A network engineer needs to remove switch 2 from a stack of four switches permanently.
Which process should the network engineer use?
A: Adjust the stacking cables to take the N-Series switch out of the stack, log into the CLI of the stack, and run the following command:

B: Adjust the stacking cables to take the switch out of the stack. The master switch will automatically remove the switch from the stack.
C: Adjust the stacking cables to take the switch out of the stack, log into the CLI of the stack, and run the following command:

D: Adjust the stacking cables to take the switch out of the stack, and reboot the stack.