Which of the following methodologies is appropriate for planning and controlling activities and resources in a system project?
Correct Answer: A
A Gantt chart is a popular type of bar chart showing the interrelationships of how projects, schedules, and other time-related systems progress over time. Not B: Program Evaluation and Review Technique - (PERT) A method used to size a software product and calculate the Standard Deviation (SD) for risk assessment. The PERT equation (beta distribution) estimates the Equivalent Delivered Source Instructions (EDSIs) and the SD based on the analyst's estimates of the lowest possible size, the most likely size, and the highest possible size of each computer program component (CPC). http://computing-dictionary.thefreedictionary.com/