BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
Although the current MERV 11 filters in the return air ducts contribute toward compliance with Feature A04:
Construction Pollution Management, the installation of MERV 14 filters could help to achieve which additional feature?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (49q)
Question 1: An owner of a new commercial office building is interested i...
Question 2: What is the value of performance verification in the certifi...
Question 3: As a part of a new initiative of a hospital, the program lea...
Question 4: A new building project is to be located near a very busy roa...
Question 5: What is the intent of the Feature N02: Nutritional Transpare...
Question 6: A well-being team in a commercial office building is interes...
Question 7: To reduce sound transmission between adjacent spaces, constr...
Question 8: The WELL Building Standard (WELL) requires a project team to...
Question 9: An office pursuing WELL Certification offers no-cost group f...
Question 10: Which of the following describes the purpose of an alternati...
Question 11: The intent of Feature X01: Material Restrictions is to reduc...
Question 12: There is evidence to suggest that environments with poor aco...
Question 13: An employer will be leasing a new building that has one cent...
Question 14: A WELL AP is reviewing a zoning layout for a new WELL commer...
Question 15: What should the minimum size be for a restorative space in a...
Question 16: A project failed performance verification of the PM 2.5 thre...
Question 17: An office building is at the design stage. The client has th...
Question 18: Which of the following is an effective measure for a new con...
Question 19: A project team conducts a daylight simulation for an office ...
Question 20: In an office building where all of the occupants are under t...
Question 21: The Brightside Company is pursuing WELL Certification under ...
Question 22: A WELL AP is reviewing a client's waste management plan for ...
Question 23: A client of a commercial building reports odors and high-hum...
Question 24: The facilities management team of a project has ordered a cl...
Question 25: A food services company is trying to meet the health goals o...
Question 26: A well-being team in a commercial office building is interes...
Question 27: Which of the following steps can be most effective in reduci...
Question 28: Please click on the Project Scenario B button to review the ...
Question 29: The facility manager has implemented ultraviolet air treatme...
Question 30: A consultant on a WELL project is working with the design te...
Question 31: Which of the following can help a real estate investor selec...
Question 32: During an initial kick-off meeting for a project pursuing WE...
Question 33: For projects that include operable windows, which of the fol...
Question 34: A project's site previously housed a fuel station and an aut...
Question 35: What are possible impacts of poor lighting color rendering a...
Question 36: The WELL AP notices mold and fungal growth on some indoor wa...
Question 37: A project's interior designer is designing a room that will ...
Question 38: Which of the following hazardous materials have been restric...
Question 39: Which of the following strategies can be used to improve the...
Question 40: Occupants of a WELL Certified building are unfamiliar with W...
Question 41: A WELL AP is reviewing a zoning layout for a new WELL commer...
Question 42: A WELL AP is monitoring the ongoing submission of documents ...
Question 43: What requirement within C02: Integrative Design includes com...
Question 44: In addition to addressing a variety of emergency situations,...
Question 45: A WELL Certified space has a quiet room that can be utilized...
Question 46: According to the WELL Building Standard, approximately what ...
Question 47: Supplemental light fixtures are provided to occupants upon r...
Question 48: A project team has completed the stakeholder charrette and c...
Question 49: Which of the following chemicals can be added to the public ...