Valid D-VXB-DY-A-24 Dumps shared by ExamDiscuss.com for Helping Passing D-VXB-DY-A-24 Exam! ExamDiscuss.com now offer the newest D-VXB-DY-A-24 exam dumps, the ExamDiscuss.com D-VXB-DY-A-24 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com D-VXB-DY-A-24 dumps with Test Engine here:
A customer is planning to integrate a VxBlock to a new Cisco ACI fabric. What major physical connectivity change is needed if the customer intends to convert their existing VxBlock Nexus 9396PX switches to ACI mode?
Correct Answer: A
To convert existing VxBlock Nexus 9396PX switches to ACI mode, a major physical connectivity change involves connecting the switch directly to the APIC (Application Policy Infrastructure Controller) to download the ACI software. Afterward, the existing Nexus 9396PX switches should be connected to a spine Nexus 93180YC switch as part of the ACI fabric setup. References: * Cisco ACI deployment guides. * Dell EMC VxBlock system integration documentation.