Question 56/65

An engineer is redeploying an PS-M4110 storage array in an M1000e chassis. The engineer chooses Configure Array from the CMC. All settings are unavailable.
What should the engineer do to allow the CMC to configure the array?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (65q)
Question 1: A VRTX has storage set up as a RAID 10 in a 16-drive disk gr...
Question 2: An engineer is troubleshooting a VRTX with the following con...
Question 3: An engineer is deploying a chassis with multiple servers. No...
Question 4: An engineer is deploying Dell SupportAssist to manage a data...
Question 5: An engineer needs to limit the power consumption of a chassi...
Question 6: An engineer is installing 10Gb modules into a pair of MXL sw...
Question 7: An engineer needs to configure server 1 to communicate on ta...
Question 8: An engineer is responsible for data center bare metal deploy...
Question 9: (Exhibit) Refer to the exhibit. An engineer receives a pair ...
Question 10: An engineer enters a data center to configure an uplink betw...
Question 11: Company servers are in the branch offices located at differe...
Question 12: An engineer is installing a known good PCIe storage adapter ...
Question 13: An engineer needs to assign two PCIe NICs and a GPU to a ser...
Question 14: A VRTX has the following physical disks: - 8 300 GB SSDs - 1...
Question 15: An engineer has a new blade chassis that is ¾ full. The chas...
Question 16: (Exhibit) Refer to the exhibit. An engineer needs to configu...
Question 17: A password to the CMC root account on an M1000e server chass...
Question 18: An engineer installs a second Shared PERC Internal card into...
Question 19: An engineer needs to enable automated proactive support from...
Question 20: An engineer is deploying a new server node into an existing ...
Question 21: An engineer needs to connect ports 49 and 53 on an MXL to a ...
Question 22: An engineer is installing two PCIe NICs into an existing VRT...
Question 23: An engineer deploys an FX2 and plugs cables from GB1 and STK...
Question 24: (Exhibit) Refer to the exhibit. An engineer receives a pair ...
Question 25: An engineer configures an Alert Action in the CMC to send an...
Question 26: An engineer is adding an additional server to a chassis with...
Question 27: A new node is added to a VRTX to create a compute cluster. T...
Question 28: An engineer needs to re-purpose the storage of the chassis. ...
Question 29: An engineer is configuring a new FD332 storage sled into an ...
Question 30: An engineer needs to perform hardware configuration, includi...
Question 31: An engineer is building a new cluster and is using software-...
Question 32: An engineer is troubleshooting a blade server in an FX2s. Th...
Question 33: An engineer needs to update BIOS in the following environmen...
Question 34: An engineer is performing system updates on a large number o...
Question 35: (Exhibit) Refer to the exhibit. An engineer sets up FCoE boo...
Question 36: An engineer is configuring a new FD332 storage sled into an ...
Question 37: AN engineer needs server 1 in the chassis to be able to comm...
Question 38: A customer has five VRTXs in a chassis group that they need ...
Question 39: An engineer needs to replicate BIOS and NIC settings for ser...
Question 40: An engineer is redeploying a blade chassis, and is logged in...
Question 41: An engineer receives two new I/O Aggregators (IOAs) in defau...
Question 42: An engineer needs to configure a full height blade server an...
Question 43: An engineer needs to put chassis switches on a LAN that has ...
Question 44: (Exhibit) Refer to the exhibit. An engineer is configuring a...
Question 45: In VRTX the following features are enabled: 1. Server Module...
Question 46: An engineer has been given a new chassis and needs to config...
Question 47: A VRTX server is being set up for a new customer and configu...
Question 48: An engineer responsible for server lifecycle management (e.g...
Question 49: An engineer is in front of an FX2 chassis and notices the I/...
Question 50: An engineer needs to configure network port partitions for f...
Question 51: A VRTX server comes with two server modules. The customer re...
Question 52: An engineer is updating the IOM Infrastructure Device firmwa...
Question 53: Only one of the server nodes in the FX2s chassis can see the...
Question 54: An engineer has a blade chassis (VRTX) and is having connect...
Question 55: An engineer is installing a server node with a quad port 1Gb...
Question 56: An engineer is redeploying an PS-M4110 storage array in an M...
Question 57: An engineer is migrating an existing server node from an M10...
Question 58: An engineer has connected a monitor, keyboard, and mouse to ...
Question 59: An engineer is running an inventory report on a VRTX chassis...
Question 60: An engineer needs to use OME to monitor 4000 servers in the ...
Question 61: A new M1000e is being deployed in the data center. All initi...
Question 62: Network A is on VLAN 10. Network B is on VLAN 20. Physical e...
Question 63: An engineer needs to connect two MXL switches that both have...
Question 64: An engineer is installing an M1000e chassis and connecting i...
Question 65: An engineer is deploying a chassis with four IOAs and connec...