<< Prev Question Next Question >>

Question 11/31

Before a user can add multiple production versions in a material master, what information should be
collected?
There are 3 correct answers to this question.
Response:

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (31q)
Question 1: A resource was created in SAP S/4HANA PP/DS through the inte...
Question 2: You want to procure your material components based on a fore...
Question 3: In Make-to-order production, which field controls whether th...
Question 4: In order to use strategy 70 - Planning At Assembly Level, wh...
Question 5: What is SAP's strategic solution to perform Sales and Operat...
Question 6: Which task list types can have parallel sequences? There are...
Question 7: Your customer complains about incorrect duration for product...
Question 8: A customer is considering switching from order-related settl...
Question 9: On which of the following levels can you influence the avail...
Question 10: Which functional capabilities does the Detailed Scheduling B...
Question 11: Before a user can add multiple production versions in a mate...
Question 12: In which customizing activity do you set up automatic routin...
Question 13: A planner updated a production order status from partially c...
Question 14: The procurement type of your material is set to "E" for In-h...
Question 15: You are using heuristic SAP_ERP_001. Which of the following ...
Question 16: In which of the following master data objects can you define...
Question 17: What steps are possible in a PP/DS production planning run? ...
Question 18: Which of the following is an advantage of MRP Live and NOT a...
Question 19: In which data object is the production line (Repetitive manu...
Question 20: What Kanban status automatically posts goods receipt with re...
Question 21: The material master of your finished product contains MRP ty...
Question 22: The settings for MRP can be maintained at different levels. ...
Question 23: Which of the following are included as SAP S/4HANA Sales Sim...
Question 24: What is the correct sequence of the following Activate metho...
Question 25: The pegging situation was changed because of an MRP heuristi...
Question 26: What does the bill of material usage (BOM usage) control at ...
Question 27: A planner wants to interactively resolve an overload situati...
Question 28: Where can you maintain consumption mode and consumption peri...
Question 29: Which times are used for Basic Date Scheduling of manufactur...
Question 30: When do you recommend the use of repetitive manufacturing? T...
Question 31: Which of these are layers in SAP Best Practice content? Ther...