<< Prev Question Next Question >>

Question 2/38

A Customer Engineer just connected to their new VxBlock 1000 that was shipped with NSX. From where can the Customer Engineer confirm that the correct vSphere clusters are prepared for NSX?

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (38q)
Question 1: In the Enhanced Knowledge Transfer Phase, what is the correc...
Question 2: A Customer Engineer just connected to their new VxBlock 1000...
Question 3: A customer has an existing ACI fabric. Their management has ...
Question 4: A customer is using Cisco UCS 6332-16UP 40-Port Fl. They hav...
Question 5: Match each role to its responsibility. (Exhibit)...
Question 6: Which switch provides FC connectivity between Cisco UCS host...
Question 7: What is a primary use of the RCM Assessment Workbook?...
Question 8: A customer is planning to integrate a VxBlock to a new Cisco...
Question 9: Based on CPSD guidelines for VxBlock 1000, how many UCS chas...
Question 10: What is the responsibility of the Implementation Specialist ...
Question 11: A System Engineer is validating system cabling for a VxBlock...
Question 12: A customer engineer is unable to securely connect to vCenter...
Question 13: Match each team member with their RACI role. (Exhibit)...
Question 14: In an existing VxBlock 1000 system, the compute servers are ...
Question 15: A System Engineer has completed a VxBlock 1000 system instal...
Question 16: What order of steps is taken when using an NSX edge service ...
Question 17: What type of topology does the ACI fabric use?...
Question 18: Which document includes a complete list of tools used to per...
Question 19: A standard virtual switch is deployed on an ESXi host. Four ...
Question 20: What is a licensed feature of Isilon OneFS?...
Question 21: Which file system architecture is used on Isilon storage to ...
Question 22: Where is customer feedback captured during the Lessons Learn...
Question 23: Which logical entity in ACI allows for logical separation an...
Question 24: A System Engineer is working on an implementation of the VxB...
Question 25: During which phase of the RCM Upgrade process is the custome...
Question 26: An Implementation Specialist is connecting the Management sw...
Question 27: (Exhibit) Refer to the exhibit. A cable with the following l...
Question 28: A VxBlock 1000 system is being deployed at a customer site. ...
Question 29: What is a key benefit VxLAN?
Question 30: What is encapsulated by a VxLAN?...
Question 31: Which NSX component communicates with the VTEP?...
Question 32: Who is responsible for raising the Internal Assessment (IA) ...
Question 33: What service is provided by a VMKernel NIC?...
Question 34: Who is an optional resource during an RCM upgrade escalation...
Question 35: A VxBlock 1000 is running VMware vSphere 6.7. To support an ...
Question 36: In addition to the Final Test Plan and Customer Satisfaction...
Question 37: You are expanding a PowerMax 8000. What is the maximum allow...
Question 38: Which document contains all software baseline information po...