A server technician is installing a new server OS on legacy server hardware. Which of the following should the technician do FIRST to ensure the OS will work as intended?
Correct Answer: A
Explanation The first thing that the technician should do before installing a new server OS on legacy server hardware is to consult the HCL (Hardware Compatibility List) to ensure everything is supported. The HCL is a list of hardware devices and components that are tested and certified to work with a specific OS or software product. The HCL helps to avoid compatibility issues and performance problems that may arise from using unsupported or incompatible hardware. Migrating the physical server to a virtual server may be a good option to improve scalability and flexibility, but it requires additional hardware and software resources and may not be feasible for legacy server hardware. Low-level formatting the hard drives may be a good practice to erase any old data and prepare the drives for a new OS installation, but it does not guarantee that the hardware will work with the new OS. Making sure the case and the fans are free from dust may be a good practice to ensure proper cooling and prevent overheating, but it does not guarantee that the hardware will work with the new OS. References: https://www.howtogeek.com/190014/virtualization-basics-understanding-techniques-and-fundamentals/ https://www.howtogeek.com/173353/how-to-low-level-format-or-write-zeros-to-a-hard-drive/ https://www.howtogeek.com/303282/how-to-manage-your-pcs-fans-for-optimal-airflow-and-cooling/