Which of the following is the MOST important consideration when determining whether to accept residual risk after security controls have been implemented on a critical system?
Correct Answer: A
Residual risk is the risk that remains after security controls have been implemented on a system. Residual risk can be accepted, transferred, avoided, or further mitigated. The most important consideration when deciding whether to accept residual risk is the cost versus benefit of additional mitigating controls. This means comparing the potential impact of the residual risk with the cost and effectiveness of implementing more controls to reduce it. If the cost of additional controls outweighs the benefit of reducing the residual risk, then it may be acceptable to accept the residual risk. However, if the benefit of additional controls exceeds the cost, then it may be advisable to implement more controls to lower the residual risk to an acceptable level. References = Risk and Information Systems Control Study Manual, Chapter 3: Risk Response and Mitigation, Section 3.4: Risk Response Selection, p. 156-157.