Valid SY0-601 Dumps shared by ExamDiscuss.com for Helping Passing SY0-601 Exam! ExamDiscuss.com now offer the newest SY0-601 exam dumps, the ExamDiscuss.com SY0-601 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com SY0-601 dumps with Test Engine here:
An analyst is working on an investigation with multiple alerts for multiple hosts. The hosts are showing signs of being compromised by a fast-spreading worm. Which of the following should be the next step in order to stop the spread?
Correct Answer: D
Placing all known-infected hosts on an isolated network is the best way to stop the spread of a worm infection. This will prevent the worm from reaching other hosts on the network and allow the infected hosts to be cleaned and restored. Disconnecting every host from the network is not practical and may disrupt business operations. Running an AV scan on the entire network or scanning the hosts that show signs of infection may not be effective or fast enough to stop a fast-spreading worm.