Question 48/56

The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (56q)
Question 1: When working with both cross-plant and plant-specific materi...
Question 2: In Make-to-order production, which field controls whether th...
Question 3: How can you set up the supply source for the SAP Kanban proc...
Question 4: Which of the following elements does MRP take into account d...
Question 5: In which customizing activity do you set up automatic routin...
Question 6: You are transferring data from SAP S/4HANAIo embedded PP/OS....
Question 7: The pegging situation was changed because of an MRP heuristi...
Question 8: Which of the following processes lead to an entry in the MRP...
Question 9: What are examples of assignment objects you can maintain in ...
Question 10: How can you limit the validity of a bill of material (BOM)? ...
Question 11: In your project,you have several materials that are planned ...
Question 12: When do you use variant bills of materials (BOMs)?...
Question 13: What are the possible results of a production planning run i...
Question 14: The MRP run detected a shortage of a material that you sourc...
Question 15: What is the purpose of collective orders?...
Question 16: What do you use to schedule operations from planned orders s...
Question 17: Which time elements can be reduced by a reductionstrategy? N...
Question 18: Which bill of material (BOM) categories can you define in SA...
Question 19: You want to schedule an operation finitely, without moving o...
Question 20: What is a work center hierarchy in SAP S/4HANA capacity plan...
Question 21: Which of the following business processes are controlled by ...
Question 22: You want to insert an operation at a certain time on a work ...
Question 23: What are the consequences when you assign a planned order to...
Question 24: You want to triggering-houseproduction of a semi-finished ma...
Question 25: What are properties of MRP Live? There are 2 correct answers...
Question 26: The settings for MRP can be maintained at different levels. ...
Question 27: Which time elements are relevant for lead t me scheduling of...
Question 28: Which advanced functionality has been embedded in SAP S/4HAN...
Question 29: MRP created a planned order for a material that has one sing...
Question 30: A planner wants to interactively resolve an overload situati...
Question 31: What is the equivalent in SAP S/4HANA of the Production Data...
Question 32: Where do you maintain the duration of a producton operation?...
Question 33: Which of the following is a valid sequence of the main activ...
Question 34: You want to set up a make-to-order planning scenario for a f...
Question 35: In a production process, you need acertain amount of liquid ...
Question 36: What are the consequences if operation status Dispatched is ...
Question 37: You have a quality control check to avoid using a high-value...
Question 38: Which options do you have to plan both quant ties and capaci...
Question 39: Which time elements does MRP consider in backward scheduling...
Question 40: In which of the following master data objects can you define...
Question 41: What data processing steps are obsolete if you use SAP S/4HA...
Question 42: Which options are available for an SAP S/4HANA deployment? T...
Question 43: Your client is asking for your advice on material master num...
Question 44: What are possible configuration steps when setting up the al...
Question 45: Which SAP solutions support the supplier area in the portfol...
Question 46: During planning you are facing an overload situation on a re...
Question 47: An issue storage location was NOT found through the work cen...
Question 48: The production plan is being disrupted by last minute demand...
Question 49: How would you define pegging in the context of Advanced Plan...
Question 50: Which chart types does the tabular planning table provide in...
Question 51: Advanced Planning uses master data and transaction data from...
Question 52: At the end of the MRP run you receive the exception message ...
Question 53: For a production version to be valid and consistent what req...
Question 54: What could be the reason for multiple commitment of individu...
Question 55: Which SAP solutions can be used for forecast ng in Supply Ch...
Question 56: You want to schedule an order in the graphical planning boar...