Valid H12-811_V1.0 Dumps shared by ExamDiscuss.com for Helping Passing H12-811_V1.0 Exam! ExamDiscuss.com now offer the newest H12-811_V1.0 exam dumps, the ExamDiscuss.com H12-811_V1.0 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com H12-811_V1.0 dumps with Test Engine here:
As shown in the figure, all switches run STP. Assume that the path cost of all ports is 200. What is the root path cost contained in the configuration BPDU received by G0/0/4 on SWD?
Correct Answer: B
The root path cost is calculated by summing the costs of each port on the path from the root bridge to the receiving port. In this case, assuming each link has a cost of 200, the total cost to reach the root from the indicated port would be 600, reflecting three hops from the root bridge.