Question 489: What should a risk practitioner do FIRST when a shadow IT ap...
Question 490: The FIRST task when developing a business continuity plan sh...
Question 491: A risk practitioner has discovered a deficiency in a critica...
Question 492: When performing a risk assessment of a new service to suppor...
Question 493: Which of the following BEST balances the costs and benefits ...
Question 494: Which of the following would be the BEST key performance ind...
Question 495: A risk owner has identified a risk with high impact and very...
Question 496: Which of the following is the BEST indication that key risk ...
Question 497: During the initial risk identification process for a busines...
Question 498: The MAJOR reason to classify information assets is...
Question 499: An organization has just implemented changes to close an ide...
Question 500: Which of the following BEST facilitates the identification o...
Question 501: Which of the following should be the MOST important consider...
Question 502: All business units within an organization have the same risk...
Question 503: Business areas within an organization have engaged various c...
Question 504: Which of the following should be a risk practitioner's PRIMA...
Question 505: Which of the following is of GREATEST concern when uncontrol...
Question 506: An organization's financial analysis department uses an in-h...
Question 507: A risk practitioner notices that a particular key risk indic...
Question 508: An organization striving to be on the leading edge in regard...
Question 509: The BEST key performance indicator (KPI) to measure the effe...
Question 510: An organization is concerned that its employees may be unint...
Question 511: An organization's internal audit department is considering t...
Question 512: Which of the following is the MOST common concern associated...
Question 513: The head of a business operations department asks to review ...
Question 514: An organization that has been the subject of multiple social...
Question 515: A PRIMARY advantage of involving business management in eval...
Question 516: Who should be responsible for strategic decisions on risk ma...
Question 517: A risk practitioner is organizing a training session lo comm...
Question 518: Which of the following is necessary to enable an IT risk reg...
Question 519: Which of the following represents a vulnerability?...
Question 520: A control owner identifies that the organization's shared dr...
Question 521: The PRIMARY objective of testing the effectiveness of a new ...
Question 522: An effective control environment is BEST indicated by contro...
Question 523: Which of the following should be done FIRST when developing ...
Question 524: Which of the following is the MOST effective way to incorpor...
Question 525: A recent big data project has resulted in the creation of an...
Question 526: Which of the following is the GREATEST benefit when enterpri...
Question 527: The MAIN purpose of reviewing a control after implementation...
Question 528: The PRIMARY benefit of using a maturity model is that it hel...
Question 529: Which of the following is MOST helpful in developing key ris...
Question 530: An organization has received notification that it is a poten...
Question 531: A risk practitioner has observed that there is an increasing...
Question 532: Which of the following should be the PRIMARY basis for prior...
Question 533: Which of the following will BEST help to ensure that informa...
Question 534: Which of the following will provide the BEST measure of comp...
Question 535: When determining the accuracy of a key risk indicator (KRI),...
Question 536: Which of the following BEST informs decision-makers about th...
Question 537: Which of the following could BEST detect an in-house develop...
Question 538: Which of the following is MOST important to consider when de...
Question 539: A business unit has decided to accept the risk of implementi...
Question 540: Which of the following is the MOST important consideration f...
Question 541: Which of the following is the BEST course of action to help ...
Question 542: Which of the following is MOST important for management to c...
Question 543: Who should be PRIMARILY responsible for establishing an orga...
Question 544: Which of the following is the PRIMARY reason for an organiza...
Question 545: An organization recently implemented an automated interface ...
Question 546: WhichT5f the following is the MOST effective way to promote ...
Question 547: Which of the following is the result of a realized risk scen...
Question 548: A company has located its computer center on a moderate eart...
Question 549: Which of the following is the MOST important document regard...
Question 550: A software developer has administrative access to a producti...
Question 551: The PRIMARY focus of an ongoing risk awareness program shoul...
Question 552: Which of the following is MOST important for a risk practiti...
Question 553: Which of the following is MOST influential when management m...
Question 554: A risk practitioner has determined that a key control does n...
Question 555: Which of the following BEST facilitates the development of e...
Question 556: Following a review of a third-party vendor, it is MOST impor...
Question 557: Which of the following is MOST important to promoting a risk...
Question 558: Which of the following roles would provide the MOST importan...
Question 559: Which of the following should be the FIRST step when a compa...
Question 560: The BEST way to mitigate the high cost of retrieving electro...
Question 561: An organization has decided to commit to a business activity...
Question 562: A risk practitioner recently discovered that sensitive data ...
Question 563: The BEST way to obtain senior management support for investm...
Question 564: Which of the following is MOST important to the integrity of...
Question 565: Reviewing which of the following provides the BEST indicatio...
Question 566: An organization has just started accepting credit card payme...
Question 567: Which of the following should be the PRIMARY focus of a disa...
Question 568: An application owner has specified the acceptable downtime i...
Question 569: The PRIMARY purpose of IT control status reporting is to:...
Question 570: Which of the following is the BEST way to determine whether ...
Question 571: In addition to the risk register, what should a risk practit...
Question 572: Which of the following is MOST helpful in identifying gaps b...
Question 573: Which of the blowing is MOST important when implementing an ...
Question 574: What is the PRIMARY reason an organization should include ba...
Question 575: Which of the following issues found during the review of a n...
Question 576: An IT department has provided a shared drive for personnel t...
Question 577: Which of the following is the MOST important outcome of a bu...
Question 578: Which of the following is MOST essential for an effective ch...
Question 579: An organization is implementing encryption for data at rest ...
Question 580: An organization's risk register contains a large volume of r...
Question 581: Which of the following should be the risk practitioner s PRI...
Question 582: Which of the following statements describes the relationship...
Question 583: Which of the following is the MOST important information to ...
Question 584: Which of the following would be MOST helpful when estimating...
Question 585: Which of the following events is MOST likely to trigger the ...
Question 586: The MAIN purpose of conducting a control self-assessment (CS...
Question 587: Which of the following BEST indicates that an organization h...
Question 588: The BEST way to demonstrate alignment of the risk profile wi...
Question 589: Which of the following is the MOST important input when deve...
Question 590: Which of the following is a KEY responsibility of the second...
Question 591: A business unit is updating a risk register with assessment ...
Question 592: An organization operates in a jurisdiction where heavy fines...
Question 593: A management team is on an aggressive mission to launch a ne...
Question 594: An organization has established workflows in its service des...
Question 595: An organization is analyzing the risk of shadow IT usage. Wh...
Question 596: For no apparent reason, the time required to complete daily ...
Question 597: Which of the following is the BEST measure of the effectiven...
Question 598: Which of the following will help ensure the elective decisio...
Question 599: Which of the following is the MOST important consideration w...
Question 600: Key risk indicators (KRIs) are MOST useful during which of t...
Question 601: Which of the following should be an element of the risk appe...
Question 602: Which of the following is the BEST key performance indicator...
Question 603: The risk appetite for an organization could be derived from ...
Question 604: Which of the following BEST mitigates the risk of sensitive ...
Question 605: Which of the following BEST enables risk-based decision maki...
Question 606: Which of the following should be the PRIMARY consideration w...
Question 607: Which of the following provides the MOST comprehensive infor...
Question 608: Malware has recently affected an organization. The MOST effe...
Question 609: Which of the following is MOST important requirement to incl...
Question 610: Which of the following BEST indicates that an organizations ...
Question 611: Which of the following criteria is MOST important when devel...
Question 612: What is the MOST important consideration when aligning IT ri...
Question 613: Which of the following is the BEST approach for an organizat...
Question 614: Which of the following BEST enables an organization to deter...
Question 615: Which of the following would MOST effectively reduce the pot...
Question 616: What should be the PRIMARY driver for periodically reviewing...
Question 617: Which of the following would be MOST useful to senior manage...
Question 618: After identifying new risk events during a project, the proj...
Question 619: Which of the following BEST supports ethical IT risk managem...
Question 620: Which of the following is the MOST useful information for a ...
Question 621: Which of the following is the GREATEST concern associated wi...
Question 622: An organization has experienced a cyber-attack that exposed ...
Question 623: Which of the following MUST be assessed before considering r...
Question 624: Which of the following is MOST important when conducting a p...
Question 625: Which of the following is the MOST important foundational el...
Question 626: An organization recently experienced a cyber attack that res...
Question 627: An organizations chief technology officer (CTO) has decided ...