Valid CDCS Dumps shared by ExamDiscuss.com for Helping Passing CDCS Exam! ExamDiscuss.com now offer the newest CDCS exam dumps, the ExamDiscuss.com CDCS exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com CDCS dumps with Test Engine here:
From the options indicated, what is the correct starting point for the raised floor installation?
Correct Answer: B
When installing a raised floor, the best starting point is typically from the farthest corner away from the entrance, in this case, Point B. This method allows for the floor installation to progress towards the entrance, ensuring that workers can avoid walking over the newly installed tiles, thus minimizing the risk of damage and maintaining cleanliness during installation. Detailed Explanation: Starting at the farthest corner (Point B) and working towards the entrance (Point A) is a standard practice in raised floor installation. This approach ensures that installers do not walk over freshly laid tiles, which could lead to shifting or misalignment. Additionally, it allows for more controlled placement and alignment, as well as convenient egress when installation is complete. EPI Data Center Specialist References: EPI guidelines for raised floor installation emphasize beginning at the farthest point from the entrance and working back towards it, which aligns with industry best practices for efficiency and quality assurance. This method reduces potential damage and supports precise alignment across the floor area.