Valid C_S4EWM_2023 Dumps shared by ExamDiscuss.com for Helping Passing C_S4EWM_2023 Exam! ExamDiscuss.com now offer the newest C_S4EWM_2023 exam dumps, the ExamDiscuss.com C_S4EWM_2023 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com C_S4EWM_2023 dumps with Test Engine here:
You are using delivery-based production integration. Which of the following are created for the outbound delivery in SAP ERP for staging? Note: There are 2 correct answers to this question.
Correct Answer: B,D
Comprehensive and Detailed In-Depth Explanation: In delivery-based production integration, staging involves specific documents. Option B ("A production material request in the supplying warehouse...") is correct as a PMR is created for cross-warehouse staging, and option D ("An outbound delivery order in SAP EWM...") is correct when EWM manages the supplying location, both configured in SPRO: SCM Extended Warehouse Management > Advanced Production Integration. Options A and C are incorrect as they don't align with standard staging document flows.