Valid Fire-Inspector-II Dumps shared by ExamDiscuss.com for Helping Passing Fire-Inspector-II Exam! ExamDiscuss.com now offer the newest Fire-Inspector-II exam dumps, the ExamDiscuss.com Fire-Inspector-II exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com Fire-Inspector-II dumps with Test Engine here:
A required standpipe shall be installed when the progress of construction above the lowest level of fire department access reaches a maximum of __ ft.
Correct Answer: D
1. Standpipe Requirements in Construction According to International Fire Code (IFC) 2021, Section 3313.1, a temporary standpipe must be installed when construction progresses above 75 feet from the lowest level of fire department access. This ensures firefighters have adequate water supply access during high-rise construction. 2. Why the 75-Foot Requirement? Buildings exceeding 75 feet are classified as high-rise structures, where fire department hose streams may not reach upper levels efficiently. A standpipe system provides a reliable water source for fire suppression during construction, reducing fire risk. 3. Verification of Other Options Option A (30 feet) - Incorrect, as standpipes are not required at this height under IFC regulations. Option B (40 feet) - Incorrect, as this is below the high-rise threshold and does not require standpipes yet. Option C (55 feet) - Incorrect, as IFC specifically mandates standpipes at 75 feet, not 55 feet. Reference Sources: International Fire Code (IFC) 2021 - Section 3313.1 (Temporary Standpipe Requirements for Construction) NFPA 14: Standard for the Installation of Standpipes and Hose Systems ICC Fire Inspector II Study Guide (2021) Thus, the correct and verified answer is: D. 75 feet. #