Valid HPE0-S22 Dumps shared by ExamDiscuss.com for Helping Passing HPE0-S22 Exam! ExamDiscuss.com now offer the newest HPE0-S22 exam dumps, the ExamDiscuss.com HPE0-S22 exam questions have been updated and answers have been corrected get the newest ExamDiscuss.com HPE0-S22 dumps with Test Engine here:

Access HPE0-S22 Dumps Premium Version
(98 Q&As Dumps, 35%OFF Special Discount Code: freecram)

Online Access Free HPE0-S22 Exam Questions

Exam Code:HPE0-S22
Exam Name:Architecting Advanced HPE Server Solutions
Certification Provider:HP
Free Question Number:56
Version:v2018-03-07
Rating:
# of views:1539
# of Questions views:34454
Go To HPE0-S22 Questions

Recent Comments (The most recent comments are at the top.)

Zack - Apr 28, 2019

No.# jim is right. Answer A

Jim - Aug 06, 2018

No.# B. Apollo r2800.
r2800 has the ability for flexible drive mapping per server so you can customize per need capacity for the compute and storage nodes.

Jim - Aug 06, 2018

No.# A is the correct answer.
WBEM is not used since HPE introduced AMS (Agentless Management Service).

Jim - Aug 06, 2018

No.# Alteast one FC HBA in each nPar. (page 294 of study book)
So correct is answer A (slot 1 and slot 2)

Jim - Aug 06, 2018

No.# A answer seems to be the most relevant.

UEFI was introduced in ESXI V5.0 and later.
UEFI secure boot was introduced in ESXI V6.5
From the above we conclude that B and C answers are false.
D answer is irrelevant to the question and has to do with size of the disk been supported.

jim - Aug 03, 2018

No.# A. CMU is correct as the icsp is an alternative but more expensive because it can monitor and manage which is not needed in this solution.

jim - Aug 03, 2018

No.# A. Add a second 45XGc and 4QSFP is the correct answer in order to have redundant 10GbE links.

jim - Aug 03, 2018

No.# C. single path distribution with no redundancy. (page 55 from study book)

jim - Aug 03, 2018

No.# A. When there is SAN involved is correct answer.

jim - Jul 28, 2018

No.# D. replace with m710p.
All other answers are incorrect.

jim - Jul 28, 2018

No.# B. is correct - daisy chain all iLO CM Module is valid on the Moonshot chassis.

jim - Jul 28, 2018

No.# A. Incorrect
B. Incorrect -- 99.99% equals to less than 53m downtime per year
C. Incorrect
D. CORRECT -- 99.999% equals 5.3m per year or 53m over 10 years

jim - Jul 28, 2018

No.# A. RDMA is the correct answer for highly parallel communication

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Other Version
465 viewsHP.HPE0-S22.v2021-08-12.q34
1586 viewsHP.HPE0-S22.v2018-11-13.q47
1124 viewsHP.HPE0-S22.v2018-09-19.q40
Exam Question List
1 commentQuestion 1: Which statement describes the availability metrics for an HP...
Question 2: DRAG DROP Select all that apply. Click and drag the Network ...
Question 3: A customer has HPE BladeSystem BL460c Gen9 blades with two p...
Question 4: How does the HPE c7000 BladeSystems use of network infrastru...
Question 5: A customer requests a proposal for an HPE Apollo 4530 system...
Question 6: An architect is planning an HPE Moonshot System solution to ...
1 commentQuestion 7: An architect is planning an HPE Moonshot System deployment. ...
Question 8: A customer plans to purchase some c7000 blade enclosures equ...
Question 9: What is a basic assumption for an architect using the HPE Se...
Question 10: A customer needs an HPE Apollo 6000 solution and Remote Dire...
Question 11: An architect proposes an HPE Moonshot server solution for a ...
Question 12: A customer needs a live transcoding solution that meets the ...
Question 13: A customer is planning to migrate from a Virtual Connect Ent...
1 commentQuestion 14: An architect is planning an HPE Moonshot System to host a cu...
Question 15: An architect is planning an HPE Moonshot solution with m710p...
Question 16: An architect is proposing an HPE Moonshot System, including ...
Question 17: An architect reviews an HPE Apollo 6000 design and finds tha...
Question 18: View the Exhibit. (Exhibit) Refer to the exhibit. A customer...
1 commentQuestion 19: An architect has selected the FlexibleLOM option fur HPE XL2...
2 commentQuestion 20: An architect is designing an HPE Apollo 6000 solution to sup...
Question 21: A customer needs a server infrastructure update for its Hado...
Question 22: An architect needs to demonstrate the financial advantages o...
1 commentQuestion 23: Which discussion point describes a Tier I approach to datace...
Question 24: A customer needs to streamline monitoring to its HPE Apollo ...
1 commentQuestion 25: An architect proposes an HPE Moonshot 1500 chassis with m710...
Question 26: A customer plans to use Insight Control server provisioning ...
Question 27: An architect explains a software-defined data center (SDDC) ...
Question 28: A customer has an HPE Integrity Superdome X system with an n...
Question 29: An architect finds several vulnerabilities with a customer's...
1 commentQuestion 30: An architect is proposing a solution that has two HPE Moonsh...
Question 31: An architect needs to design a solution for a customer that ...
Question 32: A customer needs a hosted physical desktop solution. Users w...
1 commentQuestion 33: A customer is considering upgrading from a BL460c Gen8 to a ...
Question 34: An architect is writing a response to a Request for Proposal...
1 commentQuestion 35: An architect is planning an HPE Integrity Superdome X soluti...
1 commentQuestion 36: A customer has a mixed environment based on the G6, G7, Gen8...
Question 37: A customer has a large Oracle-based ERP solution that runs o...
Question 38: What defines lease rate factor (LRF)?...
Question 39: Which factors must the architect consider to help define an ...
Question 40: A customer is planning a multi-threaded HPC solution that wo...
1 commentQuestion 41: A customer needs high performance computing (HPC) and a smal...
Question 42: An architect is determining the amount of memory to propose ...
Question 43: Which of the HPE Transformation Areas should the architect d...
Question 44: A customer has 1,000 virtual machines that run on VMware ESX...
Question 45: A customer is deploying HPE Apollo Systems, which the custom...
Question 46: A customer recently purchased an HPE Moonshot chassis to hos...
Question 47: A software development customer's data center has servers fr...
Question 48: An architect is choosing between 1GbE and 10GbE connectivity...
Question 49: During a data center transformation discussion, an architect...
Question 50: A customer has an HPE Integrity Superdome X solution. The cu...
Question 51: An architect is designing a data center solution that contai...
Question 52: An architect takes the following notes during a meeting with...
Question 53: An architect is designing an HPE Apollo 6000 solution to sup...
Question 54: A customer has a Hadoop big data and analytics solution. The...
Question 55: An architect plans to propose a solution and illustrate how ...
Question 56: A customer's Gen9 web server resides behind a firewall. What...