Valid C_TS422_2022 Dumps shared by ExamDiscuss.com for Helping Passing C_TS422_2022 Exam! ExamDiscuss.com now offer the newest C_TS422_2022 exam dumps, the ExamDiscuss.com C_TS422_2022 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com C_TS422_2022 dumps with Test Engine here:
in your Plant, MRP is activated. which options do you have to exclude a material from the MRP run? Note: there are 2 correct answers to this question.
Correct Answer: A,C
You can exclude a material from the MRP run by using a specific material status or a specific MRP type. A material status is a user-defined indicator that can be assigned to a material master record to control the procurement and planning activities for the material. For example, you can define a material status that blocks the material from being planned by MRP. An MRP type is a parameter that defines how a material is planned by MRP. For example, you can use the MRP type ND (No Planning) to exclude the material from the MRP run. References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 87; [SAP Help Portal: Material Status] and [SAP Help Portal: MRP Type].