Valid LEED-AP-BD-C Dumps shared by ExamDiscuss.com for Helping Passing LEED-AP-BD-C Exam! ExamDiscuss.com now offer the newest LEED-AP-BD-C exam dumps, the ExamDiscuss.com LEED-AP-BD-C exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com LEED-AP-BD-C dumps with Test Engine here:
The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include
Correct Answer: C
Explanation The current facilities requirements (CFR) and operations and maintenance plan (OMP) are two documents that are required for the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. The CFR is a document that describes the owner's project requirements, such as the design intent, performance goals, and operational needs of the building. The OMP is a document that provides information and guidance on how to operate and maintain the commissioned systems and equipment. According to the LEED v4 Reference Guide for Building Design and Construction, the CFR and OMP must include the minimum outside air requirements, which are the minimum rates of outdoor air ventilation that are needed to provide acceptable indoor air quality and thermal comfort for the occupants1. The issue logs, functional performance tests, and installation verification (construction) checklists are not required to be included in the CFR and OMP, but they are part of the commissioning process and documentation. References: *LEED v4 Reference Guide for Building Design and Construction, Energy and Atmosphere Prerequisite: Fundamental Commissioning and Verification, page 2611 *Fundamental commissioning and verification | U.S. Green Building Council2