Question 29/56

MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (56q)
Question 1: When working with both cross-plant and plant-specific materi...
Question 2: In Make-to-order production, which field controls whether th...
Question 3: How can you set up the supply source for the SAP Kanban proc...
Question 4: Which of the following elements does MRP take into account d...
Question 5: In which customizing activity do you set up automatic routin...
Question 6: You are transferring data from SAP S/4HANAIo embedded PP/OS....
Question 7: The pegging situation was changed because of an MRP heuristi...
Question 8: Which of the following processes lead to an entry in the MRP...
Question 9: What are examples of assignment objects you can maintain in ...
Question 10: How can you limit the validity of a bill of material (BOM)? ...
Question 11: In your project,you have several materials that are planned ...
Question 12: When do you use variant bills of materials (BOMs)?...
Question 13: What are the possible results of a production planning run i...
Question 14: The MRP run detected a shortage of a material that you sourc...
Question 15: What is the purpose of collective orders?...
Question 16: What do you use to schedule operations from planned orders s...
Question 17: Which time elements can be reduced by a reductionstrategy? N...
Question 18: Which bill of material (BOM) categories can you define in SA...
Question 19: You want to schedule an operation finitely, without moving o...
Question 20: What is a work center hierarchy in SAP S/4HANA capacity plan...
Question 21: Which of the following business processes are controlled by ...
Question 22: You want to insert an operation at a certain time on a work ...
Question 23: What are the consequences when you assign a planned order to...
Question 24: You want to triggering-houseproduction of a semi-finished ma...
Question 25: What are properties of MRP Live? There are 2 correct answers...
Question 26: The settings for MRP can be maintained at different levels. ...
Question 27: Which time elements are relevant for lead t me scheduling of...
Question 28: Which advanced functionality has been embedded in SAP S/4HAN...
Question 29: MRP created a planned order for a material that has one sing...
Question 30: A planner wants to interactively resolve an overload situati...
Question 31: What is the equivalent in SAP S/4HANA of the Production Data...
Question 32: Where do you maintain the duration of a producton operation?...
Question 33: Which of the following is a valid sequence of the main activ...
Question 34: You want to set up a make-to-order planning scenario for a f...
Question 35: In a production process, you need acertain amount of liquid ...
Question 36: What are the consequences if operation status Dispatched is ...
Question 37: You have a quality control check to avoid using a high-value...
Question 38: Which options do you have to plan both quant ties and capaci...
Question 39: Which time elements does MRP consider in backward scheduling...
Question 40: In which of the following master data objects can you define...
Question 41: What data processing steps are obsolete if you use SAP S/4HA...
Question 42: Which options are available for an SAP S/4HANA deployment? T...
Question 43: Your client is asking for your advice on material master num...
Question 44: What are possible configuration steps when setting up the al...
Question 45: Which SAP solutions support the supplier area in the portfol...
Question 46: During planning you are facing an overload situation on a re...
Question 47: An issue storage location was NOT found through the work cen...
Question 48: The production plan is being disrupted by last minute demand...
Question 49: How would you define pegging in the context of Advanced Plan...
Question 50: Which chart types does the tabular planning table provide in...
Question 51: Advanced Planning uses master data and transaction data from...
Question 52: At the end of the MRP run you receive the exception message ...
Question 53: For a production version to be valid and consistent what req...
Question 54: What could be the reason for multiple commitment of individu...
Question 55: Which SAP solutions can be used for forecast ng in Supply Ch...
Question 56: You want to schedule an order in the graphical planning boar...