Valid HPE0-S50 Dumps shared by ExamDiscuss.com for Helping Passing HPE0-S50 Exam! ExamDiscuss.com now offer the newest HPE0-S50 exam dumps, the ExamDiscuss.com HPE0-S50 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com HPE0-S50 dumps with Test Engine here:
A Synergy integrator is configuring an HPE Synergy environment with two HPE Virtual Connect SE 40Gb F8 modules. The Synergy integrator has four 40Gb uplinks connected to two upstream switches and needs all compute modules to share the full 160Gb of available bandwidth. The upstream switches are interconnected in a virtual port channel (vPC) pair. What should the integrator do to ensure that the switch configuration does not result in a network loop?
Correct Answer: C
Recent Comments (The most recent comments are at the top.)
Don - May 27, 2019
To get 4 x 40 Gbit you can not use Spanning Tree, the protocol will shut down any redundant path. B with MLAG and cross connect is the right answer.
Recent Comments (The most recent comments are at the top.)
To get 4 x 40 Gbit you can not use Spanning Tree, the protocol will shut down any redundant path. B with MLAG and cross connect is the right answer.