<< Prev Question Next Question >>

Question 2/31

You want to procure your material components based on a forecast for the finished material derived
from historical sales. When customers order, you produce the finished product and reserve it for that
particular order.
Which is the appropriate planning strategy to use?
Please choose the correct answer.
Response:

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (31q)
Question 1: A resource was created in SAP S/4HANA PP/DS through the inte...
Question 2: You want to procure your material components based on a fore...
Question 3: In Make-to-order production, which field controls whether th...
Question 4: In order to use strategy 70 - Planning At Assembly Level, wh...
Question 5: What is SAP's strategic solution to perform Sales and Operat...
Question 6: Which task list types can have parallel sequences? There are...
Question 7: Your customer complains about incorrect duration for product...
Question 8: A customer is considering switching from order-related settl...
Question 9: On which of the following levels can you influence the avail...
Question 10: Which functional capabilities does the Detailed Scheduling B...
Question 11: Before a user can add multiple production versions in a mate...
Question 12: In which customizing activity do you set up automatic routin...
Question 13: A planner updated a production order status from partially c...
Question 14: The procurement type of your material is set to "E" for In-h...
Question 15: You are using heuristic SAP_ERP_001. Which of the following ...
Question 16: In which of the following master data objects can you define...
Question 17: What steps are possible in a PP/DS production planning run? ...
Question 18: Which of the following is an advantage of MRP Live and NOT a...
Question 19: In which data object is the production line (Repetitive manu...
Question 20: What Kanban status automatically posts goods receipt with re...
Question 21: The material master of your finished product contains MRP ty...
Question 22: The settings for MRP can be maintained at different levels. ...
Question 23: Which of the following are included as SAP S/4HANA Sales Sim...
Question 24: What is the correct sequence of the following Activate metho...
Question 25: The pegging situation was changed because of an MRP heuristi...
Question 26: What does the bill of material usage (BOM usage) control at ...
Question 27: A planner wants to interactively resolve an overload situati...
Question 28: Where can you maintain consumption mode and consumption peri...
Question 29: Which times are used for Basic Date Scheduling of manufactur...
Question 30: When do you recommend the use of repetitive manufacturing? T...
Question 31: Which of these are layers in SAP Best Practice content? Ther...