Valid C_TS422_2022 Dumps shared by ExamDiscuss.com for Helping Passing C_TS422_2022 Exam! ExamDiscuss.com now offer the newest C_TS422_2022 exam dumps, the ExamDiscuss.com C_TS422_2022 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com C_TS422_2022 dumps with Test Engine here:
which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 Correct answers to this question.
Correct Answer: A,B,C
When you save a confirmation for a finished product in repetitive manufacturing, the system performs the following actions by default12: Posting of production costs to the production cost collector: The system calculates the actual costs for the confirmed quantity and posts them to the production cost collector assigned to the product. The production cost collector is a cost object that collects the costs for all confirmations of a product in a plant for a period. Posting of goods receipt for the product: The system posts the confirmed quantity as a goods receipt to the warehouse. The product is valuated at the standard price defined in the material master record. The difference between the standard price and the actual costs is posted to a price difference account. Reduction of associated capacity requirements: The system reduces the capacity requirements for the work center where the confirmation was made. The capacity requirements are calculated based on the confirmed quantity and the standard values for setup, machine, and labor time in the routing. References: 1: Repetitive Manufacturing Confirmation | SAP Help Portal(https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/ee6ff9b281d8448f96b4fe6c89f2bdc8/66d Confirming Production in Repetitive Manufacturing | SAP Help Portal(https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/f899ce30af9044299d573ea30b533f1c/92