<< Prev Question Next Question >>

Question 68/115

A building manager is comparing the operating cost of the existing boiler to the purchase and operation of a new and more efficient boiler. The building manager discovers that although the upfront cost is significant, purchasing the new boiler would drastically decrease the cost of running and operating the system. This exercise is called

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (115q)
Question 1: In an effort to preserve the aquatic habitat and natural str...
Question 2: What is the percentage rule when making a decision on the ra...
Question 3: During which stage of a project is implementation of the Int...
Question 4: If a project has achieved 53 points and six of eight prerequ...
Question 5: An architect found a source for reclaimed wood doors from a ...
Question 6: Limiting the concentration of which of the following substan...
Question 7: The protection and restoration of natural vegetation, wetlan...
Question 8: Which of the following scenarios would potentially help a pr...
Question 9: Which is an example of regenerative design?...
Question 10: What is process water?
Question 11: Which of the following strategies is considered an approach ...
Question 12: Which of the following narratives explains the relationship ...
Question 13: The purpose of a life-cycle assessment in LEED is to evaluat...
Question 14: Which of the following processes is conducted prior to build...
Question 15: The LEED credits given the greatest weights are credits that...
Question 16: What unit is green power purchased in?...
Question 17: Which of the following Is a source of green power?...
Question 18: Where could a project be located to purchase Renewable Energ...
Question 19: Which Is a component of a construction waste management plan...
Question 20: Which is an example of a low-cost Water Efficiency strategy?...
Question 21: What is the maximum number of occupiable stories for a proje...
Question 22: The maximum points a new construction platinum LEED for Neig...
Question 23: Which label or certification indicates reduced water consump...
Question 24: Which of the following is a design and planning strategy for...
Question 25: What element of design can be used to take advantage of natu...
Question 26: Which of the following negative impacts on the environment a...
Question 27: A company is considering investing in green power for its op...
Question 28: The cradle-to-cradle approach to sustainable materials evalu...
Question 29: Strategies for improving building occupants' comfort and con...
Question 30: At which stage should the coordination of building and site ...
Question 31: What green building objective does utilizing high efficiency...
Question 32: A project that does not meet a prerequisite in one credit ca...
Question 33: In the context of a LEED project, the charrette is a...
Question 34: When considering water conservation and water efficient land...
Question 35: Up lo how many maximum points can a project earn under the R...
Question 36: When should the Commissioning Authority (CxA) be brought ont...
Question 37: During the pre-design phase of a three-story office building...
Question 38: ASHRAE standards are applicable to which of the following LE...
Question 39: What is a reason to clearly identify the project boundary?...
Question 40: Which industry benchmarking tool is used for measuring ongoi...
Question 41: Which of the following falls under the Energy and Atmosphere...
Question 42: In the commercial LEED rating systems, which point range wil...
Question 43: Which strategy is an example of permanent entryway systems u...
Question 44: Which term describes misinformation presented to consumers t...
Question 45: The project team wants to use low-flow toilet fixtures and i...
Question 46: When instituting a construction waste management plan, which...
Question 47: Which describes the difference between graywater and blackwa...
Question 48: The most efficient way for building users to rate the heatin...
Question 49: Open grid pavement tends to reduce...
Question 50: Which of the following concepts uses drought-tolerant native...
Question 51: Teams organize and work as part of an integrative process by...
Question 52: The Energy Policy Act of 1992 (EPAct of 1992), 2005 is a bas...
Question 53: Which of the following Is a strategy for improving Indoor En...
Question 54: A civil engineer would like to incorporate strategies for ra...
Question 55: During which stage of the conventional building process are ...
Question 56: The water use reduction for a project is determined by findi...
Question 57: Which of the following strategies contributes to reducing he...
Question 58: Which of the following practices ensures that building syste...
Question 59: Who completes and signs the credit templates for a project p...
Question 60: When considering strategies for reducing indoor water use, w...
Question 61: Use of which of the following can help reduce the heat gain ...
Question 62: What is considered as the receptacle load?...
Question 63: The general contractor for a project located in a dense urba...
Question 64: The LEED Project team performs an initial review that indica...
Question 65: Which of the following Is the recommended tool for the proje...
Question 66: Which of the following principles is a part of the integrate...
Question 67: An owner of newly acquired land wants to design a building t...
Question 68: A building manager is comparing the operating cost of the ex...
Question 69: The amount of landfill-destined waste generated during proje...
Question 70: The Increase in air temperature in a developed area resultin...
Question 71: Select the type of approach that promotes the conservation o...
Question 72: Which strategy for roof coverage best addresses both heat is...
Question 73: Which of the following water types is suitable for drinking?...
Question 74: Which of the following project characteristics demonstrate s...
Question 75: Which of the following standards addresses guidance for sust...
Question 76: In order to earn LEED certification, a project must...
Question 77: Which class of refrigerants contributes the most to ozone de...
Question 78: The LEED credit weightings. in regard to the most important ...
Question 79: Volatile organic compounds (VOCs) negatively impact which of...
Question 80: Building and material reuse contribute to the sustainability...
Question 81: What does the U.S. Green Building Council (USGBC) administer...
Question 82: According to systems thinking, climate change is an example ...
Question 83: Which of the following results from incorporating sustainabl...
Question 84: Which strategy promotes sustainable purchasing during constr...
Question 85: A building owner has set a goal of reducing water use by 20%...
Question 86: Which of the following is a benefit of a building owner choo...
Question 87: Which of the following does LEED promote by encouraging comp...
Question 88: Which of the following practices ensures that building syste...
Question 89: Which of the following tools should be used to identify indo...
Question 90: The Solar Reflective Index (SRI) applies to which concept?...
Question 91: Which of the following is a strategy that a design team shou...
Question 92: What is pre-consumer recycled content?...
Question 93: Which third party certification is recommended to use when s...
Question 94: Light trespass beyond the project boundary can be prevented ...
Question 95: At what phase should the charrette take place?...
Question 96: Which of the following team members should participate in th...
Question 97: Which of the following interior items contributes to a comfo...
Question 98: A retail store is pursuing LEED for Interior Design and Cons...
Question 99: Which of the following components comprise the Indoor Enviro...
Question 100: In a large site that has a short, intense rainy season and a...
Question 101: Which of the following demonstrates life-cycle approach to d...
Question 102: Which strategy can be used during the building process and a...
Question 103: Which of the following strategies meets energy demand with r...
Question 104: For benchmarking purposes, a baseline building performance i...
Question 105: LEED for Neighborhood Development encourages...
Question 106: A site with minimal hardscape that has a large permeable sur...
Question 107: What organization reviews and provides final LEED certificat...
Question 108: One of the requirements for the Sustainable Sites Credit. Ra...
Question 109: What is the scope of the LEED impact category component Prot...
Question 110: Which strategy will help build consensus for a project's sus...
Question 111: Which of the following is a tradable commodity representing ...
Question 112: Which of the following strategies prioritizes cost-effective...
Question 113: Which of the following may be awarded to a Green Building pr...
Question 114: The goal of regional priority credits is to incentivize proj...
Question 115: Designers and builders can construct a green building that u...